Sunteți pe pagina 1din 1

SUMMARY KEBUTUHAN BETON, LEAN CONCRETE, DAN WIREMESH PROCESS BUILDING

PROYEK PABRIK BAJA MAJALENGKA

Volume
No Item Lean Concrete Beton Grouting Joint Sealent Floor Hardner Wiremesh Keterangan
m3 m3 m3 m kg m2 Lbr Kg

1 Pilecap
PC.1 38.99 580.80 - - - - -
PC.2 52.80 786.50 - - - - -
PC.3 5.69 84.70 - - - - -
PC.4 3.25 48.40 - - - - -
PC.5 1.22 18.15 - - - - -
PC.6 0.41 6.05 - - - - -
PC.7 2.05 28.80 - - - - -
2 Pedestal
P.PC.1 - 110.88 2.52 - - - -
P.PC.2 - 116.03 2.60 - - - -
P.PC.3 - 16.24 0.36 - - - -
P.PC.4 - 12.01 0.27 - - - -
P.PC.5 - 4.50 0.10 - - - -
P.PC.6 - 1.64 0.04 - - - -
P.PC.7 - 5.67 0.12 - - - -
3 Sloof
SF.1 25.52 204.18 - - - - -
SF.2 3.95 47.41 - - - - -
4 Slab 2,118.72 10,599.51 - 21,166.14 207,135.00 82,241.41 8,164.00 788,234.20 Spesifikasi Wiremesh U50 fy 490 Mpa;Es: 200.000 Mpa
(No Waste) Ukuran Waste 5.25 x 2 m tumpang satu kotak

Total Volume 2,252.58 12,671.47 6.02 21,166.14 207,135.00 82,241.41 8,164.00 788,234.20

S-ar putea să vă placă și