Sunteți pe pagina 1din 4

Diameter Quantity of Cement & Sand for CHB 0.

042 gals = Adhesive per m² for


kg/m # Inches PRODUCTIVITY RATE
(mm) mortar per sq.m Vinyl Tiles
6 0.222 2 1/4 Excavation CHB Cement Sand 1 kg = Cement filler per m²
10 0.617 3 3/8 Manual 4 mh/m³ (size) (bags) (m³) of tiles
12 0.888 4 1/2 Machine 0.25 mh/m³ 4" 0.525 0.04375 0.076 bags = Cement paste per m²
16 1.579 5 5/8 Backfilling w/ 6" 1.013 0.08438 of tiles
0.5 mh/m³
20 2.467 6 3/4 Compaction 8" 1.5 0.125 10 mins = Per batch for one
25 3.855 8 1 Rebars (Fabrication & Installation) Rebars apprx. 3.8 kgs/m² bagger mixer
28 4.835 9 1-1/8 Foundation 0.035 mh/kg 5 gals = Approximate water per
Cement Factor for Mortar per m³
32 6.316 10 1-1/4 Suspended 0.05 mh/kg one bag of cement
36 7.993 11 1-3/8 Formworks Class Cement Sand 6 bags = 1 : 3 : 6 Mix
Gauge # mm Gauge # mm Installation 3 mh/m² A 1:2 18 1 7.5 bags = Class C 1600 psi
5 5.3 17 1.37 Stripping 1 mh/m² B 1:3 12 1 1 : 2½ : 5 Mix
6 4.9 18 1.22 Concrete Pouring C 1:4 9 1 9 bags = Class B 2500 - 2000 psi
7 4.55 19 1.06 By Crane & Bucket 4.5 mh/m³ D 1:5 7.5 1 1 : 2 : 3 Mix
8 4.18 20 0.91 By Pump 2.5 mh/m³ Cement Factor for Concrete 12 bags = Class AAA
9 3.8 21 0.84 Concrete Screeding Strength Ordinary Pumpcrete 4000 - 5000 psi
10 3.41 22 0.76 Manual Float 0.3 mh/m² 1500 psi 8 1 : 2½ : 3 Mix
11 3.04 23 0.61 Power Trowel 0.02 mh/m² 1600 psi 8 Tool Joint Finish
12 2.65 24 0.53 Plastering 1 mh/m² 2000 psi 8.5 = 0.0576 m² mortar per m²
13 2.28 25 0.46 Concrete Topping 0.7 mh/m² 2500 psi 9 10 For 4' x 8' of plywood nails
14 1.9 26 0.42 Wall Tiles 3 mh/m² 3000 psi 10 11.5 = 0.1 kg/sheet
15 1.71 27 0.38 Floor Tiles 2.5 mh/m² 3500 psi 11.25 13.5 Formworks = 100 - 140 bdft / m²
16 1.52 28 0.34 Painting 4000 psi 12.75 14.5 Form Plywood = 0.80 sheet x m²
Conversion ALT Key Wall Tiles 0.15 mh/m² 5000 psi 16 17 Nails ( 1 keg ) = 2000 Bdft
1m 3.28 ft ® 0174 Ceiling 0.2 mh/m² 6000 psi 18 18 Tie Wire for Forms = 0.01 kg / Bdft
1m 1.094 yards © 0169 Ceiling GI Wire = kgs of rebars / 2900 Bonds
1 kg 9.806 N ™ 0153 Frame 2.7 mh/m² No. of Rolls ( 1 roll = 45 kgs ) Bid % = 0.005 of cost
1 kg 2.205 lbs ± 0177 Plywood 2 mh/m² Structural Steel Framing Performance % = 0.008 of cost
1 Mpa 145 psi ² 0178 Waterstop 1.5 lm/mh Light 168 mh/MT Payment % = 0.008 of cost
1m 3
1000 liters ³ 0179 Pebble Finish 2.9 mh/m² Heavy 64 mh/MT Guarantee % = 0.01 of cost
1 US Gal 3.785 liters µ 0181 Marble Slab 2 mh/m² Trenching CAR % = 0.002 of cost
1000 kg 1 metric ton º 0186 Disposal of Soil 1.7 mh/m³ Hand 6 mh/m² SSS, Medicare,
= 15% of Labor Cost
1 kg 35.274 ounce ¼ 0188 Hauling of Soil 1 mh/m³ Machine 0.50 mh/m² 13th Month Pay
1 mile 1609.34 m ½ 0189 Fab. Of Wooden Truss 47 BF/m-day Trenching 2.0 - 2.5 mh/m² Material Testing
Unit Weight ¾ 0190 T & G Flooring 112 BF/m-day Batterboard For Concrete - 1 sample for every 15m³
Steel 7,852.70 kg/m3 Ø 0216 Vinyl Tiles 1.7 mh/m² 2 x 2 = Area x 4.85 For Rebar - Approximately3 samples for
Concrete 23.54 kN/m3 ø 0248 Partition including Frame 2 x 3 = Area x 7.28 every truck load ( 20,000 kgs )
Water 9.81kN/m3 ° 0176 Single 2.5 mh/m² Nails = Bdft / 1000 x 15
Lumber 321.963 kg/m3 ‡ 0135 Double 3.4 mh/m² Rolls of Wire = Bdft / 4000 eba
• 0149 º 0186 ¤ 0164 × 0215 ° 0176 ñ 0241
Steel=490 lbs/ft³ ¢ 0162 » 0187 ¥ 0165 ß 0223 Ü 0220
Concrete with steel=2450 kg/m³ £ 0163 Ñ 0209 « 0171 ÷ 0247 ¹ 0185

Prepared by bernard
DEFORMED REINFORCING BARS

AREA WEIGHT WEIGHT/PC. (kg)


Ø (mm) NOTES
(mm²) (kg/m) L=6m L=12m
5 20 0.154 0.925 1.850
6 28 0.222 1.332 2.663
8 50 0.395 2.368 4.735
10 79 0.617 3.699 7.398
12 113 0.888 5.327 10.654
16 201 1.578 9.470 18.940
20 314 2.466 14.797 29.594
25 491 3.853 23.120 46.240
32 804 6.313 37.880 75.760

WELDED WIRE MESH

SPACING AREA STANDARD WEIGHT


Ø (mm)
(mm) (mm²) DESIGNATION (kg/m²)

5 200 20 A98 1.54


150 20 A131 2.06
6 200 28 A141 2.22
150 28 A188 2.96
8 200 50 A251 3.95
150 50 A335 5.26
10 200 79 A393 6.17
150 79 A524 8.22

ASTM STANDARD PRESTRESSING TENDONS SEVEN-WIRE STRAND


(GRADE 1860)

Ø (mm) AREA (mm²) WEIGHT (kg/m) NOTES

9.53 54.8 0.432


11.1 74.2 0.582
12.7 98.7 0.775
15.24 140.0 1.102

S-ar putea să vă placă și