The English translation is believed to be accurate. In case of discrepancies, the German version controls.
Group Business Platform
Supplier Guide for Product Development
This document is only to be understood as a guide. It offers, on the one hand, an overview of Volkswagen in-house standards,
requirements, and reference literature which can be retrieved from the Volkswagen Group Business Platform, and on the other,
demonstrates their significance within the development process. This guide is not a replacement for the documents and
requirements named above.
This document is not legally binding and does not commit the parties to enter into any contractual agreement whatsoever. The
copyrights for this document are held by the Volkswagen Group. It may therefore only be used as part of activities in connection
with the Volkswagen Group.
All information and data in this guide were compiled by the Volkswagen Group to the best of its knowledge and belief. Neither
the Volkswagen Group, its Group Board of Management, nor any of its employees, agents, or subsidiaries provide any
guarantee or warranty (express or implied) or assume any responsibility with respect to the validity, accuracy, or completeness
of the information contained in this guide. In addition, the Volkswagen Group does not assume any responsibility for damage,
losses, or costs resulting from any errors or omissions contained in this document. This likewise applies without limitation to
direct and consequential losses.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
2
© Volkswagen AG, 1446, Group Development Management
It is the declared goal of the Volkswagen Group to develop and produce high-quality,
efficient, and environmentally friendly vehicles for the 21st century.
The realignment of the Volkswagen Group, triggered by the events surrounding the diesel
issue, has led to numerous changes that necessitate a new edition of this Supplier Guide.
The impact of this realignment is reflected in new organizational structures which are
presented in the sections of part 1 of this edition.
As before, part 2 explains the development and release procedures as well as any IT system
requirements to be met by the supplier. The aim is to provide basic information necessary for
a successful partnership with the Volkswagen Group companies and thereby to promote
effective supplier integration.
A key to reaching this aim is the integration of our suppliers – both local and international – in
the development process of the vehicle and powertrain projects.
This edition has been updated to reflect the latest developments in the Volkswagen Group.
Wolfsburg, Germany,
December 1st, 2017
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
3
© Volkswagen AG, 1446, Group Development Management
Contents
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
4
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
5
© Volkswagen AG, 1446, Group Development Management
Guideline structure
Part 1 – General
Part 2 – Core processes Part 3 – Appendix
information
2.1 Procurement process
1.1 Key figures and 2.2 Volkswagen Group product 3.1 Terms and definitions
organizational structure of emergence process
3.2 Forms
the Volkswagen Group
2.3 Approval processes within the
3.3 Source of Supplier Guide
1.2 Latest developments product emergence process
for Product Development
1.3 Organizational structure of 2.4 Project management – basic
the Design Engineering requirements
division
2.5 Purchase parts management
1.4 Organizational structure of
2.6 Change management
vehicle projects
2.7 Prototype-related processes and
1.5 Vehicle project
requirements
nomenclature
2.8 Materials-related processes and
requirements
2.9 Requirements for IT systems in
product development
2.10 Introduction to Quality
Assurance documents and
systems
For better readability, important sections of the guide are highlighted in the margin with an
exclamation mark.
Please pay special attention to these sections.
The electronic version of this document contains hyperlinks that refer to specific pages of the
Volkswagen Group Business Platform. These links are identified in the document by the
following icon:
Note: To reflect the local specifics of individual Group companies, variants of this guide have
been created for Audi Mexico, the Volkswagen Group of America, the Volkswagen Group
China and for Volkswagen Group Russia.
These can be obtained from the companies or on the Group Business Platform.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
6
© Volkswagen AG, 1446, Group Development Management
Part 1
–
General information
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
7
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
8
© Volkswagen AG, 1446, Group Development Management
The current key figures of the Volkswagen Group are summarized in figure 2.
The Volkswagen Group currently has over 120 production sites worldwide (as of March
2017):
http://www.volkswagenag.com/content/vwcorp/content/de/the_group/production_plants.html
The passenger car product lineup of the Volkswagen Group ranges from fuel efficient
compact cars to luxury and sports cars. In the commercial vehicle sector, the spectrum
begins with pickups and extends to buses and heavy trucks. Volkswagen Group vehicles are
sold in 153 countries.
Each Group brand has its own character and operates independently on the global markets.
An overview of the models can be found here:
http://www.volkswagenag.com/content/vwcorp/content/de/brands_and_products.html
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
9
© Volkswagen AG, 1446, Group Development Management
Functional
Chairman of the Board Functional Functional
Responsibility
of the Volkswagen Responsibility Responsibility
‚China‘ ‚Human Resources and
Passenger Cars brand ‚Procurement‘
Organization‘
The individual Group brands have their own organizational structures. A list of links to the
individual brands' websites and business divisions can be found via the above link.
This guide focuses on the processes, requirements, and systems relevant to the
Development division. The division's structure and responsibilities are described in more
detail in section 1.3 "Organizational structure of the Development division."
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
10
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
11
© Volkswagen AG, 1446, Group Development Management
The organizational structure of the brands' Development divisions is geared toward the
respective individual responsibilities. As an example, the structure of the Volkswagen
Passenger Car brand is as follows:
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
12
© Volkswagen AG, 1446, Group Development Management
Figure 6 offers an overview of the development centers and technical offices of the
Volkswagen Group worldwide.
Figure 6: Worldwide locations of the development centers and technical offices of the Volkswagen Group
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
13
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
14
© Volkswagen AG, 1446, Group Development Management
Under the premises of devising a new nomenclature that would meaningfully expand on the
current system while also being highly recognizable, the following structure was developed
and agreed upon across multiple divisions:
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
15
© Volkswagen AG, 1446, Group Development Management
Note: Each vehicle and powertrain project is assigned an internal project code, such as
VW370 (current Volkswagen Golf) or EA888 (engine).
In addition, a so-called technical vehicle or powertrain class code, such as 5G0 (current
Volkswagen Golf) or 06J (EA888 engine), is specified for each project.
The class code is incorporated in part numbers and corresponding documents (e.g.,
engineering drawings) as a front number indicating the respective vehicle or powertrain
project.
The structure of the part numbers used in the Volkswagen Group is shown in figure 10.
___
Vehicle class/
base engine
_Subgroup
__ ___ __
Version
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
16
© Volkswagen AG, 1446, Group Development Management
Part 2
–
Core processes
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
17
© Volkswagen AG, 1446, Group Development Management
2.1.1 Introduction
The Procurement division of the Volkswagen Group is divided into Production Materials
Procurement and General Procurement. Production Materials Procurement is broken down
further into the commodities shown in figure 11.
Procurement decisions in the Volkswagen Group are made by the Corporate Sourcing
Committee (CSC). The decisions of this committee are effective across all brands.
In addition to the central Procurement divisions of each brand, the Volkswagen Group uses
regional sourcing offices (RSO) to develop new sourcing markets and to expand those
already in existence.
Figure 12 illustrates the current activities of regional sourcing offices worldwide.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
18
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
19
© Volkswagen AG, 1446, Group Development Management
Forward Sourcing
Suppliers with high
For new parts
development share and
• In existing models subsequent
• In new models manufacturing
responsibility
Figure 14: Differentiation between the Forward Sourcing and Global Sourcing processes
The Forward Sourcing process is used for new projects and is combined with the supplier
readiness management process up until product launch. This process, which is based on the
gate principle, ensures that suppliers are able to supply the relevant packages in the required
quantity and quality at the Start of Production (SOP), which in turn reduces project risk.
