1 PIDO/V/XIII/2567/85 Improvement to TS canal 5th and 6th mile

PIDO/IV/10/103/79
2 MVIP Design of head regulator on RBC of Malankara Dam
PIDO/IV/10/104/81

IDRB/DD/CD/CL/AD3/887/87 Improvement to AC canal- protecting the canal sides of colony


3
(Back file PIDO/V/XIII/2376/85 east of Kidangara Ferry

Constructing a foot bridge across a new cut connect Keeranalloor


4 IDRB/DD/CD/CL/AD3/1044/87
and pooraparambu river

5 IDRB/DD/CD/CL/AD3/1612/87 Providing lining with cement concrete for canal works

IDRB/DD/CD/CL/AD3/1712/87
6 Attappady Irrigation Project -Design of canal sluice
(Back file PIDO/ IV/8/107/80

Idamalayar Irrigation Project Constructing Head Regulator cum


7 IDRB/DD/CD/CL/AD3/3623/89
bridge at Bhoothathankettu.

8 IDRB/DD/CD/CL/AD3/125/88 Information regarding stability of canal embankments.

MVIP- Constructing LBMC from ch. 3264m to 3500m and from


9 IDRB/DD/CD/CL/AD3/820/90
4350 to4525m Design of single lane bridge and foot bridge.

PVIP - Rectification and strengthening of damaged UT at ch. 3470


10 IDRB/DD/CD/CL/AD3/1085/90
m of Varapuzha branch canal

11 IDRB/DD/CD/CL/AD3/275/92 Construction of foot bridge/reconstruction of thottapally bridge

MVIP - LBMC Providing surplus escape at ch. 16500m at


12 IDRB/DD/CD/CL/AD3/3700/92
Parakkadavu
IDRB/DD/CD/CL/AD3/364/93 MVIP - RBC Head Regulator and LBC - Head Regulator Model
13
(back file PIDO/IV/12/104/83 study (Further done on 7/83)

MVIP - Constructing Ramamangalam branch canal from ch. 0m to


14 IDRB/DD/CD/CL/827/93
45m including Head Regulator Design regarding

15 IDRB/DD/CD/CL/AD3/926/94 MVIP - Koothattukulam distributory preliminary Investigation report

PVIP -Constructing Thiruvankulam MD from ch. 6400m to 6595m


16 IDRB/DD/CD/CL/AD3/2504/94
construction of an aqueduct.

Charge Handed Over Taken Charge


1
LEKHA B S NIDHI S
Sl
No. File No. File Name

MVIP LBMC Ettumannor Branch canal Hydraulic particulars from


17 IDRB/DD/CD/CL/AD3/3171/94
ch. 0m to 4300m approval .

MVIP LBMC from ch. 34810m to 35500m construction of aqueduct


18 IDRB/DD/CD/CS/AD2/1849/94
from ch. 35235m to 35340m ( Orginal chainage)

MVIP- Distributory to Ayacut under Palakuzha village with lift


19 IDRB/DD/CD/CL/AD3/2610/93
proposal to serve additional ayacut

MVIP Constructing flush escape at ch. 680m of Ettumanoor Branch


20 IDRB/DD/CS/AD1/1129/2000
canal.

21 IDRB/DD/CD/CL/AD3/1931/2001 PVIP- CD Works at Thonnalur MD at ch. 6103m to 6203m

22 IDRB/DD/CD/CL/AD3/2429/2002 MVIP Palakuzha MD syphon aqueduct from ch. 1555m to 1959m

PVIP Protective work to the left bank of periyar river d/s of barrage
23 IDRB/ DD/CD/CL/AD3/1741/2002
at Bhoothathannkettu ch. 0 to 180 m

IIP:- Main canal construction of an aqueduct from ch.24118m to


24 IDRB/ DTE/DM/GL3/AD1/1067/99
ch. 24386m

IIP:- Main canal construction of an aqueduct from ch.9325m to ch.


25 IDRB/ DD/CD/CL/AD3/3596/98
9415m

BSP:- Padinjarathara branch canal construction of aqueduct from


26 IDRB/ DD/CD/CS/AD1/2038/04
ch.20m to 1670 m(on going)

BSP:- Padinjarathara branch canal construction of aqueduct from


27 IDRB/ DD/CD/CL/AD3/2032/04
ch.4030m to 6150 m

IIP:- Construction of main canal from ch.30510 m to 30825m


28 IDRB/ DD/CD/CL/AD3/2255/06
including aqueduct from ch.30563m to 30793m(flush escape)

MVIP:- Constructing Mulakkulam branch canal from ch. 5650m to


29 IDRB/ DD/CD/CL/AD3/1432 6070 m including cut & cover and CD works(file returned with
original)
MVIP:- Constructing Karikkodu distributory from ch 0 to .11390m
30 IDRB/ DD/CD/CL/AD3/2475/08 including CD works re-aligning and re- working of estimate
(Design of hydraulic particulars)

