Sunteți pe pagina 1din 1

5 42 HA 8 e= 25 Inf)

COUPE TYPE
NAPPE TS SUR APPUIS

5 6 HA 8 e=25 Inf)
DALLE
40

ST 25 - INF TS
S.B.7

As:+156.27 8 HA 10 16 40

S.B.6
66 66 66 Ai:+156.02 4 HA 12 (U) 14
25 CSP 66
14 4 HA 12 (U) 4 HA 8 18 4 HA 8 19

TS 1 SOUDURE MINI
13 20 HA 8 e=25 13 20 HA 8 e=25 AT2
S.B.1 S.B.2 SUR APPUI
12 20 HA 8 e=25 12 20 HA 8 e=25
AT2 8 HA 10 11 17 14 HA 12 LG = 6.0 m - Valable : 7.x LG = 6.0 m - Valable : 2.x
13
S.B.3 S.B.4 S.B.7
45

13 31 2 HA 10
45

18 APPUI

12 27 2 HA 10 LG: 6m, Valable: 2.x LG: 4m, Valable: 4.x LG: 5m, Valable: 4.x COUPE TYPE
Boite D'attentes Boite D'attentes
HA 8 e = 20 (h=17) HA 8 e = 20 (h=17) 16
11 40 25 DETAIL LIAISON SB
NOTA GENERAL
5 21 HA 8 e=25

25 4 HA 8
2 HA 10 27 25
F

Valable : 1.x
IN

As:+156.70
-

24 24 HA 8 e=25
Ai:+156.45
26 24 HA 8 e=25 DETAIL LIAISON S.B.3 DETAIL LIAISON S.B.4 , S.B.5
S.B.5
35

25 CS P
Documents de référence
ST

4 HA 8 39 Valable : 1.x Valable : 5.x

45
45 4 HA 8 4 HA 8 43 - Dossier PRO transmis le 14/01/2019 (voir note d'hypothèses général)
31 2 HA 10 27 2 HA 10 Armatures Armatures SB
38 2 HA 8
Verticaux RDC

47
Classes d'exposition

41
10 40 40 10 10 40 40 10

59
2 HA 8 43 - Ouvrages en contact avec l'extérieur : XF1
33 6 HA 10 - Ouvrages intérieurs : XC1
6 HA 10 44
H H
DETAIL LIAISON S.B.1 DETAIL APPUI S.B.1
60

6 HA 10 42 Bétons
Valable : 7.x Valable : 2.x 37 6 HA 10 37 6 HA 10
- Classe de résistance minimale : C25/30
VUE EN PLAN Armatures
Detail liaison SB SAUF INDICATION CONTRAIRE SUR LES PLANS !!!
10 45 45 10
10 45
AT 1 AT 2 Enrobages des aciers
30 2 HA 10 (U) S.B.5 S.B.6 Valable: 1.x Valable: 2.x COUPE TYPE DETAIL LIAISON ANGLE DETAIL LIAISON ANGLE DETAIL LIAISON ANGLE

e
LG: 5.3m, Valable: 1.x LG: 1.5m, Valable: 1.x 20 DETAIL LIAISON ANGLE SB S.B.7 S.B.4 S.B.3, S.B.7 - Enrobage global : 3 cm
- Ouvrages en contact avec le sol : 5 cm 2
20 - Ouvrages en contact avec l'extérieur: 4 cm
25 Valable : 1.x Valable :1.x Valable :3.x

2
25 Valable : 2.x
- Toutes les aretes sont chanfreinées à 45°
28 4 HA 10 29 4 HA 8 Qualité des aciers
50 50

55
55
32 2 HA 8 (U) 4 HA 8 41 50 4 HA 10 Armatures Armatures SB 10 40 - HA : Fe 500 MPa (fyk= 500 MPa )
34 4 HA 10 Verticaux RDC - DX : Fe 235 MPa (fyk= 235 MPa )
4 HA 8 46
Protection contre les chutes d'hommes
Protection suivant aciers
CORBEILLE 1 Bouchons de protection ou mesures de protection

65
crossés en usine

LG = 4.0 m - Valable : 2.x


DETAIL LIAISON 2 HA 8 41
3 HA 10 36 3 HA 10 36
spéciales mises en oeuvre par l'entrepreneur