The Global Sourcing process, on the other hand, is not applied until after a product has been
launched and is accompanied by a supplier readiness management process with various
gates.
More information on the supplier readiness management process for Forward Sourcing and
Global Sourcing can be found in section 2.5 "Supplier readiness management."
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
20
© Volkswagen AG, 1446, Group Development Management
1 2 3
Supplier self-registration Release process for
Supplier selection Forward Sourcing
and quotation
Supplier is nominated;
Supplier is pre-selected start of development Production release
process as initial supplier
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
21
© Volkswagen AG, 1446, Group Development Management
VDA 6.3
"Quality Not quality
Process Quality Evaluation of the quality
Quality-capable
capable;
Management in the
Assurance Quality- with conditions;
audit capability for certain Automobile Industry nomination
division capable plan of action
products/product groups – Process Audit” and currently not
required
and their processes “Formula Q – possible
Capability"
Figure 16: Overview of the contents of the Development audit and process audit for supplier selection
The final sourcing decisions made by the Volkswagen Group are based, on the one
hand, on the information provided by all parties involved and, on the other hand, on
strategic considerations and the competitiveness of the submitted quotations. It
should be mentioned here that all sourcing decisions are reached unanimously.
Phase 3 – Release process for Forward Sourcing
In this phase, the Volkswagen Group monitors the performance of the supplier within
the respective project. The supplier readiness management process is applied for
priority parts. Gates – measurement points for rating supplier performance – are
employed and component-specific releases are monitored. The individual gates are
closely linked to the vehicle milestones. This allows tracking of engineering releases
(K-release) and ensures that the sample parts are delivered for the respective
milestone. The supplier readiness management process is monitored and controlled
by so-called supplier readiness management teams (SRM teams). These teams
consist of representatives from different departments and are responsible for the
following:
Conducting regular project meetings
Monitoring the suppliers continuously.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
22
© Volkswagen AG, 1446, Group Development Management
1 2 3
Purchase parts
Supplier self-registration
Supplier selection management – Global
and quotation Sourcing
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
23
© Volkswagen AG, 1446, Group Development Management
Note: The Group Business Platform has special applications for suppliers of each division
(e.g., Procurement, Quality Assurance, Development). If one or more of the applications
mentioned in this supplier guide are not available to you, please have them activated by B2B
Support.
B2B Support can be reached at the following address:
b2bteam@vwgroupsupply.com
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
24
© Volkswagen AG, 1446, Group Development Management
The contact details of B2B Support can be found in the "Help" area of the Group Business
Platform. Figure 19 shows the "Help" area on the platform and includes an example of
integrated applications.
Registration process
As described in section 2.1.3 "Sourcing of parts in the product development process," new
suppliers must undergo a registration process in the first phase of the procurement process.
The first step in registering on the Group Business Platform is to complete the supplier self-
registration, which can be started by selecting the "Partner registration"/"Start registration"
buttons.
The data sent in the supplier self-registration step are checked for correctness by B2B
Support in the second step. If the information is correct, B2B Support approves the supplier
for the third and final step of the registration process.
To complete the registration, the supplier must now enter additional information into the
supplier database of the Volkswagen Group. Finally, the
B2B User Agreement must be accepted and a Company Administrator must be set up on the
platform.
The entire registration process is summarized in figure 20.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
25
© Volkswagen AG, 1446, Group Development Management
Figure 20: Registration process for the Group Business Platform (summary)
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
26
© Volkswagen AG, 1446, Group Development Management
More information on the registration process can be found on the login page of the Group
Business Platform:
Choose "Partner registration" and then "Start registration." A description of the registration
process is found in PDF format for downloading on the left side of the screen.
Note: The SSR form must be filled out as completely as possible. This is the only way to
ensure that Procurement will send RFQs to the potential supplier.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
27
© Volkswagen AG, 1446, Group Development Management
Figure 22: The "Online inquiries (ESL)" application on the Group Business Platform
Quotations are specific to the project and component. The supplier must ensure that all
aspects regarding the technology used, the manufacturing process, and the performance
specification requirements are taken into account in the quotation. This enables the
Procurement division of the Volkswagen Group to ensure that all quotations are comparable.
The supplier, on the other hand, can be sure that no important and potentially price-relevant
information on the respective component is missing.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
28
© Volkswagen AG, 1446, Group Development Management
Figure 23 shows the RFQ overview along with the various types of RFQs in the "ESL"
application.
RFQ type
Separate RFQs are issued for each component. These RFQs are also specific to the vehicle
and are divided into Global Sourcing RFQs and Forward Sourcing RFQs. More information
on the two procurement processes can be found in section 2.1.2 "Classification of
procurement processes." The two RFQ types can be differentiated in the RFQ list by the
abbreviation F for Forward Sourcing and G for Global Sourcing.
Contacts
Contact persons for each part are specified by the various departments involved in the
respective development project. These contacts are specified in each RFQ and must be
consulted if questions arise regarding the RFQ documents.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
29
© Volkswagen AG, 1446, Group Development Management
RFQ-related documents
Volkswagen brand
Volkswagen Group
Figure 24: Contact information of a selected RFQ package and content of the RFQ package that is relevant for
engineering
RFQ-related documents
From the viewpoint of product development, this package contains all the essential
information that must be taken into account in the quotation for the requested component.
Such a package typically contains the following:
Component Performance Specification (BT-LAH) with detailed information on the
respective engineering requirements (e.g., basic conditions regarding the
component and project, technology used, test requirements, and project
management guidelines)
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
30
© Volkswagen AG, 1446, Group Development Management
Reference drawing
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
31
© Volkswagen AG, 1446, Group Development Management
All development suppliers must ensure that they have the latest versions of the applicable
standards available to them for the project. This is particularly important during the
nomination process as this is the only way to ensure that the quotation contains all
requirements for the components and tests.
The latest versions of the corresponding standards can be downloaded directly from the
Group Business Platform in several languages.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
32
© Volkswagen AG, 1446, Group Development Management
The "Online Standards" application required to download these documents is available under
the "Tools" menu item in the "Information" section of the Group Business Platform. Clicking
on the following icon takes you directly to the application:
The following types of standards can be viewed and downloaded in the "Online Standards"
(ONNO) application:
Volkswagen Group standard – VW
Technical Supply Specification – TL
Test Specification – PV
Technical Guideline for Documentation – TLD
Design Guideline – KR
Quality Specification – QP
Standard Part Drawings – N/SDL.
The search method for finding standards in the "Online Standards" application is illustrated in
figure 28.
Standards and guidelines are published in various languages indicated by the corresponding
country flags. After the hit list appears, check for the latest version of the document.
The "Online Standards" application also contains the "Compositions" button, which can be
used to create a list of project-specific standards. This collection can then be downloaded
conveniently at regular intervals.
Note: If the "Online Standards" application is not being displayed on the Group Business
Platform, please contact B2B Support to request access. The B2B Support contact
information can be found in section 2.1.4 "Group Business Platform and registration
process."
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
33
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
34
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
35
© Volkswagen AG, 1446, Group Development Management
The supplier's share of the technical design is expressed by the design responsibility share
and depends on the scope of development requested from the supplier. The following
applies in general: the fewer the design specifications issued by the Volkswagen Group, the
higher the design responsibility agreement share. The design engineer who owns the part
defines the design responsibility share in the early design phase of a new part development.
