Sunteți pe pagina 1din 6

BOQ CIVIL WORKS ( Additional work )

Project : PLTMG Teluk Lobam


Sales Contrac No. : RENTAL
Gas Engine Type : 3 X J 620 GS-N.L ENCLOSURE
Location : bintan
Drawing :

ROOFING ENGINE ENCLOSURE ( MODIFICATION )


DESCRIPTION
NO
ITEM
1 Preparation-3 Unit
- Cleaning & Coating for Roof top Sandwith panel

TOTAL for preparation


2 ROOFING ENGINE ENCLOSURE - 3 Unit
Modification Enclosure Steel Structure Hasta-
Include dismantle,modification and Instalation
- Frame ,Gratting Support WF 100x50x15000mm
- Gratting enclosure
Making Hole on for water on UNP150
CENTER ROOFING ENGINE ENCLOSURE
Size 15000 X 4800
- Frame , Rafter C 75 - thk 1mm X 6 Mtr
- Purlin R 30 X 20 - thk 0.7 mm X 6 Mtr
- Roof Zinkallum ( Spandec ) 0,3 mm
- Ridcapping ( Rabung ) - W 50 Cm thk 0.3 mm
- Installs
SIDE ROOFING ENGINE ENCLOSURE
Size 15000 X 500
- Frame , Hollow 40x20x1mm -6mtr/batang
- Purlin R 30 X 20 - thk 0.7 mm X 6 Mtr
- Roof Zinkallum ( Spandec ) 0,3 mm
- Ridcapping ( Rabung ) - W 50 Cm thk 0.3 mm
- Installs
TOTAL for preparation
TOTAL COST OF ROOFING IMPROVEMENT WORKS
2
N UNIT PRICE
UNIT QTY
SPECIFICATION MAT'L (Rp).

By Nodrop m2 63.00

Sub - Total / Unit


aration UNIT 3.00

60 Pcs 2.00 MPI


2707 LOT 1.00 MPI
1 Lot 1.00 MPI

BAJA RINGAN
No need Bracing Pcs 18.00
Pcs 30.00
Colour Natural m2 72.00
Colour Natural m' 32.00
Include Bolts , Sealent + Rivet Lot 1.00

BAJA RINGAN
No need Bracing Pcs 3.00
Pcs 10.00
Colour Natural m2 14.40
Colour Natural m' 10.67
Include Bolts , Sealent + Rivet Lot 1.00
Sub - Total / Unit
aration UNIT 3.00
PROVEMENT WORKS
Date - 23 aug 2019
UNIT PRICE TOTAL PRICE TOTAL PRICE
TOTAL
LABOUR (Rp). MAT'L (Rp). LABOUR (Rp).

- - -

- - -
- - -

- - -
- - -
- - -

X - - -
X - - -
X - - -
X - - -
- - -

X - -
X - -
X - -
X - -
- - -
- - -
- - -
#REF! #REF! #REF!