Contamination Control

Nickel Rim South Mine 5-Star Contamination Control Journey

Tim Hinds
Agenda

• GlencoreXstrata
• Sudbury Integrated Nickel Operations
• Nickel Rim South Mine
• Embracing Change
– Through Engagement, Best Practices and
Technology advancement
• Delivering Business Results
• What’s Next?
• Key Takeaways
GlencoreXstrata
Glencore Global Presence

4 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Glencore Diversified Global Operations

5 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Sudbury Integrated Nickel Operations
Sudbury Integrated Nickel Operations

Mining Operation
Plant

Strathcona Mill
Fraser Mine
Ni Rim 
South Mine

Smelter

City of 10km
Sudbury

7 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Our Values

Entrepreneurialism

Simplicity

Safety

Responsibility

Openness

8 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Sudbury Integrated Nickel Operations

• Our employees as well as


contractors worked 13
months
(5 million hours) without a
single lost time injury
in our integrated business
of exploration, mining,
milling, and smelting
activities.

9 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Nickel Rim South Mine
Nickel Rim South: Footprint

Wastewater
Shotcrete 115 kV
Collection
Receiving Substation
System
Intake
Main Shaft fans
Headframe

Backfill
Plant

Vent Shaft
Headframe
Exhaust
Fans

11 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Nickel Rim South: Underground

MAIN SHAFT VENTILATION SHAFT


7.6m Ø Ø 6.1m
1735m ↕ ↕ 1685m

3 captive levels until 2012


•Garage on each level
•3 mechanics per garage
•1 Supervisor
•1 Material Coordinator CONTACT ZONE
1280 L
FOOTWALL ZONE
1480 L

1660 L

12 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Phase 1 Shops: 2007 – 2008

13 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Phase 2 Shops: 2008 – 2012

• One shop per level


• Overhead crane
• Central tool box
• Lubrication
dispensing
• Fire suppression
and fire doors
• Two pieces of
equipment
• Small parts
storage area
• Challenges

14 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Vision with New Shop – The sell and strategy
Safety
• Ergonomic design
• Larger workspace and storage areas to improve housekeeping

Quality and Reliability


• Extend lifespan of equipment
• Minimized cost per hour of equipment fleet
• Space will enable a more comprehensive component replacement program

Revenue Opportunity
• A decrease in MTTR and breakdowns by improved maintenance practices
• Fleet reduction

Materials Savings
• Proactive maintenance and planned component replacement
• Inventory management of parts and tools in a centralized facility

Improve Labour Productivity


• Active supervision and a centralized workforce will create synergies
• Less contracting out of major work on equipment
15 // Caterpillar Confidential: GREEN / Global Mining Forum 2014
Planning the New Shop – How Cat partnered up to help us

• 2010 Caterpillar Mine Forum learnings


• Collaboration with Caterpillar and Ron Meischner
• Gap analysis and Caterpillar 5 baseline scoring
• Goal setting – Benchmarking with Surface Shop
• Challenge to achieve Caterpillar 5-Star
Contamination
Contamination Control
Control Per
PerSection
Section
100%
100%
100.0%
100.0%

90.0%
90.0%

80.0%
80.0%

70.0%
70.0%

60.0%
60.0%

% 50.0%
% 50.0% 42%
42%
38%
38%
40.0%
40.0%

30.0% 26%
26% 24%
30.0% 22% 21% 24%
22% 21% 20%
20%
20.0%
20.0% 14%
14%

10.0%
10.0% 0% 0% 0%
0% 0%
0% 0% 0%
0% 0% 0%
0%
0.0%
0.0% rucck

ag e
&I I
Fuue l

re : :
Svv c.
utee s

rtss
ini i ng

Hoose

m aan

idss
shh

e ss

sss

- RR&

coore
k

e
el
P aart

c.
s

Fluu id

Improvements by Cost
ng

se

to r ra g
linee s
ct ict ice
Waa s

Improvements by Cost
e TT ru
rib ut

Ree m

99- - F

ie ldld S
Trara in

22- - W

66- - H

a nnlin
55- - P

ll SS c
lk Fl
At tt trib

1133 -

l S to
Prara c

77- - R

ub e

oo l S
B uulk
11- - T

- FF ie

erarall
Clelea
- L ub
44- - P
33- - A

- TT oo
11%
88- - B

1100- L

OOvv e
C
11%
111 -

21%
lu idid
1

21%

1144 -
- FFlu
68%
1122 -

68%

Section
SectionOf
OfThe
TheGuide
Guide
LOW MED HIGH
LOW MED HIGH

16 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

17 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

18 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Ventilation 
Flow

19 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Wash Bay

20 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Equipmen
t Staging

21 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Shop

22 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Ramp 
Area

23 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Hose Bay
Storage 
Bay
Work Bay

24 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Hand Tool 
Storage

25 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Office and 
Tool Crib

26 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Reference 
Library

27 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Warehouse

28 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

2nd Floor 
Office & 
Lunch Room

29 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - Phase 3

Bulk Lube 
with 
Kidney 
Looping 

30 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Maintenance Facilities - March 2012

31 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Embracing Change
Through Engagement, Best Practices and Technology Advancement
Floor Dry – “Low Hanging Fruit”

33 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Desiccant Filters

Before After

34 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Hose Contamination

Would you use this hose? Today's hose practices! 

