Submission form
Submission title

Category Project Individual Digital Innovation (select one)

Company / Business Unit /


IKEA-2 JAKARTA GARDEN CITY
Project
Submission summary
There is dynamic challenges in building IKEA-2 Jakarta Garden City in Indonesia particularly
with the complexity multi-disciplinary coordination, the quality and safety during construction
Maximum 60 words
and the very tight schedule for hand-overs. The team has to find ways to innovate to meet all
A brief overview of the challenges to ensure all has been built and installed within required quality, meeting safe
construction time line and making Client more engaged in a single platform which focus on
submission.
SOLUTIONS.

Full submission
BIM in IKEA-2 JGC is practically a proactive attitude towards innovation. We call it an
Maximum 400 words Attitude of thinking before doing. We did a scalable digital simulation of the real execution,
through Revit, Navisworks and synchro which enables us to virtually prepare and time to
Don’t forget to mention check everything to make necessary arrangements and changes to improve and optimize
how you have effectively time and effort. We did avoid the unnecessary expenses including potential time loss by
introduction of BIM review, whereby all Consultants, Engineers, Modellers and Contractor
implemented scalable digital
review the issues of clashes and corrections in one venue. In average Client with it's
design, construction techniques
consultants reply RFI with an average of 8 replies per month, but with the BIM review it has
and information processes. You improve the closing of issues and concern by 200%! Which in turn improve our interaction
should clearly demonstrate how and motivation in solving problems before it happens on site.
this has added value in areas
such as cost, time, quality, health We have digitized the process for IKEA-2 JGC building paving the way of implementing bill
& safety, sustainability and of quantities, the time schedule, the cost estimation as well creating a 3D database (share
stakeholder engagement. point) containing the integrated model of the totality of the building itself. And with the use of
BIM360 every information linked in a single 3D model, the integrated model information can
easily be tracked by a simple APP on smart phones and on tablet while on the move. With
this innovative approach we've increased the productivity by at least 35% of saving time.
9304/03/2019
Digital Construction 2019
International Awards

Submission form

Image 1 caption
IKEA-2 Integrated 3D Model_Seqeuncial Construction
(Please attach image files to email)

Image 2 caption
IKEA-2 JAKARTA GARDEN CITY PROJECT_Actual progress on Beam and Hollow Core construction and ins
(Please attach image files to email)

Link to video(s) / vlog

Entry criteria and rules

• The summary must not exceed 60 words.

• The full submission text should not exceed 400 words.

• Your head of business unit / division should support your entry.

• Please seek client approval where necessary prior to submitting.

• Entries must be submitted to intdigitalconstruction@bam.com by 15 September 2019.


9304/03/2019

Click here to prepare email

S-ar putea să vă placă și