BSP:- Hydraulic particulars for the main canal from ch.100m to


31 IDRB/ DD/CD/CL/AD3/5148/97
2730m.

Charge Handed Over Taken Charge


2
LEKHA B S NIDHI S
Sl
No. File No. File Name

MVIP:- Constructing uppukandam minor distributory approval from


32 IDRB/ DD/CD/CL/AD3/692/2009
IDRB -(Design of hydraulic particulars)

MVIP:- Constructing Anicadu East Minor distributory from ch.0m


33 IDRB/ DD/CD/CL/AD3/1273/2009 to 1855 m including CD works(Design of flume between ch.103m
to 110m,ch.115m to 412m and 831 m to 948m)
MVIP:- Constructing Ambalamkunnu Devamathakunnu from ch 0
to 3650m including regulator,cut & cover and CD works(Design of
34 IDRB/ DD/CD/CL/AD3/1274/2009
cut &cover between ch.14m to 235m,ch.3085 m to 3145 m and
3320m to 3525m.

MVIP:- Constructing Madakkathanam distributory from ch. 0 to


35 IDRB/ DD/CD/CL/AD3/1324/2009 3765m including flume,cut &cover and CD works(Design of cut &
cover between ch. 0 to 100 m and ch.2652 to 2825m.)

MVIP:- Kakkad MD constructing an aqueduct between ch.835m to


36 IDRB/ DTE/TE(Gl)/AD2/2526/98
1066 m including open flume design

37 IDRB/ DD/CD/CS/AD3/1523/99 IIP:-Constructing aqueduct from ch. 15230m to 15700m in LLC.

KIP:-RBC-Formation of Kayamkulam branch canal from ch.2278m


38 IDRB/ DD/CD/CL/AD3/293/1998
to 2820m including CD works.

39 IDRB/ DD/CD/CL/AD3/3938/09 Pambar Basin - Chengara Irrigation scheme (Water requirement)

Pambar Basin Kottakomboor Irrigation Projects in Vattavada


40 IDRB/ DD/CD/CL/AD3/633/09
scheme (Water requirement)

MIRPA-Construction of a VCB cum bridge across


41 IDRB/ DD/CD/CL/AD3/3066/09 Cherupuzhathodu at Neeleswaram ravaramana in Angadippuram
panchayath

NABARD -RIDF XIII-Construction of Checkdam across Mayangal


42 IDRB/DD/CD/MFA/AD3/1807/2010
thodu at Mayangal in Mananthavady Panchayath.

IIP-Constructing LLC from ch.7300m to ch.7800m, Design of


43 IDRB/DD/CD/CL/AD3/1146/2011
covered flume from ch.7517.5m to ch.7535m

MVIP Constructing surplus escape including Head Regulator and


44 IDRB/DD/DS/SM/AD2/5121/97 cross regulator at the outlet of Mannathur aqueduct near ch. 25016
m of LBMC

Construction of weir across Kadalundi river at Thayyilkadavu -


45 2820/2012/IDRB/CL
Nedugad in Oorakam Panchayath.

Construction of VCB cum bridge across Pallathadka river


46 907/2013/IDRB/CL
Kaduppamkuzhi in Badiadka Panchayath

Charge Handed Over Taken Charge


3
LEKHA B S NIDHI S
Sl
No. File No. File Name

Construction of Road bridge with foot path across Badagara Mahe


47 3784/2013/IDRB/CL
canal at Kalleri

CS-AD11/2/2015-IDRB KKIP-Moolathara Right Bank canal -Extension of canal from


48
4526/2013/IDRB/CL Korayar to Varatayar
Construction to Ch. Kadalundi
of weir across 15957 to 22097
river near Anappara -
Pottammal Kadavu in Kootilangadi Panchayath
49 4922/2013/IDRB/CL

Construction of Check dam near Perumbuzhakadavu in Thennala


50 2272/2014/IDRB/CL
Edarikkode and Vengara Panchayath
Construction of a Check dam across Kadalundi river at d/s of
51 2673/2014/IDRB/CL Oruvamburam bridge in Pandikkad Panchayath in Malappuram
District
Construction of VCB cum bridge across Punnapuzha at
52 5341/2014/IDRB/CL
Arumpulikkal in Chungathara Panchayath.

Consruction of VCB cum bridge across Cherupuzha at


53 3988/2014/IDRB/CL
Kuzhinakkippara in Urangathiri Panchayath.

