WORK REPORT ORDER


ACB ETU G2 GRESIK SEWATAMA PROJECT

ln Thursday, daie ofnineteen Septembertwo thousand nineteen, (1gtr-09-2019)atPTLinde


Gresik Gas Engine l\,,lwl\il number 2, a job task has been done for ETU problem in GCP2 .

1 . There is no changing in parameter setpoint and delay time ETU Protection


2. LT Long Term means overload protecctions
3. lmax means cufent with phase higest load L1,L2,L3
4. The support ETU of screw connecction found broken and akeady fix with OlVl using cable iies
5. The ACB already enegize with passed for load 1000kW and current 1804A the ETU stillin normal
condition works well

According to what we found, we suggest some of vibration make some ol ETU sensing cufienl
disturb, afler we fix with using cable ties the ETU ACB works well after observalion in t hour for 1000kW.
Therefore this work task has completed according to the requirement of ETU observaiion.

PT Technical South Easi Asia Site Supervisor


Muhammad FajarArman

<s-
&
( 19 - 09 - 2019)
c^r*
( 19 - 09 - 2019)