Documente Academic
Documente Profesional
Documente Cultură
General Inspection : OK
Measured Values in Ω
Ratio Ref.
R ph Y ph B ph
50/1 A 0.5 0.5 0.5
100/1A 0.7 0.7 0.8
200/1A 1.6 1.6 1.7
3. Ratio Test:
Phase OC 100 A
Earth Fault OC 20 A
3. Ratio Test:
Phase OC 100 A
Earth Fault OC 20 A
4.3 Primary Injection Test:
Measured Values in Ω
Terminal Ref.
R ph Y ph B ph
1S1 – 1S2 0.4 0.4 0.4
1S1 – 1S3 0.6 0.6 0.5
1S1 – 1S4 1.0 1.0 1.2
Measured Values in Ω
Ref.
R ph Y ph B ph
2S1 – 2S2 0.5 0.4 0.4
2S1 – 2S3 0.9 0.8 0.9
2S1 – 2S4 1.6 1.6 1.5
3. Ratio Test:
Terminal Ref. R Y B
1a – 1n 0.5 0.5 0.5
3. Ratio Test:
3. Ratio Test:
2. Service Settings:
Phase Ref Set Current(A) Pick Up Current(A) Set Time(S) Operated Time(S)
RY 0.3 0.306 1.00 1.069
YB 0.3 0.308 1.00 1.023
BR 0.3 0.305 1.00 1.032
Earth Fault OC (Ie>):
Phase Operated
Set Current(A) Pick Up Current(A) Set Time(S)
Ref Time(S)
R 0.2 0.205 1.00 1.032
1 LBS 1,2 and Circuit Breaker’s Earth Switch mechanical operation check OK
2 LBS 1,2 Load Break Switch mechanical and Electrical operation check OK
3 Circuit Breaker Disconnector Mechanical operation check OK
4 Circuit Breaker Electrical and Mechanical ON& OFF operation check OK
5 Circuit Breaker trip check through feeder Protection Relay OK
5. Remarks : Test results of Ring Main Unit are found satisfactory.