Construction of checkdam at Meenja Pattathur in Meenja Grama


54 4141/2014/IDRB/CL
Panchayath in Kasaragod district

Construction of Checkdam cum Tractorway across Kothamangalam


55 CS - AD11/1/2015 -IDRB
river at Paratharakandom in varappady Panchayath.

CSIN - Construction of Road Bridge with footpath across Badakara


56 No. CS - AD11/3/2016 -IDRB
Mahe canal at Kanninada - Design .

Charge Handed Over Taken Charge


4
LEKHA B S NIDHI S
Sl
No. File No. File Name

Construction of Left Bank canal Shutter of Moolathara Design of


81 CS/AD9/3/2015
Wheel gates-Design approval

Charge Handed Over Taken Charge


5
LEKHA B S NIDHI S
Sl
No. File No. File Name

Construction of Regulator cum Bridge at kankakkadavu across


82 CS/AD9/4/2016 IDRB
Bharathapuzha in Kuttipuram Panchayath- Design Approval

MRVP - Construction of checkdam cum Bridge across Meenachil


83 CS/AD9/2/2017 IDRB river (Kalathukadavu) at Chillachibhagam in Thalappalam of
Moonnilavu Panchayath - Design approval

Peechi scheme - Re-alignment of Diversion canal from Kainoor


84 CS/AD9/1/2017 IDRB
Chira- proposal returned.

Chithupizha Project-Enhancement of storage Capacity- Digging of


85 CS/AD9/4/2017 IDRB Kambalathara Venkalakayam and Kunnampidari - file transfered to
investigation

Protecting erroded bank of Therlai island from Madhariveedu


86 CS/AD9/5/2017 IDRB kadavu to Valliyakunnu Kadavu & from Moideen Pallu Kadavu to
Therlayi Bridge

Reconstruction of box culvert at Ambanattuchira road near


87 CS/AD9/585/2018 IDRB
Chilavanoor in Ernakulam District- Design Approval

Construction of a weir across Thootha river at Kalikkadavu in


88 CS/AD10/2/2016 IDRB Aliparambu Panchayat in Malappuram District Transfered from
AD10 - Design Approval.

DRIP Rehabilitation and improvement of Barie facilities of


89 CS/AD9/1346/2018 IDRB
Moolathara Regulator - reg -Design approval

LLC aqueduct at ch: 3740m - installation of valve from Idamalayar


90 CS/AD9/675/2018 IDRB
Irrigation Project canal to Komarappadam branch canal

KIFBI-Construction of checkdam across Ithikkarayar at


mannayamkadavu for supplying water to Kalluvathukkal,Parippally
91 CS/AD9/584/2018 IDRB
and Velinalloor villages under samagrakudivellapadhathi reg. (File
transferred to MFA - AD3)

Construction of a weir across Kadalundi river near vattanikadavu


92 CS/AD9/1/2017 IDRB
(Irumbuzhi) in Kootilangadu Panchayath in Malappuram District

Construction of checkdam cum bridge across panathur river at


93 CS/AD9/3/2017 IDRB
Kaneeladukkam in Kallar Panchayath.

Charge Handed Over Taken Charge


6
LEKHA B S NIDHI S
Sl
No. File No. File Name

Construction of a vented weir cum bridge across Panathur river ar


94 CS/AD9/645/2018/ IDRB Chirakadavu at Panathady Panchayath - file tranfered to AD10
canals

95 No.1593/2015/AD1/CL/IDRB KIP- Construction of syphon at 165 m in Kollaka Distributory reg.

96 No.1536/2013/IDRB/CL/BSP BSP Note File

IIP - Construction of LLC from Ch 10490 - 12000 m including CD


97 No. CS-AD9/2/2015-IDRB
works

Construction of checkdam cum bridge at vallakadavu Pareekkanni


98 No. 2777/2014/ IDRB /CL connecting Kavalangad and pullarimangalam Panchayath in
Ernakulam District

Construction of check dam at Mannathikadavu across Thoothapuzha


99 CS-AD9/1897/2018/IDRB
at Cherpulassery Muncipalty in Palakkad District

IDRB/DD/CD/CL/AD1/730/2002 IIP - LLC Construction of cut & cover from ch 10490m to 10599m
100
Vol II including MC road crossing and allied works ( Through EPC)

IDRB/DD/CD/CL/AD1/1235/88
101 Hydraulic Particulars of Attappady Valley Irrigation Project
( Volume II)

Charge Handed Over Taken Charge


7
LEKHA B S NIDHI S
PIDO/IV/10/104/81

(Back file PIDO/V/XIII/2376/85

Charge Handed Over Taken Charge


8
LEKHA B S NIDHI S
LIST OF FILES (AD1/CANALS)

Old Ref. Sl No. File No.