This definition is found in the RFQ documents (see section 2.1.6 "Development-specific
information in the RFQ package").
As mentioned above, the arrangements of the design responsibility agreement apply to all
new parts, with the exception of the following:
Blanks
Standard parts
Production equipment
Process materials
Further information on the topic of design responsibility agreements can be found in the
"Information" section of the "Quality Assurance" division on the Group Business Platform
under the following link:
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
36
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
37
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
38
© Volkswagen AG, 1446, Group Development Management
Figure 31 shows the "Vehicle Projects" application on the Group Business Platform.
If you require access to certain projects as a nominated supplier, please contact B2B
Support. To be granted access rights, you will need to state the nominated part number and
the appropriate purchaser of the Volkswagen Group.
The B2B Support contact information is stored in the "Help" area of the Group Business
Platform.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
39
© Volkswagen AG, 1446, Group Development Management
The ePortal
• enables access to project data worldwide via the intranet, Internet, and contractor
network;
• offers a differentiated control of authentication routes to protect data according to the
confidentiality level;
Document library: Centralized access to all working files within your project with an
automated versioning system. You can sort your files in folders, as well as individually assign
them access permissions and keywords.
Blog and forum: The complete project team can be informed on current topics and/or
problems. You can use comments for topic-related discussion and exchange information.
Tags: Keywords on documents and reports simplify the search for content. To be informed of
changes, the user can subscribe to selected tags.
Engineering Portal
operational services GmbH & Co. KG Phone: +49 800 5877 877 (in Germany)
Service Support Center (SSC) Phone: +49 375 60619 904 (internationally)
Fax: +49 391 58 0130760
E-mail: csn.service@o-s.de
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
40
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
41
© Volkswagen AG, 1446, Group Development Management
2.2.1 Introduction
In the Volkswagen Group, vehicle developments are based in a standardized process
referred to as the Product Development Process (PDP). This process is divided into different
phases with corresponding milestones, although not all phases are of immediate relevance
for suppliers.
Preliminary selection and nomination by the Volkswagen Group forms the starting point for
suppliers in the PDP. Figure 33 shows the entire time span over which suppliers are involved
in the PDP.
Figure 33: PDP with milestones and phases that are relevant to suppliers
The PDP describes the phases and milestones of a vehicle project that must be used by
suppliers as the basis for defining component-specific milestones.
The supplier receives the deadlines for component-specific milestones together with the RFQ
package. These ensure the availability of all components for pre-production and for testing
and approval.
To ensure adherence to these deadlines, the supplier must create a component-specific
schedule on the basis of its own in-house PDP (see figure 34). This schedule must contain
the milestones of the vehicle project and the milestones that are specific to the supplier.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
42
© Volkswagen AG, 1446, Group Development Management
Figure 34: Correlation between the vehicle development process and the component supplier
When a milestone is reached, the supplier must submit specific work results, prototypes, or
samples close to production of a pre-defined quality. More information on prototypes and
sample quality at various points within the PDP schedule can be found in section 2.3.3
"Approvals within the development schedule."
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
43
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
44
© Volkswagen AG, 1446, Group Development Management
TBT
TBT VFF TBT PVS
0-series
VFF PVS 0S
Figure 35: Correlation between the stock-in-plant date and vehicle milestones
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
45
© Volkswagen AG, 1446, Group Development Management
Note: More information on sample grades can be found in section 2.3 "Approval
processes within the Product Development Process." Figure 39 shows an example
schedule highlighting the approvals within the PDP, including the required sample
grades for sample parts.
Milestone "Run at rate" – "2TP"
At this milestone, the production quality under future production conditions is verified
over a production period of 2 whole days. The run at rate usually takes place between
0-series and SOP to prevent capacity and quality problems. However, there are
reasonable exceptions where run at rate takes place after SOP. In this case,
however, a run at rate pre-check must be conducted to ensure production ramp-up
between 0-series and SOP. The approval of the run at rate is an important
prerequisite for issuing the production release of the product and process quality.
The goals of the run at rate are:
Verification of process and quality performance under production conditions
Verification of the capability to manufacture the required components in the
respective quantity with the resources available.
The run at rate is performed for components for which one or more of the following
conditions exist:
New parts
Capacity increase
Significant changes to the production process or tools
Relocation of production
The component requires verification of the suitability of the designated packaging
material, storage capabilities, containers, and means of transport with regard to quality
requirements.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
46
© Volkswagen AG, 1446, Group Development Management
Technical engineering approvals and initial-sample releases play a significant role in the
PDP. The issuance of a technical engineering approval or a release acts as the final
confirmation that the component meets the requirements described in the Component
Performance Specification.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
47
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
48
© Volkswagen AG, 1446, Group Development Management
1 b – Initial-sample release
Initial sample releases are issued by the Quality Assurance department in the production
ramp-up phase. A prerequisite for this release is an initial sample inspection, concluded with
positive results, in which material properties as well as dimensional properties of the
component are evaluated. In addition, the initial sample inspection includes a fitment trial
(installation in the vehicle).
The results of the initial sample inspection can be classified as follows:
Grade 1: Sample approved/released.
Full compliance with specification.
No re-sampling required
Technical engineering approval is a prerequisite for the issuance of the initial sample release
in the case of components subject to technical engineering approval. Figure 39 shows an
example schedule, including the TBT milestone with the required sample grade.
Further information on the initial sample release and sampling grades can be found in
section 2.8 "Materials-related processes and requirements."
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
49
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
50
© Volkswagen AG, 1446, Group Development Management
2 b – Self-certification
Likewise, the component manufacturer must perform tests to verify compliance with the law
for components that are subject to the so-called self-certification (incl. KC-certification for
South Korea; FMVSS 302 in the USA). These verifications must be made available to the
part-owning department.
The conformity of production requirements (CoP testing, cycles, documentation) must be
ensured.
Any changes that affect the certified properties (incl. relocations, relocations of individual
process steps, changes of name, technically relevant changes, etc.) must be reported to the
individual departments and presented for approval in due time. Such changes could lead to
the loss of the vehicle type approval.
2 c – Type approval
Type approval is part of the component type approval process. If components are subject to
type approval, the supplier must perform certain component tests in the presence of a
Technical Service & Authority. To determine whether or not a component is subject to type
approval and which requirements apply for such a type approval, please refer to the
underlying legal regulations/guidelines.
Technical Service & Authority will issue an expert opinion based on the successful type
approval and a technical information document completed by the supplier. This expert
opinion and the information document are the basis for obtaining a certificate from the
respective national authorities and therefore for the approval (component type approval
and/or certificate).
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
51
© Volkswagen AG, 1446, Group Development Management
Dev. Documentation
B-samples C-samples
Two-Day
Quality Assessment Part Production
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
52
© Volkswagen AG, 1446, Group Development Management
Note: Additional milestones and processes are mandatory for components and systems tied
to the electronic system and software. Particularly in the areas of testing and integration,
extended requirements and milestones are added to the process.
In addition to the general sample quality classification into sample inspection grades,
samples are also grouped into A, B, and C samples on the basis of their functional capability.
• Determination of basic
suitability in laboratory and
• Confirmation of suitability for
road tests
Objectives: • Confirmation of concept production
• Commissioning of tools for the
• Technical engineering approval
production of the individual
parts by Procurement
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
53
© Volkswagen AG, 1446, Group Development Management
2.4.1 Introduction
The supplier must ensure that its internal project management fulfills the requirements
specified in the above-mentioned documents. Proof of such fulfillment must be provided to
Volkswagen Group upon request (e.g., as part of a Development or process audit).
