Sunteți pe pagina 1din 46

engenuiti

IMAGINE + CREATE + ENGINEER

ADVANCED TIMBER STRUCTURES


engenuiti
IMAGINE + CREATE + ENGINEER

INTRODUCTION ENGINEERED TIMBER FURNESS ACADEMY


ABOUT US TYPES OF ENGINEERED TIMBER TIMBER AS STRUCTURE
DARING TO THINK DIFFERENTLY CLT – MAKING THE PRODUCT TIMBER / STEEL HYBRID FORMS
OUR JOURNEY IN TIMBER CLT – MANUFACTURERS & CONTRACTORS LEVEL 2 BIM FOR COORDINATION
PERCEPTIONS OF TIMBER CONSTRUCTION ? CLT – ADVANTAGES & OPPORTUNITIES
CLT – WATCH OUT FOR…
PROCUREMENT

WENLOCK ROAD BSKYB OFFICES TIMBER FUTURES


TEN STOREYS RESIDENTIAL TOWER MAJOR OFFICE DEVELOPMENT MAJOR RESIDENTIAL SCHEMES
HYBRID FORMS GLULAM AND CLT SCHEME HOW HIGH CAN WE GO?
OFFICE DEVELOPMENTS
INDUSTRY RESEARCH
engenuiti
IMAGINE + CREATE + ENGINEER

INTRODUCTION
ABOUT US
DARING TO THINK DIFFERENTLY
OUR JOURNEY IN TIMBER
PERCEPTIONS OF TIMBER CONSTRUCTION ?
engenuiti
INTRODUCTION IMAGINE + CREATE + ENGINEER
engenuiti
INTRODUCTION IMAGINE + CREATE + ENGINEER
engenuiti
INTRODUCTION IMAGINE + CREATE + ENGINEER

Perceptions of Timber Construction?

Architectural / Bespoke / Expensive / Green-wash / Fire / Insurances


engenuiti
INTRODUCTION IMAGINE + CREATE + ENGINEER

Perceptions of Timber Construction?

Structural / Modular / Fast-Build / Cost Efficient / Fire Resistant / Normal


ENGINEERED TIMBER
TYPES OF ENGINEERED TIMBER
CLT – MAKING THE PRODUCT
CLT – MANUFACTURERS & CONTRACTORS
CLT – ADVANTAGES & OPPORTUNITIES
CLT – WATCH OUT FOR…
PROCUREMENT
engenuiti
ENGINEERED TIMBER IMAGINE + CREATE + ENGINEER

Types of Engineered Timber

• Glue Laminated Timber (Glulam)

• Laminated Veneer Lumber (LVL)

• Stressed Skin Cassettes

• Cross Laminated Timber (CLT)

• Composite & Hybrid Products

• CLT has created new possibilities


engenuiti
ENGINEERED TIMBER IMAGINE + CREATE + ENGINEER

CLT – Making The Product


engenuiti
ENGINEERED TIMBER IMAGINE + CREATE + ENGINEER

CLT – Manufacturers & Contractors

Approx 12 CLT Panel Manufacturers (Europe)

6 ‘Major’ Manufacturers:

• Stora Enso 700,000 m2


• KLH 500,000 m2
• Binderholz 400,000 m2
• Mayr Melnhof-Kaufmann 300,000 m2
• Merk Finnforest 200,000 m2
• Schilliger 200,000 m2

Specialist Contractors (UK)

• KLH
• Eurban
• B&K Structures
• Constructional Timber
engenuiti
ENGINEERED TIMBER IMAGINE + CREATE + ENGINEER

CLT - Advantages & Opportunities


Airtightness Embodied carbon
• CLT structures typically offer higher levels of • A typical CLT structure will require significantly less
airtightness than traditional construction energy to manufacture than a steel or concrete
(Passivhaus approach). building.
• For every 1000m2 of building built in CLT instead of
Quality steel or concrete, up to 350t of CO2 is saved/stored
• Surface grade finish of boards can be specified for (this could represent up to 10 years of operational
exposed finish. CO2 emissions).

Services Installation
• CLT forms a easy surface to fix to and services
installation is likely to be quicker when compared to
conventional construction.

Secondary Structure
• Secondary framing or brackets are virtually
eliminated in CLT structures.
engenuiti
ENGINEERED TIMBER IMAGINE + CREATE + ENGINEER

CLT - Advantages & Opportunities


Programme Roof
• To optimise programme advantage maximise • A simple CLT roof profile also aids an early watertight
repetition and adopt rectilinear forms. date (slight falls if possible).
• Early weathertight date allows ‘vertically stacked’
programme (follow-on trades). Foundations
• Shallow strip foundations are more likely possible if a
Arrangements and Spans load bearing wall structure is adopted.
• Plan with 2.5m heights where possible (up to
2.95m possible but transport cost increases). Waste
• Limit spans to 7.5m where possible (greater spans • You pay for holes, plan board layouts to suit opening
>230mm thick panels). where possible.
• Construction waste associated with the structure is
Loadbearing facade virtually zero
• Use loadbearing CLT façade structure, preferably
with a punched window approach.
• Windows are pre-ordered as CLT tolerances are
high.
engenuiti
ENGINEERED TIMBER IMAGINE + CREATE + ENGINEER

CLT - Watch Out For…


Design Responsibility Exposed Finishes
• Engineers should design CLT • Early attention to details required (fixings)
• Knowledge/understanding CLT supply chain • Board grade (cost allowance for upgrade)
(design using standard panel sizes) • Staining (rain + UV)
• Drying shrinkage (gradual commissioning of building
Building Services heating system)
• Early and detailed design coordination is required
(prior to panel fabrication). Fire
• Fire engineered approach - exposed CLT panels can
Acoustics be engineered for 1hr fire resistance.
• Strategy should be deturmined at early design • Exposed CLT will require a spread of flame
stage. treatment (UK).