4 1 IDRB/DD/CD/CL/AD1/1830/89
5 2 IDRB/DD/CD/CL/AD1/1235/88

6 3 IDRB/DD/CD/CL/AD1/654/88
7 4 IDRB/DD/CD/CL/AD1/2657/89

8 5 IDRB/DD/CD/CL/AD1/2657/89
9 6 IDRB/DD/CD/CL/AD1/457/87
10 7 IDRB/DD/CD/CL/AD1/3807/89

16 8 IDRB/DD/CD/CL/AD1/1046/90

17 9 IDRB/DD/CD/CL/AD1/149/87

18 10 IDRB/DD/CD/CL/AD1/283/87

19 11 PIDO/IV/10/113/79

20 12 PDN V - 40577/76

21 13 PDN V - 40577/76

22 14 PIDO/IV/10/111/79

23 15 PIDO/IV/10/113/79
24 16 W5-12321/84
25 17 PIDO/IV/11/1110/85

26 18 PIDO/111/8/115/80

27 19 PIDO/IV/10/113/79

28 20 IDRB/DD/CD/CL/AD1/227/87

29 21 IDRB/DD/CD/CL/AD1/1417/92

29 a 22 IDRB/DD/CD/CL/AD1/1417/94

30 23 IDRB/DD/CD/CL/AD1/2516/92
30a 24 IDRB/DD/CD/CL/AD1/2516/92

30b 25 IDRB/DD/CD/CL/AD1/2516/94

31 26 IDRB/DD/CD/CL/AD1/2006/89

32 27 IDRB/DD/CD/CL/AD1/3003/96

IDRB/DD/CD/CL/AD1/3003/96 - Part
33 28 file No-1

34 29 IDRB/DD/CD/CL/AD1/110/88

35 30 IDRB/DD/CD/CL/AD1/135/98
IDRB/DD/CD/CL/AD1/2516/94 (part
36 31 file -II)

37 32 IDRB/DD/CD/CL/AD1/1278

38 33 IDRB/DD/CD/CL/AD1/1750

39 34 IDRB/DD/CD/CL/AD1/3503/96

40 35 IDRB/DD/CD/CL/AD1/1436

32 IDRB/DD/CD/CL/AD1/1436

41 33 IDRB/DD/CD/CL/AD1/2085/97

34

43 35 IDRB/DD/CD/CL/AD1/449/96

44 36 IDRB/DD/CD/CL/AD1/1778/95

45 37 IDRB/DD/CD/CL/AD1/49/98

46 38 IDRB/DD/CD/CL/AD1/49/98-part-I

47 39 IDRB/DD/CD/CL/AD1/730/2002
40 IDRB/DD/CD/CL/AD1/1778/95 VOI-II
41 IDRB/DD/CD/CL/AD1/1184/2004

42 IDRB/DD/CD/CL/AD1/1530/2004

51 43 IDRB/DD/CD/CL/AD1/2049/2004

52 44 IDRB/DD/CD/CL/AD1/2212/2004

45 IDRB/DD/CD/CL/AD1/2034/2004
54 46 IDRB/DD/CD/CL/AD1/3077/2004

55 47 IDRB/DD/CD/CL/AD1/1610/2006
48 IDRB/DD/CD/CL/AD1/1778/95 Part I

49 IDRB/DD/CD/CL/AD1/2665/2006
IDRB/DD/CD/CL/AD1/3003/96 Part
59 50 file No. II

60 51 IDRB/DD/CD/CL/AD1/1778/95 Vol II

61 52 IDRB/DD/CD/CL/AD1/260/95Vol - IV

62 53 IDRB/DD/CD/CL/AD1/1006/2007

54 IDRB/DD/CD/CL/AD1/2476/2008

64 55 IDRB/DD/CD/CL/AD1/360/2009

65 56 IDRB/DD/CD/CL/AD1/1289/2009

66 57 IDRB/DD/CD/CL/AD1/1339/2009

67 58 IDRB/DD/CD/CL/AD1/1561/2009

59 IDRB/DD/CD/CL/AD1/3868/2010

69 60 IDRB/DD/CD/CL/AD1/3170/2009
70 61 IDRB/DD/CD/CL/AD1/3065/2009

71 62 IDRB/DD/CD/CL/AD1/1146/2011

72 63 IDRB/DD/CD/CL/AD1/1146-1/2011

73 64 IDRB/DD/CD/CL/AD1/2085/97-Vol II

74 65 IDRB/DD/CD/CL/AD1/3838/2011

66 IDRB/DD/CD/CL/AD1/1146/2011

76 67 IDRB/DD/CD/CL/AD1/3494/2012

CS/AD9/1/2015-IDRB
77 68 (IDRB/DD/CD/CL/AD2/270/09)

78 69 CS/AD9/3/2015

70 CS/AD9/1/2016 IDRB

71 CS/AD9/2/2016 IDRB

80 72 CS/AD9/4/2016 IDRB

81 73 CS/AD9/2/2017 IDRB

82 74 CS/AD9/1/2017 IDRB

75 CS/AD9/585/2018 IDRB

84 76 CS/AD10/2/2016 IDRB

85 77 CS/AD9/1346/2018 IDRB

86 78 CS/AD9/675/2018 IDRB
87 79 CS/AD9/584/2018 IDRB

80 CS/AD9/1/2017 IDRB

81 CS/AD9/3/2017 IDRB

90 82 CS/AD9/645/2018/ IDRB

83 No.1593/2015/AD1/CL/IDRB

84 No.1536/2013/IDRB/CL/BSP

75 85 IDRB/DD/CD/CL/AD1/2821/2012

86 No. CS-AD9/2/2015-IDRB

78 87 No. 2777/2014/ IDRB /CL

88 CS-AD9/1897/2018/IDRB
LIST OF FILES (AD1/CANALS)

File Name

Water requirement calculation of Meenachil River valley Irrigation Project


Hydraulic Particulars of Attappady Valley Irrigation Project ( Vol I & Vol II)