Note: The requirements in terms of reporting to the appropriate department in the framework
of the development phase (in general, until issuance of the technical engineering approval)
are also described in this section.
Note: The specific requirements for change management are described in section 2.6
"Change management."
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
54
© Volkswagen AG, 1446, Group Development Management
1. Project organization
The supplier must set up a project team whose roles and responsibilities must be
defined and depicted in a project-specific organization chart. In addition, a
responsibility plan must be created detailing the persons responsible within the
project and their respective work packages. Sub-contractors must also be specified in
this organization chart.
Furthermore, a contact list of all persons mentioned in the responsibility plan must be
created. Any changes to the organizational chart must be communicated to the
purchaser.
The supplier is responsible for a smooth organization of the project and must ensure
that work on the project begins immediately after being contracted. This also includes
preparing and conducting an internal kick-off meeting as well as a kick-off meeting
together with the appropriate Volkswagen Group department.
The agenda of the kick-off meeting includes a list the following items, at a minimum:
Project history and contractual situation
Project organization and project team
Planning of the project scope including the work breakdown structure
Project targets derived from the purchaser's goals
Project planning (including time, costs, and resources)
Project risk assessment
Definition of how to inform and report to the purchaser.
2. Management of packages
The supplier must create a detailed project package plan for the development and
realization of the component, taking into account the following:
Work breakdown structure – WBS. The WBS must correspond to the project
specification and must include all assignment areas and development phases.
These include:
o Project management
o Development
o Test
o Quality assurance
o Industrialization process
o Production
o Logistics.
The work packages must be of a manageable size. Material and personnel
resources must be assigned to the individual work packages
Work packages must be traceable in the form of regular project reports and must
contain criteria that define successful completion
Work packages must be assigned to PDP milestones. Dependencies between
work packages must be shown.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
55
© Volkswagen AG, 1446, Group Development Management
Project-specific work
breakdown structure
3. Project schedule
The supplier prepares a detailed Gantt chart of the project schedule as per the
defined project- and part-specific PDP milestones. The project schedule must also
contain the tasks, milestones, and dependencies of the Volkswagen Group.
The project schedule must include the following milestones contained in the RFQ
documents of the Volkswagen Group Procurement division:
3-D CAD data frame determined
A-sample available
B-sample available
C-sample available
Initial sample delivery and initial sample inspection report
Technical engineering approval
Run at rate
SOP.
The project schedule must contain at least the work packages listed in the work
breakdown structure including deadlines and responsibilities. Dependencies between
work packages as well as the critical path must be shown. Each version of the
project schedule must be provided in electronic format.
The supplier must ensure that:
1. Imminent deviations from the schedule are communicated in writing to the
appropriate department of the Volkswagen Group immediately and without further
request. At the same time, reasons for the deviation and suitable actions to be
taken to return to the original schedule must be stated
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
56
© Volkswagen AG, 1446, Group Development Management
2. The project schedule reflects the current project status at all times. The project
schedule is presented to the appropriate department of the Volkswagen Group
together with the monthly progress report
3. The commissioned project package is included both in the matrix (i.e., the
presentation of correlations between the processes) and in the schedule
4. Buffer times in addition to the critical path can be shown or provided on request
5. Individual schedules for different assignment areas (e.g., testing, quality,
logistics) can be provided on request.
4. Risk management
The supplier establishes a risk management process for the duration of the project to
ensure that risks are systematically identified and tracked. This risk management
process serves to meet the requirements as specified in section 2.2.2 "Risk
management" and section 5.3 "Preventive quality management methods and risk
protection" of the Volkswagen Group standard VW 99000.
The risk assessment must include all types of risks; in particular technical,
organizational, and commercial risks as well as risks brought about by sub-
contractors.
The supplier must analyze and prioritize the risks. The risk assessment must include
the impact of the risks on the project (particularly in regard to the technical solution),
on quality, and on the agreed schedule and costs. A root cause analysis must be
conducted for determined risks.
For technical risks, the supplier must ensure completeness as well as conformity with
the results of the product failure modes and effects analysis (FMEA) (for system and
design) and process FMEA. The supplier must take steps to prevent or minimize
detected risks and must document the steps.
In the event of changes to the component or to the process, the supplier evaluates
the situation in regard to new risks' probability of occurrence and forwards this
information to the appropriate Volkswagen Group department as part of the change
evaluation. The risk log must be updated as necessary.
The supplier proactively informs the Volkswagen Group about existing risks.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
57
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
58
© Volkswagen AG, 1446, Group Development Management
2.5.1 Introduction
The requirements for project management and reporting during the development phase
apply at all times as described in section 2.4 "Project management – basic requirements." In
addition, as an element of the supplier readiness management, reporting also focuses on
tool readiness and tracking of sample deadlines, sample versions, and sample quality for
production.
Suppliers of key components (also referred to as key packages or "heavy items") are
required to participate in the supplier readiness management process. Supplier selection is
based on the following criteria:
New supplier for the Volkswagen Group
Supplier is operating a new manufacturing plant ("greenfield")
Long lead time for tool manufacturing
New technology and new manufacturing process for the Volkswagen Group
Negative experiences in past projects
Negative audit rating.
Note: The operative responsibility for key components lies with the SRM team. Project
Purchasing assumes commercial responsibility starting from supplier nomination until
3 months after SOP. Commercial responsibility shifts to Line Purchasing following SOP.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
59
© Volkswagen AG, 1446, Group Development Management
Troubleshooting
Prevention
Project
Project duration
timeline
DF BF LF PVS 0S SOP
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
60
© Volkswagen AG, 1446, Group Development Management
The Volkswagen Group SRM team is responsible for planning, implementing, and carrying
out SRM processes through which it can obtain a current overview of the readiness of
samples, tools, and equipment. The organizational structure of the SRM team is shown in
figure 44.
Supplier Readiness
Management
Commodity Commodity
Commodity Commodity Commodity Schedule
Electric/ Powertrain/
Exterieur Interieur Metal Control
Electronic Chassis
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
61
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
62
© Volkswagen AG, 1446, Group Development Management
Figure 46 gives an overview of the services to be rendered by suppliers at each SRM gate in
the Global or Forward Sourcing projects.
Figure 46: SRM gates and respective services to be rendered as part of Forward and Global Sourcing projects
Note: Beginning with gate 5, component qualification for grades 3 and 1 proceeds in close
cooperation with the Purchase Parts Quality Assurance department of the appropriate plant.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
63
© Volkswagen AG, 1446, Group Development Management
VW411
VehicleNMS
project VW411
VehicleNMS
project Commitment
Co
561.945XXX
561.945XXX 561.945.XXX
Part number: Supplier: XXX Date:
561.945.XXX 561.945.XXX
Part number: 561.945.XXXSupplier: XXX Date:
561.945.XXX
Part name: Tail Lights DUNS: 151928512 31-Jul-09
561.945.XXX
Part name: Tail Lights DUNS: 151928512
Due date for vehicle assembly Due date for part delivery Status Grade
Vehicle schedule Fahrzeugmontagetermine Teilebereitstellung TBT Status Note Overall status
ZP 7 Date Week Year Date Week Year 1 3 6
Prototype TBT: VFF: XX.XX.XXXX X #VALUE! XX.XX.XXXX X #VALUE! ###
CW29 / 2009 PVS: XX.XX.XXXX X #VALUE! XX.XX.XXXX X #VALUE! ####
VW Group Contact Person #VALUE!
