SAFETY DISTANCES BETWEEN EQUIPMENT WITHIN PROCESS UNIT

No. Facility Distance requirement up to Applicable Clause Distance Distance Remarks


facility Standard required (m) provided (m)

(ref. class-A)
OISD 118 Table-4 44 85.7
(D+d)/4 Min 10 m
Refrigerated LNG storage tank (1/4 of sum of diameters
OISD 194 5.9.1 44 85.7
of each tank)
PNGRB ANNEXURE II 44 85.7 (D+d)/4
(ref. class-A)
OISD 118 Table-3 44 105
0.5D Min 20m
Plant Boundary
OISD 194 5.9.1 61 105 0.7* Tank dia or 30 m minimum
PNGRB 1.7.1 61 105 0.7* Tank dia or 30 m minimum
OISD 118 Table-1 30 76 (ref. class-A)
STV/SCV OISD 194 5.9.2 15 76
PNGRB ANNEXURE II 30 76
OISD 118 Table-1 30 121 (ref. class-A)
For Process equipment spacing Table 2 of OISD-STD-118 as
Air Heaters OISD 194 5.9.3 30 121
applicable shall be followed.
PNGRB ANNEXURE II 30 121
OISD 118 Table-1 60 182 (ref. class-A)
Substation OISD 194 5.9.4 60 182
PNGRB ANNEXURE II 60 182
OISD 118 Table-1 60 259 (ref. class-A)
Control room OISD 194 5.9.4 60 259
PNGRB ANNEXURE II 60 259
OISD 118 Table-1 30 34 (ref. class-A)

Boil-off compressor unit OISD 194 5.9.3 30 34 For Process equipment spacing Table 1 of OISD-STD-118 as
applicable shall be followed.
PNGRB ANNEXURE II 30 34
OISD 118 Table-1 30 34 (ref. class-A)
Refrigerated
1 LNG storage HP pump OISD 194 5.9.3 30 34 For Process equipment spacing Table 1 of OISD-STD-118 as
applicable shall be followed.
tank
PNGRB ANNEXURE II 30 34
ref. class-A
OISD 118 Table-1 30 45(373)
( ) from future
LNG Truck loading facilities
OISD 194 5.9.5 30 45(373) ( ) from future
PNGRB ANNEXURE II 30 45(373) ( ) from future
OISD 118 Table-1 90 608 (ref. class-A)

Flare OISD 194 5.9.3 90 608 For Process equipment spacing Table 1 of OISD-STD-118 as
applicable shall be followed.
PNGRB ANNEXURE II 90 608
ref. class-A
OISD 118 Table-1 60 325(228)
( ) from future
1.For Process equipment spacing Table 1 of OISD-STD-118 as
Fire station
OISD 194 5.9.3 60 325(228) applicable shall be followed.
2. ( ) from future
PNGRB ANNEXURE II 60 325(228) ( ) from future
Service buildings (Ware house / OISD 118 Table-1 60 267(131) ( ) from future
Workshop)
The fire water storage should be located as far away as possible
(not less than 60 M) from hazardous areas to avoid any damage
Fire water storage OISD -116 5.4.1 60 367(261) in case of fire/explosion.

( ) from future
Utilities unit 208
OISD 118 Table-1 60 192 (ref. class-A)
GEG OISD 194 5.9.4 60 192
PNGRB ANNEXURE II 60 192
Metering facilities OISD 118 Table-1 30 69(378) ( ) from future

Diesel storage tank OISD 118 Table-1 30 217

Boil-off OISD 118 Table-1 15 135


Substation
compressor unit PNGRB ANNEXURE II 15 135
SAFETY DISTANCES BETWEEN EQUIPMENT WITHIN PROCESS UNIT
No. Facility Distance requirement up to Applicable Clause Distance Distance Remarks
facility Standard required (m) provided (m)