MVIP Water requirement calculation Part file


Hydraulic Particulars of MVIP Left Bank Main Canal
Hydraulic Particulars of MVIP Left Bank Main Canal Part file-Aroor tunnel
from ch 21300 to 22200
MVIP Revised alignment of MVIP Left Bank Main Canal
Water requirement calculation of Karapuzha Irrigation Project

L A Interpolation

Vamanapuram Irrigation Project

Inland water transport 7th Five Year Centrally sponsored scheme

MVIP Revised alignment of Vol II

MVIP - Vol I

MVIP - Vol II

MVIP Revised alignment Vol I

MVIP LBMC Revised alignment and LS from ch 8000 to 20000m Vol-IV


Flood in Cochin City
IIP -Hydraulic particulars

Karapuzha Irrigation Project,RBMC-Hydraulic particulars

MVIP- Revised alignment and LS of LBC Vol IV

Flood in Cochin City

Hydraulic Particulars of MVIP Right Bank Main Canal Vol I & II


Construction of MVIP Right Bank Main Canal -Revised Hydraulic particulars
from ch 18000 to 22600m -part file-1
Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from
ch-25665 (Orginal chainage) Vol - I
Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from
ch-27800 m
MVIP Left Bank Main Canal and cut & cover from ch 36350 to ch 36800m
file-part II Vol - II
Modernisation of Malampuzha Irrigation Project-(Water requirement
calculation )
KIP-LBMC - Rectification of breach from ch 2100 to ch 2150m. Design of
reinforced earth retaining wall.

KIP-LBMC - Rectification of breached canal from ch 2100 to ch 2150m CC


retaining wall

Water requirement calculation of Banasurasagar Irrigation Project

KIP-RBC-Formation of Kayamkulam Branch canal from ch 2820m to ch 3875m

Design of cut & cover from ch 36350m to 36800m .

Construction of Syphon in Kottiyam branch canal

PIP-RBC Failure of Pipe culvert from ch 580m to 680 m Revision of HP


Karapuzha Irrigation Project, Revised Hydraulic particulars of LBMC & RBMC
and revision of HP from 0m to 368 1 m of LBMC
MVIP Left Bank Main Canal Construction of cut & cover between ch 25016
and 25134m including transition
MVIP Left Bank Main Canal Construction of cut & cover between ch 25016
and 25134m including transition

IIP Constructing LLC from ch 10490m to 19300 m Revision of HP

MVIP-LBMC Construction of flush escape -----file transferred

MVIP- Construction of Karumalloor distributary - aqueduct between ch 4260 m


& ch 4391 m

IIP Main canal revision of Hydraulic particulars from 0 m to 1366m & from ch
22914 m to ch 26098.

Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars from


12075m to 16125
Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars of
Moolathara RBC from 0m to 12075 m
IIP - LLC Construction of cut & cover from ch 10502m to 10599m and covered
flume from ch 10866m to 11011m.
IIP - Revision of Hyraulic particulars of link canal
IIP Construction of Main canal aqueduct from ch 30200m to 30510m (file with
AD3 MFA

KKIP - Extension of MRBC up to Velanthavalam

IIP - Revision of Hyraulic particulars of Main canal from 24637m to ch 31978m

Draught relief work in Palakkad district. Diversion from Moolthara to Meenkara.

BSP- Venniyode Branch canal-aqueduct from ch 4340m


Diversion scheme from Palakapandy weir to Chulliyar dam.

MRVP-Approval of Hydraulic particulars ( ch. 0 m to ch .7000m)


IIP - Revision of Hyraulic particulars of link canal
MVIP Constructing kadapoor distributory from ch 0m to 1920m including CD
works Flood damage at Ch 1242 M

WRD-KIP-permanent rectification to the breached portion at ch2100m of LBMC

IIP Constructing main canal from ch 23398 to to 23676m including transition .

IIP Constructing LLC from ch 7300m to ch 8100m including CD works.


Balance work revised HP due to introduction of flume and extension of flume

KIP-LBMC permanent measures to the collapsed embankment portion between


ch 37600m to 37800m at ponmannoor near Kottarakkara.
MVIP Constructing Anicadu east minor distributory from ch 0m to 1855m
including CD works (HP)
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
2000m including regulator,cut & cover and CD works (HP)
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
2000m including regulator,cut & cover and CD works. Design of Open flume
between ch 3265m & 3320m.

MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.


Design of Open flume between ch 100m & 245m and open flume between ch
245m & 269m

MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.


Design of Open flume between ch1800m & 1930m and open flume between ch
1129m & 1186m
MIRPA -Constructing of check dam across Bharathapuzha at painkulam in Panjal
Panchayath in Trissur District

MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to


3650m. Design of syphon aqueduct with DI pipe between ch 1023m & 1164m.
MIRPA- Construction of a VCB cum Bridge across Pattukuthuthodu in Ward No
14 of Elamkulam panchayath

IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7311m to 7340m (4x1.7m)
IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7644m to 7687m (5x1.7m)

IIPnConstructing Pressure syphon from ch 13832.50 to 13876.5m (Railway


crossing) Revision of HP from ch 13822.5m to 13879.5m
Construction of VCB cum Bridge across Mavullapoyil thodu at Mavullapoyil in
Eramam Kuttoor Panchayath in Kannur District

Construction of VCB across Shriya river at Kalyate in Enmakaje Panchayath of


Kasargod Taluk in Kasarkode District.

