Sunteți pe pagina 1din 4

WIND PROJECT DETAILS: MR.

SHEIK ABDULLAH

Please provide 6 to 10 Wind Project details for our reference.

Project Name: 16MW Wind Energy Project at Puerto GALERO, Mindoro (Philippines)
Year of Execution: Jan 18 to Jul 18

Client: Philippines Hybrid Energy system INC


Main Project Features:

 Planning of 16MW Production


 It is located in separate island
 CTB (Cement Treat Based) Road work
Activities performed:
 Ensure implementation of all foundation works, road, crane platform as per approved QAP and project
schedule
 Preparing Daily Works Progress Reports and Weekly Project Status reports.
 Quality Inspection & Supervision.
 WTG foundation casting
Project Name: DHAR 100MW Wind power project - (MADHYA PRADESH)
Year of Execution: Mar-2017

Client: Hero
Main Project Features:

 100mw at one compound area


 2.0mw turbine WTG from GAMESA
 Commissioned at shortest period
Activities performed:
 Soil test in every location using SPT method.
 Soil strengthening for foundations based on SBC value.
 Checking the Soil strengthening using the method of plate load test, FDD test.
 Installation of concrete plant

Project Name: CLP (China Light Power) 60 MW Wind power project -(MAHARASTRA)
Year of Execution: Mar-2015

Client: CLP (China Light Power)


Main Project Features:

 EPC contract done


 60 MW Commissioned from 2015 to 2016
Activities performed:
 Design mix concrete for M25 ,M40,M50,M55
 Slump test for fresh concrete.
 Compression strength for concrete cubes in 7th,21st,28th day.

Project Name: JATH 125 MW Wind power project -(MAHARASTRA)


Year of Execution: from Mar 2011 to Mar 2014
Client: RENEW,INDORAMA,ENERGON
Main Project Features:

 WTG capacity 850KW,2.0MW


 Concrete grade are M35 and M45
Activities performed:
 Soil test in every location using SPT method.
 Soil strengthening for foundations based on SBC value
 Concrete QTY are 380 CU.M

Project Name: UDM & DPM 100MW Wind power project – (TAMIL NADU)
Year of Execution: Jan 2010 to Mar 2012

Client: SSM, Premier


Main Project Features:

 WTG capacity 850KW,2.0MW


 Concrete grade are M35 and M45
Activities performed:
 Mass Concrete inspection (350Cu.meters)
 Reinforcement Inspection (45 M.T/Location(Approx.))
 Safety Inspection During the Progress.
 Safety Toolbox conduct meeting in daily basis
 Weekly meeting conduct on every week about safety concern
 PPE’S Verification in site.

Project Name: UDUMALPET 100 MW Wind power project -(TAMIL NADU)


Year of Execution: Mar 2008 to Mar 2010

Client: SSM
Main Project Features:

 WTG capacity 750 kw and 1.65 kw


 VESTAS wind turbine
Activities performed:
 Mass Concrete inspection (350Cu.meters)
 Reinforcement Inspection (45 M.T/Location(Approx.))
 Safety Inspection During the Progress.
 Safety Toolbox conduct meeting in daily basis

Project Name: UDUMALPET 50 MW Wind power project - (TAMIL NADU)


Year of Execution: June 2005 to Mar 2008

Client: PREMIER
Main Project Features:

 WTG capacity 750 kw and 1.65 kw


 VESTAS wind turbine
Activities performed:
 Soil test in every location using SPT method.
 Soil strengthening for foundations based on SBC value.
 Checking the Soil strengthening using the method of FDD test.
 Calibration of concrete plant, compression testing machine
 CA, FA aggregates testing.
 Sieve analysis, Silt content, Crushing strength, Impact test.
 Design mix concrete for M20 ,M35,M45.
 Trial mix for M20,M35, M45.
 Mill certificate verification for steels.
 Water analysis for concrete
 Mill certificate verification for cement, admixture, water.
 Slump test for fresh concrete.
 Compression strength for concrete cubes in 7th,21st,28th day.
 Locations coordinates checking
 Crane platform 40m x 40m making.

Project Name:
Year of Execution:

Client:
Main Project Features:




Activities performed:

Project Name:
Year of Execution:

Client:
Main Project Features:




Activities performed:

Project Name:
Year of Execution:

Client:
Main Project Features:




Activities performed:

S-ar putea să vă placă și