3 HA 10 47 Barres ≤ HA12 Attentes crossées.


CORBEILLE 1 Armatures 1 HA 8 48
1 HA 8 49
Barres > HA 12 ou
Attentes non crossées.
Protection par système rapporté
(bouchon ou goulottes PVC)
40 Valable : 2.x 6 HA 10 40 Detail liaison SB
7 HA 8 e=10 (cad) 35 8 HA 8 e=10 (cad) 51 Les crosses des attentes sont à couper avant coulage du voile
20 20 HA 6 e=20
50 50
Vent Neige
28

Région II Région A1
162 HA 8 e=10 7

Terrain catégorie IV
I I 21 2 HA 10
S.B.4

22 2 HA 10
REGLEMENT
- Les calculs de structure sont conduits sur la base des règlements suivants:
138 HA 8 e=25 (Inf) 2

44 DETAIL LIAISON ANGLE DETAIL LIAISON S.B.2 Liste barres - façonnage -


-
NF EN 1990 EUROCODE 0
NF EN 1991 EUROCODE 1
-
-
NF P94-261
NF P94-262
S.B.1

Valable : 2.x - NF EN 1992 EUROCODE 2 - NF P94-282


CORBEILLE 1 Pos. Pièc ø Longueur Façonnage+cotation Longueur Masse 47
- NF EN 1998 EUROCODE 7 - NF EN206-1
40 6 10 5.00 30.00 18.51
Valable : 1.x unitaire (non à l'échelle) totale 20 40 6 1.11 44.40 9.86
500

18
CSP 25 55 55 [mm] [m] [m] [kg] 41 6 8 5.00 30.00 11.85
Ai:+156.45 500 C 12/07/2019 Mise à jour général. BNT HNG
23 2 HA 10
As:+156.70 1 19 8 4.96 94.24 37.22 B Mise à jour général. BNT HNG
496 21/06/2019
21 4 10 4.00 16.00 9.87 42 24 10 4.00 96.00 59.23 A 31/05/2019 CREATION DU DOCUMENT BNT HNG
400 400
As:+156.64
60 Indice Date Mises à jour Dessin Appro
Ai:+156.45 2 200 8 1.35 270.00 106.65
19 CSP
22 4 10 1.00 4.00 2.47 43 24 8 4.00 96.00 37.92 Suivi des modifications :

15
100 400
F

F
ST 35 - IN

T 5 0 - IN

28 6 HA 10 60 44 12 10 6.00 72.00 44.42


3 68 8 1.28 87.04 34.38
128 600
23 2 10 1.20 2.40 1.48
UNIVERSITE PARIS SUD

60
2X S

4 107 8 1.38 147.66 58.33 45 8 8 6.00 48.00 18.96


138 600

CONTRAT DE PARTENARIAT POUR LA


3 46 4 8 1.50 6.00 2.37
REALISATION DU POLE

10
55
150
5 69 8 1.25 86.25 34.07 24 168 8 2.23 374.64 147.98

19
15

65 MAÎTRISE D'OUVRAGE
82 47 6 10 1.40 8.40 5.18 BIOLOGIE-PHARMACIE-CHIMIE MAÎTRE D'OUVRAGE
PLATON SACLAY

10
60 25 28 8 6.00 168.00 66.36 a.touzet@bouygues-construction.com
600
6 15 8 1.38 20.70 8.18
55
SITE IDEEV CONT ROLE T ECHNIQ UE
J 48 2 8 1.20 2.40 0.95 SOCOTEC
18

10
jerome.basle@socotec.com

10
40

40

26 48 8 1.73 83.04 32.80


AT1

19
10 26 HA 8 e=25 (Inf) 21 HA 8 e=25 (Inf) 9 GROUPEMENT DE CONCEPTION-REALISATION
55
7 162 8 1.20 194.40 76.79 55
57 49 1 8 1.20 1.20 0.47 SE1
S.B.3

SERRES
10

CONSTRUCTEUR
Bouygues Construction
4 107 HA 8 e=30 (Inf)

44

10
44 27 12 10 6.00 72.00 44.42 HA1
a.becquart@ bouy gues -construction.com
600
60
As:+156.64 8 11 8 1.30 14.30 5.65 SE2 ARCHIT ECT E B ATIMENT E NSEIGNEM ENT COE UR DE PO LE

