Attach to this form a list of all staff who participated in the drill, and any visitors participating.
Time Alarm Sounded: 9.45 am Time Drill Concluded: 10.00 am Time to Evacuate:
(fire evacuation drills only)
Yes Yes
No No
Prepared By Approved By
Page 1 of
3
FSTL Managing Director
Situation:
325KVA DG set failure due to non-function of main panel at 2.00pm & the same be informed to General Manage by Incharge
Maintenance. Effected total plant production and milk despatches are delayed.
Root Cause:
Immediately run the 125 KVA DG set and connection given to emergency production blocks to complete the milk batches
and packing.
Also delay in reaching AMC person to the plant, which is supposed to start from Bangalore.
Corrective Action:
Immediately contact with APSEB AE and requested to continue 3 phase power line to the plant. AE informed to near sub-
station In-charge & they reinstated the power to the plant next day at 10.00am and it continues upto rectification of
problem. All the issues are closed by replacing the Main panel part by supplier on 29th Oct’14 at 12.00noon.
Verification of Effectiveness:
GM instructed Maintenance Incharge for regular checkup of 325 KVA DG set & maintenance of good relations with supplier.