0S: XX.XX.XXXX X #VALUE! XX.XX.XXXX X #VALUE! ####
SOP: XX.XX.XXXX X #VALUE! XX.XX.XXXX X #VALUE! ####
Role/Function Surname First name Department Telephone Mobile Email Loc
Due Dates: Commitment Actual
Supplier Readiness X X Purchasing +1-423-755--XXXX
Date Week
+1-423-755--XXXX
Year Date Week Year
XX.XXX@XX.comRemarks
Chattanooga,
Part Design
Buyer X X
Determination of supplier
Purchasing +1-423-755--XXXX
XX.XX.XXX #VALUE!
+1-423-755--XXXX
#VALUE! XX.XX.XXX #VALUE!
XX.XXX@XX.com Chattanooga,
#VALUE!
Delivery prototypes at acceptors end XX.XX.XXX #VALUE! #VALUE!
Logistics X X
Surface Data
Logistics +1-423-755--XXXX
XX.XX.XXX #VALUE!
+1-423-755--XXXX
#VALUE!
XX.XXX@XX.com Wolfsburg, Ge
P (Planning)-Release XX.XX.XXX #VALUE! #VALUE!
Logistics X X
Color-Combination board
Logistics +1-423-755--XXXX
XX.XX.XXX #VALUE!
+1-423-755--XXXX
#VALUE!
XX.XXX@XX.com Wolfsburg, Ge
Determination of tool maker XX.XX.XXX #VALUE! #VALUE! NMS: VW411
Quality Assurance X X Quality
Manufacturability (Simulation / Mold flow
+1-423-755--XXXX
XX.XX.XXX #VALUE!
+1-423-755--XXXX
#VALUE!
XX.XXX@XX.com Chattanooga,
561.945.093
D-FMEA (Design) XX.XX.XXX #VALUE! #VALUE! Part number: Supplier: II Stanle
Design/Engineering X X
P-FMEA (Process)
R&D +1-423-755--XXXX
XX.XX.XXX #VALUE!
+1-423-755--XXXX
#VALUE!
XX.XXX@XX.com Wolfsburg, Ge 561.945.094
SET Speaker X X R&D +1-423-755--XXXX +1-423-755--XXXX XX.XXX@XX.com Wolfsburg, Ge VW411 NMS Tool maker
Final Quality Check
Injection Molding
Assembly
Stamping
Lead time for tool design 4 Component Component Person Responsible for Name
Bezel 1 Address
S1 Contact Person
Supplier Contact Person Denomination Part Number Tool Tracking (Supplier)
Sub-Supplier
Toolmaker Toolmaker
S1 Toolmaker
Tool design end 12.11.2009 46 2009 Bezel 2
Covering Pane KC Barlond Inner Lens 1 North America S1 S1 S1
Steel purchasing start 06.11.2009 45 2009
Role Surname First name Department Telephone Mobile Email Loc Covering Pane-Hard Coat KC Barlond
Inner Lens 2
North America
S1
Tool fabrication start 13.11.2009 46 2009 Inner Lens (R/F) S2
Lead time for tool fabrication 18 Housing KC Barlond North America
Management Representative X X
Tool fabrication end
GM +1-269-660-XXX
19.03.2010 12
+1-269-660-XXX
2010
XX.XXX@XX.com Battle Creek, Dummy RR S2
100% Tooling, production equipment 08.03.2010 11 2010 Reflector-Low/High Beam Gasket Seal S2
Project Manager X X
100% Testing equipment
Design +1-269-660-XXXX
08.03.2010 11
+1-269-660-XXXX
2010
XX.XXX@XX.com Battle Creek, Aluminization
KC Barlond
Weld Bolt
North America
S2
Reflector-Turn Signal KC Barlond Contact Plate North America
& Bulbs S2
100% Software-Function 08.03.2010 11 2010
Sales X X Sales
Delivery B-Samples (electronics)
+1-269-660-XXXX +1-269-660-XXXX XX.XXX@XX.com Battle Creek, Reflector-Turn Signal
KC Barlond
Contact Plate/Bulb Holder
North America
S2
Aluminization
W16W Bulb S2
Lead time for running-in and assembly 3 Trim Cover Element 1 KC Barlond North America
Logistics X X Shipping
1st Parts at suppliers end
+1-269-660-XXXX
09.04.2010 15
+1-269-660-XXXX
2010
XX.XXX@XX.com Battle Creek, P21W Bulb S2
1 2 3 4 5 6
S1 S2 S3 S4 S5
R&D X X Design +1-269-660-XXX +1-269-660-XXX XX.XXX@XX.com Battle Creek,
Optimisation/ QA
A detailed view of the commitment documentation can be found in part 3 of this guide.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
64
© Volkswagen AG, 1446, Group Development Management
2.6.1 Introduction
In this guide, the term "change" refers to any modifications to a component that present a
deviation of the planned component version from the current design version and/or
component version. The change management only captures engineering changes that can
be documented by way of the bill of materials (e.g., a new release status, a changed drawing
version, or a different primary properties (PR) code assignment). Changes can be initiated
either by a Volkswagen Group division (e.g., Development, Quality Assurance, Production)
or by the supplier. This guide focuses on changes initiated by the supplier.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
65
© Volkswagen AG, 1446, Group Development Management
* In this Supplier Guide, only component changes are discussed. Not considered are
software and/or hardware updates (versioning) to which specific processes apply. For
information about these processes, please contact the department with design responsibility.
Furthermore, deviation permits (AE) are used to document and control the temporary
installation of components deviating from the released design version (see section 2.6.4).
In addition, model updates are used in production, typically for changes to product contents.
Model updates can be necessary as early as of SOP. In the implementation phase, the
AEKO and AE tools are used as necessary. Starting with the SOP of the model update item,
a model update becomes subject to ECRs.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
66
© Volkswagen AG, 1446, Group Development Management
Figure 49 shows the entire change process, beginning with the change control and
evaluation to the final approval and implementation of the change.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
67
© Volkswagen AG, 1446, Group Development Management
The supplier must inform its contacts in the Development and Procurement
departments about any effects the changes may have on the project. The
supplier must officially evaluate the AEKO/ECR within 10 workdays after
notification of changes. This is done in writing using the form for change controls
shown in figure 50.
Note: If, in individual cases, the 10-day rule cannot be adhered to, this must be
indicated to the Volkswagen Group within 5 workdays and a binding deadline
must be specified.
The supplier's official evaluation must take into account the following items:
o Impact on the component
Technical solution
Weight
Quality assurance
Component costs
o Impact on the tool and the production process
Technology
Tool costs
Cycle time
Packaging
o Impact on the project
Schedule and milestones
Project risks
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
68
© Volkswagen AG, 1446, Group Development Management
The supplier must inform the Volkswagen Group of these items in writing. If the
supplier does not do this, it may not be entitled to a higher remuneration or
deadline extension.
Phase 2 – Evaluation and approval by the departments
The changes must be documented in the engineering drawing. They are the
basis for the evaluation.
All affected departments perform an internal evaluation of the AEKO/ECR using
the evaluation process in the AVON system. This evaluation is division-specific
and takes into account all items mentioned in the official evaluation of the
supplier in the AEKO/ECR form.