Floor Vibration Cost Comparison


• Determine design limits for intended use (e.g. 8Hz • Not just capital cost of frame – consider additional
natural frequency) inherent benefits of CLT ie programme, foundations,
façade, secondary structure, wet trades etc
Thermal mass • Knowledge of benchmark cost data of CLT
• CLT has less thermal mass than exposed concrete structures: £/m2 GIFA, £/m3 CLT
soffits (nat vent)
engenuiti
ENGINEERED TIMBER IMAGINE + CREATE + ENGINEER

Procurement – UK Current Model

Designer / Engineer Specialist Contractor Timber Manufacturer

• Detail Design • Contract Management • Fabrication Drawings


• Element Layout • Erection Sequence • Manufacture
• Connection Design • Loading Sequence • Cutting Patterns
• Construction BIM Model • Erection • Fabrication
• Construction Drawings • Transport

Designer / Engineer

• Concept Design
• Coordination Engineering Expertise does not get
worked into concept / scheme design
stages

Client
engenuiti
IMAGINE + CREATE + ENGINEER

FURNESS ACADEMY
TIMBER AS STRUCTURE
TIMBER / STEEL HYBRID FORMS
LEVEL 2 BIM FOR COORDINATION
engenuiti
FURNESS ACADEMY IMAGINE + CREATE + ENGINEER

Client: Kier Major Projects / B&K Structures


Architect: Halliday Clark Architects
Value: £23m
Status: Complete 2013 • Original CLT / Glulam scheme too expensive

Furness Academy is a new build facility that brings • Proposal for CLT / Steel Hybrid made scheme
together two existing schools on to a state-of-the-art
new campus. The Academy specialises in an arts- viable
based curriculum and the design has focused on
these aspects. The building features teaching • Move from timber as architecture to timber as
faculties in flexible spaces, including TV studios and
structural frame
dance studios.

The project is the largest Cross Laminated Timber • Level 2 BIM led by engenuiti for coordination
(CLT)school in the UK to date. The design features a
hybrid steel / CLT frame in long-span areas to
produce the most efficient design.

The project exposes the visual quality of the material


in specialist use spaces such as the sports hall and
assembly halls. In these areas, double-height walls
are combined with glulam or steelwork to create light
and flexible facilities for the school.
engenuiti
FURNESS ACADEMY IMAGINE + CREATE + ENGINEER
engenuiti
FURNESS ACADEMY IMAGINE + CREATE + ENGINEER
engenuiti
FURNESS ACADEMY IMAGINE + CREATE + ENGINEER
engenuiti
FURNESS ACADEMY IMAGINE + CREATE + ENGINEER
engenuiti
FURNESS ACADEMY IMAGINE + CREATE + ENGINEER
engenuiti
IMAGINE + CREATE + ENGINEER

WENLOCK ROAD
TEN STOREYS RESIDENTIAL TOWER
HYBRID FORMS
engenuiti
WENLOCK ROAD IMAGINE + CREATE + ENGINEER

Client: Kier Major Projects / B&K Structures


Architect: Halliday Clark Architects
Value: £23m
Status: Complete 2013 • Architectural concept too complicated for CLT
only scheme
Furness Academy is a new build facility that brings
together two existing schools on to a state-of-the-art
new campus. The Academy specialises in an arts- • Proposal for CLT / Steel Hybrid made scheme
based curriculum and the design has focused on viable
these aspects. The building features teaching
faculties in flexible spaces, including TV studios and
dance studios.

The project is the largest Cross Laminated Timber


(CLT)school in the UK to date. The design features a
hybrid steel / CLT frame in long-span areas to
produce the most efficient design.

The project exposes the visual quality of the material


in specialist use spaces such as the sports hall and
assembly halls. In these areas, double-height walls
are combined with glulam or steelwork to create light
and flexible facilities for the school.
engenuiti
WENLOCK ROAD IMAGINE + CREATE + ENGINEER
engenuiti
WENLOCK ROAD IMAGINE + CREATE + ENGINEER
engenuiti
WENLOCK ROAD IMAGINE + CREATE + ENGINEER
engenuiti
WENLOCK ROAD IMAGINE + CREATE + ENGINEER
engenuiti
IMAGINE + CREATE + ENGINEER

BSKYB OFFICES
MAJOR OFFICE DEVELOPMENT
GLULAM AND CLT SCHEME
engenuiti
BSKYB OFFICES IMAGINE + CREATE + ENGINEER
engenuiti
BSKYB OFFICES IMAGINE + CREATE + ENGINEER
engenuiti
BSKYB OFFICES IMAGINE + CREATE + ENGINEER
engenuiti
BSKYB OFFICES IMAGINE + CREATE + ENGINEER
engenuiti
IMAGINE + CREATE + ENGINEER

TIMBER FUTURES
MAJOR RESIDENTIAL SCHEMES
HOW HIGH CAN WE GO?
OFFICE DEVELOPMENTS
INDUSTRY RESEARCH
engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER
engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER
engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER

34 Storey Tower – Berg / CF Moller Architects


engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER

20-30 Storey Tower – MGB Architects, Canada


engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER

20-30 Storey Tower – MGB Architects, Canada


engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER

14 Storey, 20,000m2 Residential Development, St Petersburg, Russia – Engenuiti


engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER
engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER
engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER
engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER
engenuiti
TIMBER FUTURES IMAGINE + CREATE + ENGINEER
engenuiti
IMAGINE + CREATE + ENGINEER

engenuiti.com
Visit our on-going journey in thinking + research + materials + form + design

S-ar putea să vă placă și