Dear sir,
Please see the trailing mail and kindly provide water as per TOP given by mecon
Regards
Ni n V Joshi
DGM I/c (Proj-Steel Zone)
Mob: 9407980799
SAIL/ Bhilai Steel Plant
Dear Sir,
As desired, please find the trailing email indicating TOP of water for propane storage and handling system.
Regards
Nitin Kalamkar
Manager (FSPD)
MECON Bhilai
mail.meconlimited.co.in/TyHtmPreviewMail.jsp 1/3
9/23/2019 meconlimited.co.in User : aktripathi@meconlimited.co.in
Dear Sir,
The TOP of water as X+5373 & Y+8900 already informed to OGPE for submission of drawing.This is for your
information.
Regards
Nitin Kalamkar
MECON Bhilai
With reference to trailing email, please note that as per Technical Specifica on of package 078A (Balance Work for MW& DW
System), drinking Water TOP (2m3/hr) for package 032, " Propen Storage & Handling System" has been envisaged at 100m
from coordinate X+5373 / Y+8922. In view of the same the drinking water coordinate proposed by BSP & OGPE i.e. X+5373 &
Y+8900 is acceptable.
D Sharma
SDE
FSPD Sec on
Dear Sir,
mail.meconlimited.co.in/TyHtmPreviewMail.jsp 2/3
9/23/2019 meconlimited.co.in User : aktripathi@meconlimited.co.in
This has reference to trailing email dated 16.05.2017 regarding TOP of water as X+5373.00 & Y+8900.00. Please
confirm the same at the earliest.
Regards
Nitin Kalamkar
MECON Bhilai
From: nitinkalamkar@meconlimited.co.in
Date: Tue, May 16, 2017 13:02
To: "akhileshksinha akhileshksinha"
"bindug gurung"
"devendrasharma devendrasharma"
Cc: "nkgarg nkgarg"
------------------------------------------------------------------------------------------------------------
Dear Sir,
This has reference to the discussion with BSP & OGPE for TOP of water. The coordinate for TOP of water is
X+5373.00 & Y+8900.00. Please confirm the same at the earliest.
Regards
Nitin Kalamkar