OISD 118 Table-1 45 97


LNG Truck loading facilities
PNGRB ANNEXURE II 45 97
OISD 118 Table-1 90 754
Flare
PNGRB ANNEXURE II 90 754
OISD 118 Table-1 30 322
Control room
PNGRB ANNEXURE II 30 322
Plant OISD 118 Table-1 60 185
Boundary PNGRB ANNEXURE II 60 185
OISD 118 Table-1 60 409
Fire station
PNGRB ANNEXURE II 60 407
2
Service buildings
OISD 118 Table-1 60 390
(Ware house / Workshop)
HP pump OISD 118 Table-2 7 47
Air Heaters OISD 118 Table-2 7 72
STV/SCV OISD 118 Table-2 22 27
The fire water storage should be located as far away as possible
Fire water storage OISD -116 5.4.1 60 451 (not less than 60 M) from hazardous areas to avoid any damage
in case of fire/explosion.
OISD 118 Table-1 15 160
GEG
PNGRB ANNEXURE II 15 160
Metering facilities OISD 118 Table-1 36 80(85) ( ) from future
Diesel storage
OISD 118 Table-1 30 178 (ref. class-B)
tank
OISD 118 Table-1 15 152
Substation
PNGRB ANNEXURE II 15 152
OISD 118 Table-1 45 207(201) ( ) from future
LNG Truck loading facilities
PNGRB ANNEXURE II 45 207(201) ( ) from future
OISD 118 Table-1 90 733(730) ( ) from future
Flare
PNGRB ANNEXURE II 90 733(730) ( ) from future
OISD 118 Table-1 30 252(210) ( ) from future
Control room
PNGRB ANNEXURE II 30 252(210) ( ) from future
Plant OISD 118 Table-1 60 195
Boundary PNGRB ANNEXURE II 60 195
OISD 118 Table-1 60 334(285) ( ) from future
Fire station
PNGRB ANNEXURE II 60 334(285) ( ) from future
3 HP pump
Service buildings
OISD 118 Table-1 60 305 (248) ( ) from future
(Ware house / Workshop)
Air Heaters OISD 118 Table-2 2 76(77) ( ) from future
STV/SCV OISD 118 Table-2 20 45(56) ( ) from future
The fire water storage should be located as far away as possible
Fire water storage OISD -116 5.4.1 60 376 (not less than 60 M) from hazardous areas to avoid any damage
in case of fire/explosion.
OISD 118 Table-1 15 148
GEG
PNGRB ANNEXURE II 15 148
Metering facilities OISD 118 Table-1 36 198(201) ( ) from future
Diesel storage
OISD 118 Table-1 30 268 (ref. class-B)
tank
OISD 118 Table-1 15 21
Substation
PNGRB ANNEXURE II 15 21
OISD 118 Table-1 45 142(293) ( ) from future
LNG Truck loading facilities
PNGRB ANNEXURE II 45 142(293) ( ) from future
OISD 118 Table-1 90 817(810) ( ) from future
Flare
PNGRB ANNEXURE II 90 817(810) ( ) from future
OISD 118 Table-1 30 222(36) ( ) from future
Control room
PNGRB ANNEXURE II 30 222(36) ( ) from future
Plant OISD 118 Table-1 60 67(75) ( ) from future
Boundary OISD 194 5.9.2 30 67(75) ( ) from future
PNGRB ANNEXURE II 30 67(75) ( ) from future
OISD 118 Table-1 60 314(62) ( ) from future
4 Air Heaters Fire station
SAFETY DISTANCES BETWEEN EQUIPMENT WITHIN PROCESS UNIT
No. Facility Distance requirement up to Applicable Clause Distance Distance Remarks
facility Standard required (m) provided (m)
4 Air Heaters Fire station
PNGRB ANNEXURE II 60 314(62) ( ) from future
Service buildings
OISD 118 Table-1 60 321(55) ( ) from future
(Ware house / Workshop)
STV/SCV OISD 118 Table-2 15 38
The fire water storage should be located as far away as possible
Fire water storage OISD -116 5.4.1 60 354 (not less than 60 M) from hazardous areas to avoid any damage
in case of fire/explosion.
OISD 118 Table-1 15 31
GEG
PNGRB ANNEXURE II 15 31
Metering facilities OISD 118 Table-1 36 62(23) ( ) from future
Diesel storage
OISD 118 Table-1 30 33 (ref. class-B)
tank
PNGRB 1.7.2 2 5.6
STV/SCV
OISD 118 Table-2 2 5.6
OISD 118 Table-1 15 103
Substation
PNGRB ANNEXURE II 15 103
OISD 118 Table-1 45 125(302) ( ) from future
LNG Truck loading facilities
PNGRB ANNEXURE II 45 125(302) ( ) from future
OISD 118 Table-1 90 783(759) ( ) from future
Flare
PNGRB ANNEXURE II 90 783(759) ( ) from future
OISD 118 Table-1 30 300
Control room
PNGRB ANNEXURE II 30 300
Plant OISD 118 Table-1 60 152(137) ( ) from future
Boundary OISD 194 5.9.2 30 152(137) ( ) from future
5 STV/SCV PNGRB 1.7.2 30 150(137) ( ) from future
OISD 118 Table-1 60 389(189) ( ) from future
Fire station
PNGRB ANNEXURE II 60 389(189) ( ) from future
Service buildings
OISD 118 Table-1 60 379(153) ( ) from future
(Ware house / Workshop)
The fire water storage should be located as far away as possible
Fire water storage OISD -116 5.4.1 60 431 (not less than 60 M) from hazardous areas to avoid any damage
in case of fire/explosion.
OISD 118 Table-1 15 112(126) ( ) from future
GEG
PNGRB ANNEXURE II 15 112(126) ( ) from future
Metering facilities OISD 118 Table-1 36 76(72) ( ) from future
Diesel storage
OISD 118 Table-1 30 161 (ref. class-B)
tank
OISD 118 Table-1 30 217(269) ( ) from future
LNG Truck loading facilities
PNGRB ANNEXURE II 30 217(269) ( ) from future
OISD 118 Table-1 90 898(898) ( ) from future
Flare
PNGRB ANNEXURE II 90 898(898) ( ) from future
OISD 118 Table-1 0 249(217) ( ) from future
Control room
PNGRB ANNEXURE II 0 249(217) ( ) from future
Plant OISD 118 Table-1 15 16
Boundary PNGRB ANNEXURE II 15 16
6 Substation
OISD 118 Table-1 0 385(308) ( ) from future
Fire station
PNGRB ANNEXURE II 0 385(308) ( ) from future
Service buildings
OISD 118 Table-1 12 403(328)
(Ware house / Workshop)
GEG 118(40) ( ) from future
Metering facilities OISD 118 Table-1 15 143(210) ( ) from future
Diesel storage
OISD 118 Table-1 30 107 (ref. class-B)
tank
OISD 118 Table-1 90 742
Flare
PNGRB ANNEXURE II 90 742
OISD 118 Table-1 45 494
Control room
PNGRB ANNEXURE II 45 494
Plant OISD 118 Table-1 60 77
Boundary PNGRB ANNEXURE II 30 77
LNG Truck
7 loading
facilities
SAFETY DISTANCES BETWEEN EQUIPMENT WITHIN PROCESS UNIT
No. Facility Distance requirement up to Applicable Clause Distance Distance Remarks
facility Standard required (m) provided (m)

