Subject Goals
Contract Management
1
To be able to define the project scope, organisation
To identify the Consultants office/ RE/ Contractor's camp
To identify key installations
To identify quantity requirements
To perform general cost estimate
To be familirarised with components of producing a work plan
To be familiarised with project schedule - concepts and methods
To perform risk management
To perform project control
4 Survey
to perform basic setting out of ongoing works
to perform advance setting out where necessary
to confirm as built results
to perform general survey calculations
MOMBASA PORT AREA ROAD DEVELOPMENT TRAINING CURRICULUM
6 Structure/Drainage
To familiarise with hydraulic/hydrologic considerations for culverts, box and bridge
To identify the different types of structures on the project site
To familiriase with the planning and design process used to select the structures on site
To familiarise with material ,loads and design safety used on site
To determine suitability of the foundation
To familiarise with the different types of concrete systems to deal with tension(reinforced concrete and
prestressed)
To familiarise basic foundation/ piling / sheeting calculations for identified box on project road
To familiariset basic reinforced concrete box calculations: pier/ abutment / deck
To familiarise basic foundation calculations for identified bridge on project road
To familiarise with basic reinforced concrete bridge calculations: pier/ abutment / deck
To familiarise with basic prestressed deck bridge calculations:
To draft and detail sample pier/ deck/ abutment structural steel details
To draft and detail sample pier/ deck/ abutment reinforcement details
Note
1 Work Hours
Normal Working hours shall be as follows:
Weekdays: Morning-8a.m to 1a.m- Afternoon -2a.m to 5p.m
Saturdays: 8a.m to 1 a.m
Application for day offs/leave should be made to the MFO
a Office
The trainee shall accompany the senior engineer during inspection of site
b Site
The trainee shall work with the RE's staff and use the RE vehicles during site inspection
c Outside work hours
MOMBASA PORT AREA ROAD DEVELOPMENT TRAINING CURRICULUM
The trainee shall not be permitted use of a project vehicle outside work hours unless in the presence of a senior engineer
Week of Training Time taken location Graduate/Student Graduate Responsibility
Eng 1
3 Materials
Eng 2
Eng 1
4 Survey
Eng 2
Eng 1
5 Highway
Eng 2
Eng 1
6 Structure
Eng 2