Figure 52 shows how a change is referenced by means of the change number.
Phase 3 – Final approval
Issuance of the approval is based on the overall assessment of the impact of the
change on the vehicle (e.g., whole vehicle quality and costs).
Phase 4 –Commissioning of the change by Procurement
The supplier receives a letter from the Volkswagen Group Procurement
department that informs it about the internal approval of the change
This approval letter also contains the Group-specific change number. Within
Volkswagen, this number is referred to as the AEKO or ECR number. Figure 51
shows an example of such an approval letter.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
69
© Volkswagen AG, 1446, Group Development Management
The supplier must implement the change within the timeframe indicated in the
change control form and in the quality specified therein.
The supplier must update all relevant technical documentation (e.g., drawings,
numerical simulations, product FMEA, process FMEA).
The supplier is responsible for updating and maintaining a revision record for
these documents.
The supplier must ensure that all affected persons and organizations are
informed of revisions to the technical documentation (this also applies to sub-
contractors).
The changes must be sampled during quality assurance.
The exact start date must without exception be agreed upon with the responsible
Logistics department.
Drawing
Revision record
Change number
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
70
© Volkswagen AG, 1446, Group Development Management
2.7.1 Introduction
This section includes regulations for prototype parts and describes, in addition, the
requirements for such components as well as their handling. In addition to a short
introduction into the topic and information on the source of the latest version of the "Supplier
manual for prototype parts," it contains references to sections of the prototype manual that
are of particular importance for the successful cooperation with the Volkswagen Group
departments in the course of the prototype assembly phase.
The Supplier Manual for Prototypes applies only to deliveries of prototype packages. In
particular, these are:
Prototype parts
Prototype modules and assemblies
Models
Production equipment (tools, fixtures, gages, etc.)
Equipment.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
71
© Volkswagen AG, 1446, Group Development Management
The supplier manual for prototype parts has a modular structure and is divided into parts A,
B, C, and D. Of each of these parts, at least ONE part must be applied:
Figure 54: Modular structure of the Supplier Manual for Prototype Parts
Model phase 1 (A-sample) are "handmade prototype samples" that are produced with a
high degree of manual effort.
A prototype part is a sample part that is required before production parts are available to
build prototypes.
Prototype parts are required to determine their basic suitability for production in laboratory
and road tests.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
72
© Volkswagen AG, 1446, Group Development Management
The goal is to manufacture testable prototype scopes under conditions similar to production
and using production equipment that is close to production. The specifications in the RFQ
documents regarding the function, dimensional stability, documentation, and quality must be
adhered to.
The focus is on the manufacturing method and component material. This may result in
synergy effects by which the experience gained during this process is useful in the assembly
of production tools.
Deviations from this procedure must be explicitly agreed upon with the contacts of the
Volkswagen Group companies and must be documented.
The Pre-Production Center requires prototype parts that, as a rule, are manufactured using
prototype tools with P-release status.
In model phase 3 (C-sample), the components always come from unlinked production tools
(less automation) with B-release status.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
73
© Volkswagen AG, 1446, Group Development Management
All parts must be delivered with quality status Q4. In the event of deviations from the required
quality status, the appropriate contact must be informed immediately. The contact then
decides about further use of the component and the allocation of an adapted queue status.
More information on the quality status can be found in the Supplier Manual for Prototypes,
part B ("General Q part").
Delivery note
The companies of the Volkswagen Group use logistical hardware and software to ensure the
availability of the delivered prototype production parts. Smooth management to deliver the
right parts at the right time to the right location requires that the supplier also provides the
necessary information on its parts through electronic data interchange (e.g., eLisa at
Volkswagen) and on the delivery note.
Three identical copies of the delivery note must be enclosed with the package. Two of them
must be fixed to the outside of the packaging in envelopes in such a way that they cannot be
lost. One must be enclosed with the delivery. In addition, a copy must be sent to the contact
person (see 1.5) via e-mail on the shipping date (not required for electronic data interchange,
e.g., eLisa at Volkswagen).
Only one order may be listed on each delivery note.
Information must be provided on the exact parts, hardware version, and software version in
each delivery. If the order consists of several deliveries, the delivered quantity must be stated
in relation to the ordered quantity (e.g., 10 of 30). One invoice must be issued for each
delivery.
In addition to generally-used information (e.g., sender, supplier code, shipping date, delivery
note number, etc.), the delivery note must always contain the following basic data for correct
delivery assignment:
Clear delivery address with warehouse and contact person (name, department,
phone number)
Order number
Part number
Contract number
Part designation
Drawing version, design version, and date of revision
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
74
© Volkswagen AG, 1446, Group Development Management
If the purchaser changes the order at short notice and this causes the delivery to be modified
compared to the original order without this change being documented in writing, this must be
noted in the electronic data interchange and on the delivery note.
If basic data is missing, the Volkswagen Group companies reserve the right to charge the
supplier for the costs incurred due to research, testing efforts, and other activities resulting
from the omission.
Delivery note templates can be found in the brand-specific section. If the necessary details
are not available before the part is shipped, these must be requested from the appropriate
contact.
The delivery of the parts must always be documented with a delivery note.
Marking of parts
The Marking of parts is governed by the Volkswagen Group standard VW 01067 "Use of
Vehicle ID for Unambiguous Object Marking."
A complete, filled-out parts tag/label must be attached to all prototype parts for identification
purposes and for clear assignment to the delivery batches. If direct marking on the part is not
possible, a separate agreement on the delivery and marking conditions must be made with
the appropriate contact person (see Supply Manual for Prototypes, general part (A),
section 1.5) and documented. For small parts, the marking must be affixed to the packaging.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
75
© Volkswagen AG, 1446, Group Development Management
Test report
The test parts must be marked as per Volkswagen standard VW 01067 so they can be
correlated with a test report. In addition, all agreements that contradict the order
specifications must be documented concisely in the test report, along with the name of the
contact (see the Supplier Manual for Prototypes, general part (A), section 1.5).
A laboratory report must be added in agreement with the contact (see the Supplier Manual
for Prototypes, general part (A), section 1.5). The prototype parts supplier must store all test
reports. The associated test report number must be entered on the delivery note for this
purpose.
The test report consists of:
Test report cover sheet
Test report attachments, if any
Measurement report
Overview of individual parts of the ASSY
All data and test results, such as:
o ASSY weight/individual parts weight
o Details on the measuring equipment, measuring fixture, and orientation type
o Agreements on production deviations from the current CAD dataset or from
drawings
o Measurement results from a target/actual value comparison, tolerance,
deviation
o Materials test results
o Evaluation of the weld spot test (ASSY)
o Visual inspection result
o Indication of the dimensional stability index and quality status
o Hardware and software versions for electronic parts must be documented in
the associated test report.
The templates for creating the delivery note, parts tag, and test report cover sheet are
available on the Group Business Platform and can be viewed by clicking the following
symbol:
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
76
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
77
© Volkswagen AG, 1446, Group Development Management
Figure 56: Supplier Manual for Prototypes on the Group Business Platform
Note: The latest version of the Supply Manual for Prototypes is contained in the RFQ
package.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
78
© Volkswagen AG, 1446, Group Development Management
2.8.1 Introduction
Activities with regard to materials play a role in each phase of vehicle development, as
shown in figure 57.
