Sunteți pe pagina 1din 2

Project Spreadsheets to Eurocode 2 The Concrete Centre

Client BigBucks PLC Made by Date Page


Location Pilecap F13 Rod 25-Sep-19 293
PILECAP DESIGN to EN 1992-1: 2004 (without UK NA) Triple Pilecap Checked Revision Job No
Originated from TCC82.xls v 4.1 on CD © 2003 - 2019 TCC - - FB625

DIMENSIONS mm Usage: Office


COLUMN PILECAP
® = 900 A = 400
- = 1800 B = 1200
C = 1200
Pile Ø = 200 E = 600
Min spacing = 600 depth H = 1200
Tolerance = 0

KEY
COLUMN ACTIONS kN, kNm characteristic PLOT (to scale)
DEAD IMPOSED WIND
VALID DESIGN
Axial (kN) 75.0 100.0 10.0 STATUS
Mx (kNm) 50.0 5.0 2.0
My (kNm) 50.0 5.0 5.0 PILE REACTIONS kN characteristic
Hx (kN) PILE 1 PILE 2 PILE 3
Hy (kN) Gk + Qk 74.5 53.6 145.3
ψ0 = 0.7 0.5 Gk + Qk +Wk 75.3 56.6 151.6
REINFORCEMENT
EW (2-3) M = 124.3 kNm, b = 1,200 mm
d = 1,105.0 mm, As = 272 mm² 4H8 06 T1
8H16 B = 1,608 mm²

VEd = 207.1 kN, bw = 1,200 mm 8H16 05 B1


vEd = 0.156 N/mm², Asw/S = 1.136 mm Links 5H12 07 375 + 2x5H12 08 375
4 LegsH12 @ 375 LINKS = 1.206 mm ↑ ELEVATION

NS (1-2/3) M = -9.0 kNm, b = 900 mm


d = 1,089.0 mm, As = -20 mm² 4H8 10 T2
8H16 B = 1,608 mm²

VEd = 108.2 kN, bv = 1,260 mm 8H16 09 B2


vEd = 0.079 N/mm², Asw/S = 1.193 mm Links 4H12 11 375 + 2x4H12 12 375
4 LegsH12 @ 375 LINKS = 1.206 mm ← ELEVATION

Project Spreadsheets to Eurocode 2 The Concrete Centre

Client BigBucks PLC Made by Date Page


Location Pilecap F13 Rod 25-Sep-19 294
PILECAP DESIGN to EN 1992-1: 2004 (without UK NA) Triple Pilecap Checked Revision Job No
Originated from TCC82.xls v 4.1 on CD © 2003 - 2019 TCC - - FB625

Cap load = 98.4 kN Group centre @ 800 m from pile 1

PILE REACTIONS kN
PILE 1 PILE 2 PILE 3 OVERTURNING MOMENTS - kNm characteristic
Gk + Qk 74.5 53.6 145.3 . DEAD IMPOSED WIND
Gk + Qk +Wk 75.3 56.6 151.6 Mx 50.0 5.0 2.0
1.35Gk + 1.5Qk 107.4 75.8 200.8 My 35.0 -15.0 3.0
1.0Gk + 1.5Wk 29.9 35.1 123.4 .
1.35Gk + 1.5Qk + 0.75Wk 108.2 78.8 207.1 .
BENDING MOMENTS - kNm
1.35Gk + 1.5Qk 1.0Gk + 1.5Wk 1.35Gk + 1.5Qk + 0.75Wk
My v of col -32.2 -9.0 -32.5
My ^ of col -83.0 -47.6 -85.8 (including tolerance)
Mx 120.5 74.1 124.3

E-W STEEL N-S STEEL


M= 124.3 Ø16 M= -9.0 Ø16 K' = 0.2067
b= 1200 b= 900 min As = 0.167%
d= 1105.0 d= 1089.0
K= 0.0024 K= -0.0002
z= 1049.8 z= 1034.6
As = 272 As = -20
Provide 1476 Provide 1454
No = 8 No = 8
As prov = 1608 As prov = 1608
σs = 52 σs = -4
Max S = 300.0 Max S = 300.0
Min S = 41.0 Min S = 41.0
S= 94.3 8H16 B S= 94.3 8H16 B

SHEAR Crit section is 60.0 from pile centres


PILES 2 & 3 Ø12 links
VEd = 207.1 b = 1200 ρl = 0.121% cotθ = 2.50
av = 540.0 vEd = 0.1562 vRd 2d/av = 1.4096 vRd,max = 4.152
Asw/S = 1.1359 No of legs = 4 Spacing = 375 4 LegsH12 @ 375 LINKS
PILE 1 Ø12 links
VEd = 108.2 b = 1260 ρl = 0.117% cotθ = 2.50
av = 540.0 vEd = 0.0789 vRd 2d/av = 1.4142 vRd,max = 4.152
Asw/S = 1.1927 No of legs = 4 Spacing = 375 4 LegsH12 @ 375 LINKS

PUNCHING At column Face At . No critical perimeter


VEd = 258.8 u1 = 3138 β = 5.243
vEd = 0.044 d ave = 1097.0 vEd = 0.0000
vRd,max = 6.020 ok ρl = 0.082% vRd 2d/av = 1.4119 ok

S-ar putea să vă placă și