LNG Truck OISD 118 Table-1 60 581


Fire station
7 loading PNGRB ANNEXURE II 90 581
facilities
Service buildings
OISD 118 Table-1 60 554
(Ware house / Workshop)
OISD 118 Table-1 30 269
GEG
PNGRB ANNEXURE II 30 269
Metering facilities OISD 118 Table-1 45 53(99) ( ) from future
Diesel storage
OISD 118 Table-1 30 218 (ref. class-B)
tank
OISD 118 Table-1 90 895
Control room
PNGRB ANNEXURE II 90 895
Plant From terminal Plant
OISD 118 Table-1 90 541
Boundary Boundary is 541m
PNGRB ANNEXURE II 90 541
OISD 118 Table-1 90 917
Fire station
PNGRB ANNEXURE II 90 917
8 Flare
Service buildings
OISD 118 Table-1 90 792
(Ware house / Workshop)
OISD 118 Table-1 90 886
GEG
PNGRB ANNEXURE II 90 886
Metering facilities OISD 118 Table-1 90 800
Diesel storage
OISD 118 Table-1 90 967 (ref. class-B)
tank
Plant OISD 118 Table-1 30 31
Boundary PNGRB ANNEXURE II 30 31
OISD 118 Table-1 30 38
Fire station
PNGRB ANNEXURE II 30 38
Service buildings
OISD 118 Table-1 12 94
9 Control room (Ware house / Workshop)
OISD 118 Table-1 0 106
GEG
PNGRB ANNEXURE II 0 106
Metering facilities OISD 118 Table-1 90 463(458) ( ) from future
Diesel storage
OISD 118 Table-1 45 482 (ref. class-B)
tank
OISD 118 Table-1 12 19
Fire station
PNGRB ANNEXURE II 12 19
Service buildings
OISD 118 Table-1 6 16
(Ware house / Workshop)
10 Plant Boundary OISD 118 Table-1 15 29(18) ( ) from future
GEG
PNGRB ANNEXURE II 15 29(18) ( ) from future
Metering facilities OISD 118 Table-1 60 79(79) ( ) from future
Diesel storage (ref. class-B)
OISD 118 Table-1 15 19
tank (ref. OISD-118 table-3)
Service buildings
OISD 118 Table-1 12 90
(Ware house / Workshop)
OISD 118 Table-1 0 197
GEG
11 Fire station PNGRB ANNEXURE II 0 197
Metering facilities OISD 118 Table-1 60 554(545) ( ) from future
Diesel storage
OISD 118 Table-1 60 573 (ref. class-B)
tank
Service building GEG OISD 118 Table-1 12 238
(Ware house / WMetering facilities OISD 118 Table-1 60 545(544) ( ) from future
12
Diesel storage
OISD 118 Table-1 30 573 (ref. class-B)
tank
Metering facilities OISD 118 Table-1 60 299(283) ( ) from future
Diesel
13 GEG
storage OISD 118 Table-1 30 305
tank
Diesel
( ) from future
14 Metering faciliti storage OISD 118 Table-1 30 144(102)
SAFETY DISTANCES BETWEEN EQUIPMENT WITHIN PROCESS UNIT
No. Facility Distance requirement up to Applicable Clause Distance Distance Remarks
facility Standard required (m) provided (m)
14 Metering faciliti OISD 118 Table-1 30 144(102)