NABARD-Constructuin of VCB cum Bridge across Kanjirapuzha at


Nambooripotty Kalikadavu in Chaliyar Grama Panchayath

MVIP Costructing Madakkathanam Minor Distributory from ch 0m to 3765 m


including flume cut & cover and CD works except aqueduct and flume from
ch.690 to 1522m

Construction of Left Bank canal Shutter of Moolathara Design of Wheel gates-


Design approval

Hydraulicparticulars of proposed box structure of existing Vellayani Branch


canal for shifting to extreame edge of the row for four lane of existing TVPM
Bypass from Kayamkulam to Mukkola in NH 47
IIP - Construction of Flume & Deep fill culvert from Ch 2/000 KM to 3/000 KM
reg. --Orginal proposal returned
Construction of Regulator cum Bridge at kankakkadavu across Bharathapuzha in
Kuttipuram Panchayath- Design Approval
MRVP - Construction of checkdam cum Bridge across Meenachil river
(Kalathukadavu) at Chillachibhagam in Thalappalam of Moonnilavu Panchayath
- Design approval
Peechi scheme - Re-alignment of Diversion canal from Kainoor Chira- proposal
returned.
Reconstruction of box culvert at Ambanattuchira road near Chilavanoor in
Ernakulam District- Design Approval

Construction of a weir across Thootha river at Kalikkadavu in Aliparambu


Panchayat in Malappuram District Transfered from AD10 - Design Approval.
DRIP Rehabilitation and improvement of Barie facilities of Moolathara
Regulator - reg -Design approval

LLC aqueduct at ch: 3740m - installation of valve from Idamalayar Irrigation


Project canal to Komarappadam branch canal
KIFBI-Construction of checkdam across Ithikkarayar at mannayamkadavu for
supplying water to Kalluvathukkal,Parippally and Velinalloor villages under
samagrakudivellapadhathi reg.

Construction of a weir across Kadalundi river near vattanikadavu (Irumbuzhi) in


Kootilangadu Panchayath in Malappuram District
Construction of checkdam cum bridge across panathur river at Kaneepadukkam
in Kallar Panchayath.
Construction of a vented weir cum bridge across Panathur river ar Chirakadavu
at Panathady Panchayath

KIP- Construction of syphon at 165 m in Kollaka Distributory reg.

BSP Note File

Construction of VCB across Shiriya river at Kalyate in Enmakaye Panchayath

IIP - Construction of LLC from Ch 10490 - 12000 m including CD works

Construction of checkdam cum bridge at vallakadavu Pareekkanni connecting


Kavalangad and pullarimangalam Panchayath in Ernakulam District
Construction of check dam at Mannathikadavu across Thoothapuzha at
Cherpulassery Muncipalty in Palakkad Distrit
Status

finished 6/4/2000
approved on 25/6/2002

UO Note to JD Dam safety on 3/10/2015

approved on 29/11/2018
Letter to The Superintending Engineer, Project Circle, Piravom
file with AD3 MFA

approved on 7/8/2004

finished
Reminder II to The CE. Revised alignment plan to be
received

file closed on 11/8/2009


Letter to The Superintending Engineer, Project Circle,
Piravom

work with in the power of the SE ( 20/3/2013)