Research Pre-development Product emergence Series
process production
Volkswagen Materials Laboratories
Development and selection of materials and operating fluids, materials testing for
build sample approval, initial sample inspection, fault analyses
Volkswagen Research
New materials, studies
Volkswagen Production
Material-suitable production technology, process technology,
reliable production processes
Suppliers
Raw material selection, material-suitable design, production, quality assurance
Research institutes/
laboratories Competitors/VDA
Fundamentals, analyses Joint projects
The pre-development phase of a vehicle is the starting point for various processes related to
materials in which the materials laboratory, Development, and the supplier are involved from
an early stage.
Suppliers are encouraged to foster an intensive collaboration with the Development divisions
and materials laboratories of the Volkswagen Group. This will ensure a materials-suitable
design that will meet quality, cost, and production process targets.
Suppliers need to know that their materials-related design, raw material selection, parts
production, and quality assurance have a major impact on a positive outcome of the initial
sample release and technical engineering approval processes.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
79
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
80
© Volkswagen AG, 1446, Group Development Management
The following subject areas are points of contact between the supplier and materials
laboratory:
1. Materials specifications and regulations
2. Materials specifications in drawings
3. Initial sample inspection.
These topics will be discussed in greater detail on the following pages.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
81
© Volkswagen AG, 1446, Group Development Management
International standards
ISO
In-house standards
e.g., VW, TL, PV
Drawing entries
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
82
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
83
© Volkswagen AG, 1446, Group Development Management
The main in-house standards are the Volkswagen standards (VW), Technical Supply
Specifications (TL), and Test Specifications (PV).
Volkswagen standards – VW
describe circumstances and requirements that
must be fulfilled by suppliers, products, or
materials (e.g., guidelines for marking of parts or
development requirements)
Test Specifications – PV
describe how tests on parts are conducted. The
tests may be used for different parts and may
therefore be referred to in different TLs (e.g.,
environmental cycle test).
Note: More detailed information on access to Volkswagen in-house standards can be found
in section 2.1.7 "Volkswagen Group standards database."
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
84
© Volkswagen AG, 1446, Group Development Management
Material
treatment
Semi-finished
product standard
Sheet metal
thickness
Surface
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
85
© Volkswagen AG, 1446, Group Development Management
The material selection influences both the quality and the properties of the final product.
Therefore, the selected materials must be clearly described in the drawing (see figures 61
and 62).
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
86
© Volkswagen AG, 1446, Group Development Management
The "Online Sampling (BeOn)" online application is available to suppliers for submission of
the materials test reports in the correct format. The application can be accessed by clicking
on the following icon:
Figure 63 shows how to access the "Online Sampling (BeOn)" application and the
corresponding guidelines.
Note 1: Material data sheets must be created in the IMDS (International Material Data
System) at www.mdsystem.com and sent to the appropriate Volkswagen IMDS-ID.
Note 2: If the "Online Sampling (BeOn)" application is not displayed on the Group Business
Platform, please contact B2B Support to request access. Contact details can be found in
section 2.1.4 "Group Business Platform and registration process."
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
87
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
88
© Volkswagen AG, 1446, Group Development Management
2.9.1 Introduction
The exchange of CAx data between the Volkswagen Group and its external partners within
the PDP is subject to explicit regulations. These requirements are documented in the manual
"Framework Conditions for Volkswagen Group Partners in the Product Emergence Process –
CAx Data Exchange with the Volkswagen Group," which can be downloaded from the menu
item "Divisions" "Research and Development" "R&D Services" in the "Information" area
of the Group Business Platform or by clicking on the following icon.
Note: This section offers only a brief summary of the different requirements. Current
information can be accessed on the Group Business Platform.
The responsibilities and the general principles for the exchange of CAx data must be
specified in the contract governing development and design work between Volkswagen and
its partners. The contact regarding this topic is always the department with design
responsibility.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
89
© Volkswagen AG, 1446, Group Development Management
This manual includes, among other things, guidelines for using the basic standards. An
excerpt of the basic standards currently in effect for CAx data exchange is displayed below.
VW 01050 Engineering Drawings; Scales, Lines, Hatching, Break Lines
Representation of objects in engineering drawings and other technical
documentation
VW 01052 Engineering Drawings; Representations
Representation of objects in engineering drawings and other technical
documentation
VW 01054 Engineering Drawings; Dimensioning
Dimensioning in engineering drawings; corresponds closely to international
drawing regulations and has been expanded to incorporate particular
Volkswagen Group requirements
VW 01055 Reference Point System, RPS;
Dimensioning/manufacturing/checking of individual parts or assemblies for clear
positioning and ensuring the same dimensional references
VW 01057 Statistical Tolerance Simulation of Continued Dimensions
Applies to any interconnected, measurable production characteristics or variables
VW 01058 Engineering Drawings; Lettering
Lettering design of objects in engineering drawings and other technical
documentation
VW 01059 (and supplements) Requirements for CAx Data
Standard for the creation of CAx data using CATIA V5 and Creo.
The CAx data to be provided by the supplier must be reproducible and
processable in the CAx systems of the Volkswagen Group process chains.
Adherence to the design guidelines ensures reliable CAx process chains,
supports the Digital Mock-Up (DMU), improves internal and external data
exchange, and forms the basis for CAx working methods (e.g., drawing creation,
3-D body design) as well as for automatic post-processing of data (plotting, layer
transfer, data conversion, data management).
All Volkswagen Group suppliers are strongly encouraged to obtain the standards listed
above via the "Online Standards" download application and to follow the instructions
contained therein. More detailed information on how to access the "Online Standards" can be
found in section 2.1.7 "Volkswagen Group standards database" of this guide.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
90
© Volkswagen AG, 1446, Group Development Management
In addition, contact persons for further questions relating to CATIA V5 are listed on the
platform.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
91
© Volkswagen AG, 1446, Group Development Management
The "Creo" area contains information and installable configuration files for the Group-specific
Creo environment. These files can be accessed on the Group Business Platform by clicking
on the following icon:
In addition, contact persons for further Creo-related questions are also listed.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
92
© Volkswagen AG, 1446, Group Development Management
For development projects that require a frequent exchange of CAx data, the Development
divisions require the use of the synchronous applications "HyperKVS" or CONNECT.
The engineering data management system (HyperKVS) is a document hub and archive
for the worldwide exchange of all engineering data and associated descriptive documents
that are accumulated in the various process chains of the Volkswagen Group.
This includes CAx documents, as well as documents that were created by hand and made
available to a management system at a later point in time, e.g., scanned drawings.
HyperKVS has the following main features for the administration of design data:
Research/provision of information
Data storage (archive) with version handling
Data exchange with internal and external partners (CAD workstation + PC)
Provision of data (issuing access rights)
Connection to PLOSSYS (plotting drawings) and RVS.
The interaction between the HyperKVS system, the Volkswagen Group, and external
partners is shown in figure 66.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
93
© Volkswagen AG, 1446, Group Development Management
Figure 66: HyperKVS – the engineering data management system of the Volkswagen Group
The data connection via HyperKVS, OFTP, and SimplX is provided by the operational
services GmbH & Co. KG.
Detailed and up-to-date information on connecting to the CSN (CAx Supplier Network) for the
purpose of data exchange can be found in the "Research and Development" section on the
Group Business Platform under the following link:
The SimplX and OFTP2 applications are available for the asynchronous data exchange.