35 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Kidney Looping

36 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Warehousing Improvements

• Protecting our assets:

37 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Bulk Fuelling

Before After

38 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Technology – Advancing Predictive Maintenance

39 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Embracing Change - Setting Expectation

• Shift lineup and PASS

• Checklist sets expectations at the


beginning of every shift
– Allows employees to “Stop and
Correct” immediately

– Comprehensive list covering all


elements of the shop:
• Entry and exit inspections

• Cranes, ramps, floors, barricades,


and stands

• Lighting, housekeeping and garbage

• Storage and stacking

• Bulk lube storage

40 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Expectations

• Setting higher standards with best maintenance practices:


– Sampling techniques & particle counting

– Standardized maintenance practices (e.g. Notification process) leveraging planning &


scheduling effectiveness

– Re-wiring PM tasks (objective vs. subjective)

• S·O·SSM training for all personnel

• Component check sheets

41 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Training and Sustainability Improvements

• Training:
– OEM training on equipment specific
– Oil sampling techniques
– Basic lubrication
– On-site PSTs (Product Support Technicians)
– Best practices documented
• Testing:
– Particle counting
– Emissions
– Intake systems
• Audits:
– Yearly contamination control auditing
– PM audits
– Safety audits
42 // Caterpillar Confidential: GREEN / Global Mining Forum 2014
Operator Buy-In

• We explained what contamination control was & how it could


help the Mining teams
• We shared the results with the mining crews
• Told the Miners what they could do to help
• Acted on the ideas that they put forward
• We quickly seen buy in, such as the cleaning of equipment
before it came in for repairs (in most of cases the fellows give
there equipment daily wash downs)
• Less equipment damage due to increased ownership of clean
and well maintained fleet
• They are understanding the benefits of clean fluids and
maintain the fueling and lube areas to a higher standard

43 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Delivering Business Results
Caterpillar 5 Audit Score 23% to 96% in 3 years

• Knocking down low hanging ideas created environment of


trust and engagement, inspired creativity among workforce
..*Allowing Change to be embraced instead of resisted*..
Contamination
Contamination Control
Control Per
Per Section
Section
100% 100%
100% 100%
100% 100%
100% 100% 100%
100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100%
100.0% 96%
96%
100.0%
88% 90%
90%
88%
90.0%
90.0%
78%
78%
80.0%
80.0%

70.0%
70.0%

60.0%
60.0%

% 50.0%
% 50.0%

40.0%
40.0%

30.0%
30.0%

20.0%
20.0%

10.0%
10.0%
0%
0%
0.0%
0.0%

sss
luluidids

agge
ruucc k
maan
i nninin g

&I I
s ee

el l
rtss

SSvv c.

re: :
ess
utetes
s hh

li nnees
s

Fuue

- RR&

e
k
g

c oore
c.
s

Paart

Hoos
c titcic e

Imp
Imprroovement
vementss bbyyCCoost
Waas

st

torra
Reem

99-- F
ri bbu

e TTr
66-- H
55-- P
22-- W

ll lSSc
a nnli

1133 -

l S to
l k FF
Trarai

Prraac

iel dl d
77-- R
Attttri

oool S
Buul k

ubbe

CClelea
11-- T

- FFie

erraal
4 -- P
33-- A

- LLu
88-- B

17%

- TTo
17%

O vve
1111 -
4

lui di d
100-

O
- FFlu

144 -
1

57%

1
26% 57%
1122 -
26%

Section
Section Of
Of The
The Guide
Guide
LOW MED HIGH
LOW MED HIGH

45 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Component Life Extension: Comparison with Baseline

• Baseline (2008):
– Original equipment lifecycle budgets were estimated at this time
– Major components had ~ 2000 hrs reduced lifetime
• Example: engines lasted only 12000 hrs instead of 14000 hrs
• Midpoint (2011):
– Components now lasting expected lifetime
• Today (2014):
– Oil analysis to judge component life:
• > 2000 hrs added to expected lifetime
– Radiator soda washing:
• Expected service lifetime increased from 1000 hrs to 9000 hrs
– $100,000+ in savings

46 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Efficiency Improvements: PM Compliance
Able to increase up to 
73% man‐hrs schedule 
for PMs

35% man‐hrs 
were 
scheduled for 
PMs

73%

35%

47 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Efficiency Improvements: Unplanned Maintenance Hours

48 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Efficiency Improvements: Critical Equipment Availability

49 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Efficiency Improvements: Radiator Operating Hours

50 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Roadbed Improvements

51 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Efficiency Improvements: Equipment Tire Expenditures

52 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


U/G Fleet Distribution and Reduction

2009 2013
Year

53 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Recognizing our Accomplishments: Caterpillar 5-Star

54 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Recognizing our Accomplishments: PEM Award

55 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


What’s Next?
Projected Ore Extraction

57 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


What’s Next?

• Audits/spot checks
• Fuel system upgrades
• Training and awareness programs
• Continuous improvement of our processes
• Sustainability

58 // Caterpillar Confidential: GREEN / Global Mining Forum 2014


Key takeaways

• Without our new shop we may not


have achieved a “5 star rating”.
However, I believe we would of
taken the challenge on.. the
payback on our improvements
are amazing!

 Safety
 Culture
 Costs
 Equipment availability
 Fleet downsizing
 Credibility
Don’t let the things you can’t do, stand in
the way of the things you can do!
Questions?
© 2014 Caterpillar
All Rights Reserved
CAT, CATERPILLAR, their respective logos, “Caterpillar Yellow,” the “Power Edge” trade dress as
well as corporate and product identity used herein, are trademarks of Caterpillar and may not be
used without permission.

S-ar putea să vă placă și