drawing forwarded on 19/7/2007

file retured on 19/3/2009

approved on 10/3/2011

letter to the CE, P II

approved on 15/5/2009

approved on 1/7/2009

approved on 1/7/2009

approved on 17/8/2009

design and drawing approved on 18/8/2010


proposal retured on 23/6/2012

approved on 26/9/2011

approved on 9/2/2012

design and drawing approved on 2/7/2012

approved on 8/10/2013

approved on 15/5/2009

approved on 22/2/2016

Orginal proposal returned

on going

approved on 22/5/2017

approved 7/2/2018

approved 30/4/2018

approved 13/12/2018

Finsihed
on going

on going

on going

on going

infromed to the CE , P2 on 14/10/2015

Letter to The CE, P1

file retured on 10/10/2012

hydraulic particluars to be recevied letter on 22/12/2018

approved on 2/12/2014

work progress

\
1 IDRB/DD/CD/CL/AD1/1830/89
2 IDRB/DD/CD/CL/AD1/1235/88

3 IDRB/DD/CD/CL/AD1/654/88
4 IDRB/DD/CD/CL/AD1/2657/89

5 IDRB/DD/CD/CL/AD1/2657/89
6 IDRB/DD/CD/CL/AD1/457/87
7 IDRB/DD/CD/CL/AD1/3807/89

8 IDRB/DD/CD/CL/AD1/1046/90

9 IDRB/DD/CD/CL/AD1/149/87

10 IDRB/DD/CD/CL/AD1/283/87

11 PIDO/IV/10/113/79

12 PDN V - 40577/76

13 PDN V - 40577/76

14 PIDO/IV/10/111/79

15 PIDO/IV/10/113/79
16 W5-12321/84
17 PIDO/IV/11/1110/85

18 PIDO/111/8/115/80

19 PIDO/IV/10/113/79

20 IDRB/DD/CD/CL/AD1/227/87

21 IDRB/DD/CD/CL/AD1/1417/92

22 IDRB/DD/CD/CL/AD1/1417/94

23 IDRB/DD/CD/CL/AD1/2516/92

24 IDRB/DD/CD/CL/AD1/2516/92
25 IDRB/DD/CD/CL/AD1/2516/94

26 IDRB/DD/CD/CL/AD1/2006/89

27 IDRB/DD/CD/CL/AD1/3003/96

28 IDRB/DD/CD/CL/AD1/3003/96 - Part file No-1

29 IDRB/DD/CD/CL/AD1/110/88

30 IDRB/DD/CD/CL/AD1/135/98

31 IDRB/DD/CD/CL/AD1/2516/94 (part file -II)

32 IDRB/DD/CD/CL/AD1/1278

33 IDRB/DD/CD/CL/AD1/1750

34 IDRB/DD/CD/CL/AD1/3503/96

35 IDRB/DD/CD/CL/AD1/1436

32 IDRB/DD/CD/CL/AD1/1436

33 IDRB/DD/CD/CL/AD1/2085/97

34

35 IDRB/DD/CD/CL/AD1/449/96

36 IDRB/DD/CD/CL/AD1/1778/95

37 IDRB/DD/CD/CL/AD1/49/98

38 IDRB/DD/CD/CL/AD1/49/98-part-I

39 IDRB/DD/CD/CL/AD1/730/2002
40 IDRB/DD/CD/CL/AD1/1778/95 VOI-II

41 IDRB/DD/CD/CL/AD1/1184/2004
42 IDRB/DD/CD/CL/AD1/1530/2004
43 IDRB/DD/CD/CL/AD1/2049/2004

44 IDRB/DD/CD/CL/AD1/2212/2004
45 IDRB/DD/CD/CL/AD1/2034/2004
46 IDRB/DD/CD/CL/AD1/3077/2004

47 IDRB/DD/CD/CL/AD1/1610/2006
48 IDRB/DD/CD/CL/AD1/1778/95 Part I

49 IDRB/DD/CD/CL/AD1/2665/2006

50 IDRB/DD/CD/CL/AD1/3003/96 Part file No. II

51 IDRB/DD/CD/CL/AD1/1778/95 Vol II

52 IDRB/DD/CD/CL/AD1/260/95Vol - IV

53 IDRB/DD/CD/CL/AD1/1006/2007

54 IDRB/DD/CD/CL/AD1/2476/2008

55 IDRB/DD/CD/CL/AD1/360/2009

56 IDRB/DD/CD/CL/AD1/1289/2009

57 IDRB/DD/CD/CL/AD1/1339/2009

58 IDRB/DD/CD/CL/AD1/1561/2009

59 IDRB/DD/CD/CL/AD1/3868/2010

60 IDRB/DD/CD/CL/AD1/3170/2009

61 IDRB/DD/CD/CL/AD1/3065/2009

62 IDRB/DD/CD/CL/AD1/1146/2011
63 IDRB/DD/CD/CL/AD1/1146-1/2011

64 IDRB/DD/CD/CL/AD1/2085/97-Vol II

65 IDRB/DD/CD/CL/AD1/3838/2011

66 IDRB/DD/CD/CL/AD1/1146/2011

67 IDRB/DD/CD/CL/AD1/3494/2012

CS/AD9/1/2015-IDRB
68 (IDRB/DD/CD/CL/AD2/270/09)

69 CS/AD9/3/2015

70 CS/AD9/1/2016 IDRB

71 CS/AD9/2/2016 IDRB

72 CS/AD9/4/2016 IDRB

73 CS/AD9/2/2017 IDRB

74 CS/AD9/1/2017 IDRB

75 CS/AD9/585/2018 IDRB

76 CS/AD10/2/2016 IDRB

77 CS/AD9/1346/2018 IDRB

78 CS/AD9/675/2018 IDRB

79 CS/AD9/584/2018 IDRB
80 CS/AD9/1/2017 IDRB

81 CS/AD9/3/2017 IDRB

82 CS/AD9/645/2018/ IDRB

83 No.1593/2015/AD1/CL/IDRB

84 No.1536/2013/IDRB/CL/BSP

85 IDRB/DD/CD/CL/AD1/2821/2012

86 No. CS-AD9/2/2015-IDRB

87 No. 2777/2014/ IDRB /CL


LIST OF FILES (AD1/CANALS)

Water requirement calculation of Meenachil River valley Irrigation Project


Hydraulic Particulars of Attappady Valley Irrigation Project

MVIP Water requirement calculation Part file


Hydraulic Particulars of MVIP Left Bank Main Canal

Hydraulic Particulars of MVIP Left Bank Main Canal Part file-Aroor tunnel from ch
21300 to 22200
MVIP Revised alignment of MVIP Left Bank Main Canal
Water requirement calculation of Karapuzha Irrigation Project