These applications are a cost-effective alternative for secondary development projects of low
complexity.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
94
© Volkswagen AG, 1446, Group Development Management
For single or infrequent data exchange with low data For frequent data exchange
For permanent data exchange with high data volume
volume with high data volume
Art of collaboration ASYNCHRONOUS ASYNCHRONOUS SYNCHRONOUS
Application S L
Allowed data type confidential data only confidential and secret data
Time for installation approx. 1 months approx. 3 months max. 6 month max. 6 month max. 6 month
Setup fee - - 195 € (not appl. at premium) 195 € (not appl. at premium) 195 € (not appl. at premium)
50€ / 77€ / 195 € per month 50€ / 77€ / 195 € per month 50€ / 77€ / 195 € per month
CSN-Basis-fee - -
(basis / standard / premium) (basis / standard / premium) (basis / standard / premium)
Fee of CSN Appl.-
- - - 254 € per month 275 € per month
Service
Costs of security
- Additional costs arise, depending on data classification and associated necessary evaluation Method.
audit
Figure 68: Possibilities for data exchange with the Volkswagen Group, as of 2017-05
Note: If you have questions on the costs of procurement, setup, operation, and support of the
required hardware and software, please also contact operational services GmbH & Co. KG.
This also pertains to participation in training courses on systems such as HyperKVS and
CONNECT.
To be able to access Volkswagen Group applications, it is necessary to fill out the non-
disclosure agreement (see also section 2.1.3 "Sourcing of parts in the product development
process."
SSC Service Support Center
operational services GmbH & Co.KG
Phone: +49 800 5 877 877 (in Germany)
Phone: +49 375 60619 904 (internationally)
E-mail: csn.service@o-s.de
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
95
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
96
© Volkswagen AG, 1446, Group Development Management
CATIA V5
CATIA V5 models are checked with the help of the VALIDAT check application when data is
stored in the HyperKVS system. The respective model then receives the check status of
"OK" or "not OK." The test report is filed as a derived document. Only CATIA V5 data with
the "OK" check status can be stored in HyperKVS.
More information on the data quality of CATIA V5 files can be found on the Group Business
Platform under the following link:
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
97
© Volkswagen AG, 1446, Group Development Management
Creo
Creo models are checked with the help of the ModelCheck check application from PTC when
data is stored in the HyperKVS system. The respective model then receives the check status
of "OK" or "not OK." The test report is filed as a derived document. Only Creo data with the
"OK" check status can be stored in HyperKVS.
More information on the data quality of Creo files can be found on the Group Business
Platform under the following link:
For any further questions regarding CAx, VALIDAT, and ModelCheck, please contact:
SSC Service Support Center
operational services GmbH & Co.KG
Phone: +49 800 5 877 877 (in Germany)
Phone: +49 375 60619 904 (internationally)
E-mail: csn.service@o-s.de
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
98
© Volkswagen AG, 1446, Group Development Management
One of the fundamental objectives is the consistent management and provision of complex
data and information, which are processed or updated as new products are developed or
existing products are designed. In order to maintain control of the information flow along the
process chain, CONNECT will be used Group-wide as the central development platform for
all parties involved in the Volkswagen Group PDP. CONNECT is based on a central
development product structure that all process partners can access and in which geometry
and structure data as well as bill of materials information are managed.
CONNECT is the central product data management system for the entire Group, with
interfaces to TI-Syncro, CATIA, HyperKVS, and other systems.
Geometry
Figure 67: CONNECT – the product data management system of the Volkswagen Group
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
99
© Volkswagen AG, 1446, Group Development Management
All external partners of the Volkswagen Group will be linked to CONNECT step by step and
in a reliable process. Whether a contractor receives a synchronous or asynchronous link to
CONNECT depends on the data volume and technical infrastructure, and will thus be
decided on a case-by-case basis.
Suppliers with appropriate authorization can find more information on CONNECT, as well as
the newest developments in regard to its introduction, on the Group Business Platform or
under the following link:
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
100
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
101
© Volkswagen AG, 1446, Group Development Management
Note: The supplier's management must personally take note of the requirements described in
the "Formula Q" publication series.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
102
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
103
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
104
© Volkswagen AG, 1446, Group Development Management
The following is an overview of all documents and guidelines that must be given priority.
Formula Q – Concrete contains contractual specifications of the Volkswagen
Group companies for ensuring the quality of parts and processes in the
procurement and supply chain. For a successful collaboration between the
Volkswagen Group and its suppliers, the requirements described in this
agreement must be reliably fulfilled while maintaining open communication as
well as discipline in regards to costs and schedule.
Formula Q – New Parts Integral describes the qualification program for new
parts (see section 2.10.2). The qualification program for new parts serves as a
Group-wide guideline with a standardized course of action. This helps simplify the
collaboration with the suppliers.
Formula Q – Capability is the contractually binding guideline for assessing the
quality capability of suppliers to the Volkswagen Group (tier 1 suppliers) and their
supply chain (tier n suppliers). Formula Q – Capability is binding for direct
suppliers of components and materials that remain in the vehicle and for their
sub-contractors.
Formula Q – Capability Software is a supplement to Formula Q – Capability
with process descriptions to evaluate the quality capability of suppliers of
software-related vehicle components. The basis for this document is Automotive
SPICE®, a standard derived from ISO/IEC 15504 especially for the automotive
industry.
Quality documentation for the pre-production phase is part of the Formula Q
– New Parts Integral content. The form stored here is used as quality
documentation during the pre-production phase and supports the sample
inspection.
Note: In addition to the generally applicable documents of the Formula Q publication series,
the special guidelines and QA documents of the individual Volkswagen Group brands and
places of manufacture apply. These documents supplement the requirements for suppliers of
purchase parts from the perspective of the Quality Assurance departments of the individual
brands and manufacture locations. They are part of the RFQ. They include, for example,
documents such as the Quality Performance Specifications of the Audi, Bentley, and Škoda
brands.
All documents prioritized by the Group brands can be found in the Quality Assurance section
of the Group Business Platform, under the "Brand Specific Information" menu item.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
105
© Volkswagen AG, 1446, Group Development Management
Part 3
–
Appendices
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
106
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
107
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
108
© Volkswagen AG, 1446, Group Development Management
Laboratory Information and Management Application with which laboratory orders for
LIMS
System sample tests can be issued online.
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
109
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
110
© Volkswagen AG, 1446, Group Development Management
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
111
© Volkswagen AG, 1446, Group Development Management
3.2 Forms
Form for change control – available in electronic form from the Volkswagen
Procurement department
Total amount
cost/pc
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
112
© Volkswagen AG, 1446, Group Development Management
21.07.2009
Date Supplier Purchasing VW R&D VW Logistics VW Quality Assurance VW
01.03.2010
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
Department
Phone
Commitment documentation – available in electronic form from the SRM team at
Email
Volkswagen ("Master schedule" shown below; entire document comprises seven pages)
113
Supplier Guide for Product Development
Figure 73: Source of Supplier Guide for Product Development on the Group Business Platform
The web page shown in figure 73 can be accessed directly by clicking on the following icon:
Note: This guide is also part of the documentation in the RFQ package (see also
section 2.1.6 "Engineering-specific information in the RFQ package").
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
114
© Volkswagen AG, 1446, Group Development Management
Corporate details
Version: 4
Date: September 4, 2017
The English translation is believed to be accurate. In case of discrepancies, the German version controls.
115
© Volkswagen AG, 1446, Group Development Management