Documente Academic
Documente Profesional
Documente Cultură
RENDIMIENTO =
UNIDAD =
1.00 MATERIALES
Cemento Portland Tipo I BL 0.1080 20.34
Arena Fina M3 0.0165 42.37
Agua M3 0.0039 1.27
= S/ 21.40
12.00 M2/DIA
M2
S/ 2.90
S/ 2.20
S/ 0.70
S/ 0.01
S/ 17.62
S/ 1.50
S/ 11.96
S/ 4.16
S/ 0.88
S/ 0.88
CUADRILL
ITEM DESCRIPCIÓN UNIDAD CANTIDAD P.U.
A
RENDIMIENTO =
UNIDAD =
1.00 MATERIALES
Porcelanato color gris M2 1.0700 228.81
Pegamento para porcelanato BL 0.2500 27.88
Agua M3 0.0025 1.27
Crucetas BL 0.0133 5.00
Porcelana BL 0.3333 6.69
0.31 0.015
PARCIAL TOTAL
= S/ 276.30
10.00 M2/DIA
M2
S/ 254.10
S/ 244.83
S/ 6.97
S/ 0.00
S/ 0.07
S/ 2.23
S/ 21.14
S/ 1.80
S/ 14.35
S/ 4.99
S/ 1.06
S/ 1.06
CUADRILL
ITEM DESCRIPCIÓN UNIDAD CANTIDAD P.U.
A
RENDIMIENTO =
UNIDAD =
1.00 MATERIALES
Ladrillo king kong 18 huecos UND 81.0000 0.57
Cemento Portland Tipo I BL 0.3423 20.34
Agua M3 0.0104 1.27
Arena Gruesa M3 0.0417 48.31
0.31 0.015
0.03893072 0.19106928
80.766
PARCIAL TOTAL
= S/ 94.96
5.55 M2/DIA
M2
S/ 54.98
S/ 45.99
S/ 6.96
S/ 0.01
S/ 2.01
S/ 38.08
S/ 3.24
S/ 25.85
S/ 8.99
S/ 1.90
S/ 1.90
PARA COMPLETAR
CUADRILL
ITEM DESCRIPCIÓN UNIDAD CANTIDAD P.U.
A
RENDIMIENTO =
UNIDAD =
1.00 MATERIALES
Madera tornillo UND 81.0000 0.57
Clavos KG 0.3423 20.34
Alambre de amarre N°8 KG 0.0104 1.27
Alambre de amarre N°16 KG 0.0417 48.31
0.31 0.015
PARCIAL TOTAL
= S/ 94.96
5.55 M2/DIA
M2
S/ 54.98
S/ 45.99
S/ 6.96
S/ 0.01
S/ 2.01
S/ 38.08
S/ 3.24
S/ 25.85
S/ 8.99
S/ 1.90
S/ 1.90