HANGARS
28 40 10 1.10 44.00 27.15 50 8 10 1.33 10.64 6.56 BTuA

13
Ai:+156.44
As:+156.64
10

20 CSP 110 120 nyc@ tschumi.com


Ai:+156.42 BP2 v.desc harr ieres@ ts chumi.com
22 CSP BP1 BP3
14
29 28 8 0.90 25.20 9.95 ARCHITECTE BATIMENT RECHERCHE
1 19 HA 8 e=30 (Inf) -2°lit

60
Groupe 6

10
9 21 8 1.30 27.30 10.78 90 51 16 8 0.77 12.32 4.87
°lit

sandrine.rey@groupe-6.c om

Batiment Principal
-1

14
10

3 4 Nord
76 HA2
ARCHITECTE IDEEV
NF

30 4 10 1.66 6.64 4.10


Baumschlager Eberle Architectes
-I
35

15
a.speicher@be-arc hitects.fr
3 34 HA 8 e=30 (Inf)

3 34 HA 8 e=30 (Inf)

60
10 26 8 1.32 34.32 13.56
ST

Masse totale [kg] : 1379.51 2 1 BET G ENERA LIST E


12

WSP France S.A.S.


F

31 28 10 6.00 168.00 103.66


- IN

44 44 44 44 600 laurent.guyenot@ wsp.com


60

11 8 10 4.85 38.80 23.94 BP6 BP5 BP4 BET G ENERA LIST E LA BORA TO IRES SITE IDEEV ET ANIMALERIE
ST

485 66. CERIS Ingénierie


32 4 8 1.46 5.84 2.31
40

lc o@ceris-ingenierie.fr

15
12 60 8 1.28
57
76.80 30.34
Récapitulatif Boite D'attentes BET S PECIA LISE SERRE S E T CHA MBRE S DE CULTURE
HENSSLER
EXE jm .lobstein.henssler@ evc.net
15

33 24 10 5.00 120.00 74.04 E. dalle Hauteur Longueur (L)


500 BET RES TA URA TION

25 cm 17 cm 10.5 ml Entreprise Emettrice : Code affaire Entreprise : CONVERGENCE Ingénierie Conseil


olivier.delmas@ convergence-ing.com
108 34 4 10 1.27 5.08 3.13
13

13 40 8 2.48 99.20 39.18


As:+156.70 114 BET HQ E
10

As:+156.62
12

Ai:+156.45
Ai:+156.42
ETAMINE
25 CSP 14 laurene.r ouz ic @etam ine.coop
NF

As:+156.70 20 CSP
-I

10

Ai:+156.42 35 7 8 0.77 5.39 2.13


35

As:+156.70 86. BET S PECIA LISE ICP E


28 CSP 14 8 12 1.83 14.64 13.00 ANTEA
ST

14

Ai:+156.44
26 CSP
Treilleis Soudés IDEEV-BP6-FERRAILLAGE-PHT SS guy.monote@ anteagroup.com
10

Pièces Denom.TS Masse AMO A IDE A LA CO NCE PT IO N LABO RAT OIRES / ANIM ALERIE

15 40 8 0.33 13.20 5.21 65


ARMATURES INF+ COMPLEMENTAIRES-DALLES ELIX
36 12 10 1.40 16.80 10.37 hugues.brochard@elix.fr
10

1 Panneaux TS ST 25 43.49
12
SS-BP6
10

ÉCO NOMIST E

16 8 10 4.85 38.80 23.94 19 Panneaux TS ST 35 1101.62 ECO 80


485 g.cadieu@economie80.fr
40

40

40

40

37 36 10 1.00 36.00 22.21


100 22 Panneaux TS ST 50 1668.48
17 14 12 1.82 25.48 22.63
K 182

6 15 HA 8 e=25 (Inf) 8 11 HA 8 e=25 (Inf)


38 10 8 0.80 8.00 3.16 5 Panneaux TS ST 60 503.00
41 HA 8 e=25 (Inf) 2 21 HA 8 e=25 (Inf) 2 80
ECHELLE : 1/25
18 4 8 4.85 19.40 7.66
485 Masse total Brut 3316.59 FORMAT : A0
39 16 8 5.00 80.00 31.60
500
S.B.1 S.B.2 IDV EXE CTE GOE SS BP6 ARM 7645 C
19 4 8 4.85 19.40 7.66
485 SITE PHASE EMETTEUR LOT NIVEAU ZONE TYPE NUMERO INDICE
IDV_EXE_CTE_GOE_SS_BP6_ARM_7645_C : FICHIER
1 2 3

S-ar putea să vă placă și