L A Interpolation

Vamanapuram Irrigation Project

Inland water transport 7th Five Year Centrally sponsored scheme

MVIP Revised alignment of Vol II

MVIP - Vol I

MVIP - Vol II

MVIP Revised alignment Vol I

MVIP LBMC Revised alignment and LS from ch 8000 to 20000m Vol-IV


Flood in Cochin City
IIP -Hydraulic particulars

Karapuzha Irrigation Project,RBMC-Hydraulic particulars

MVIP- Revised alignment and LS of LBC Vol IV

Flood in Cochin City

Hydraulic Particulars of MVIP Right Bank Main Canal Vol I & II


Construction of MVIP Right Bank Main Canal -Revised Hydraulic particulars from
ch 18000 to 22600m -part file-1
Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from ch-
25665 (Orginal chainage) Vol - I

Revised Hydraulic Particulars of MVIP left Bank Main Canal from part-1 from ch-
27800 m
MVIP Left Bank Main Canal and cut & cover from ch 36350 to ch 36800m file-
part II Vol - II
Modernisation of Malampuzha Irrigation Project-(Water requirement
calculation )

KIP-LBMC - Rectification of breach from ch 2100 to ch 2150m. Design of


reinforced earth retaining wall.

KIP-LBMC - Rectification of breached canal from ch 2100 to ch 2150m CC


retaining wall

Water requirement calculation of Banasurasagar Irrigation Project

KIP-RBC-Formation of Kayamkulam Branch canal from ch 2820m to ch 3875m

Design of cut & cover from ch 36350m to 36800m .

Construction of Syphon in Kottiyam branch canal

PIP-RBC Failure of Pipe culvert from ch 580m to 680 m Revision of HP


Karapuzha Irrigation Project, Revised Hydraulic particulars of LBMC & RBMC and
revision of HP from 0m to 368 1 m of LBMC
MVIP Left Bank Main Canal Construction of cut & cover between ch 25016 and
25134m including transition

MVIP Left Bank Main Canal Construction of cut & cover between ch 25016 and
25134m including transition

IIP Constructing LLC from ch 10490m to 19300 m Revision of HP

MVIP-LBMC Construction of flush escape -----file transferred

MVIP- Construction of Karumalloor distributary - aqueduct between ch 4260 m &


ch 4391 m

IIP Main canal revision of Hydraulic particulars from 0 m to 1366m & from ch
22914 m to ch 26098.

Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars from 12075m


to 16125
Kuriyaryarkutty Karappara Irrigation Project - Hydraulic particulars of Moolathara
RBC from 0m to 12075 m
IIP - LLC Construction of cut & cover from ch 10502m to 10599m and covered
flume from ch 10866m to 11011m.
IIP - Revision of Hyraulic particulars of link canal
IIP Construction of Main canal aqueduct from ch 30200m to 30510m (file with
AD3 MFA
KKIP - Extension of MRBC up to Velanthavalam
IIP - Revision of Hyraulic particulars of Main canal from 24637m to ch 31978m

Draught relief work in Palakkad district. Diversion from Moolthara to Meenkara.


BSP- Venniyode Branch canal-aqueduct from ch 4340m
Diversion scheme from Palakapandy weir to Chulliyar dam.

MRVP-Approval of Hydraulic particulars


IIP - Revision of Hyraulic particulars of link canal
MVIP Constructing kadapoor distributory from ch 0m to 1920m including CD
works Flood damage at Ch 1242 M

WRD-KIP-permanent rectification to the breached portion at ch2100m of LBMC

IIP Constructing main canal from ch 23398 to to 23676m including transition .

IIP Constructing LLC from ch 7300m to ch 8100m including CD works. Balance


work revised HP due to introduction of flume and extension of flume

KIP-LBMC permanent measures to the collapsed embankment portion between


ch 37600m to 37800m at ponmannoor near Kottarakkara.
MVIP Constructing Anicadu east minor distributory from ch 0m to 1855m
including CD works (HP)
MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to
2000m including regulator,cut & cover and CD works (HP)

MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to


2000m including regulator,cut & cover and CD works. Design of Open flume
between ch 3265m & 3320m.

MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.


Design of Open flume between ch 100m & 245m and open flume between ch
245m & 269m

MVIP Constructing Madakkathanam minor distributory from ch 0m to 3765m.


Design of Open flume between ch1800m & 1930m and open flume between ch
1129m & 1186m

MIRPA -Constructing of check dam across Bharathapuzha at painkulam in Panjal


Panchayath in Trissur District

MVIP Constructing Ambalakunnu Devamathakunnu distributory from ch 0m to


3650m. Design of syphon aqueduct with DI pipe between ch 1023m & 1164m.

MIRPA- Construction of a VCB cum Bridge across Pattukuthuthodu in Ward No 14


of Elamkulam panchayath

IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7311m to 7340m (4x1.7m)
IIP Constructing LLC from ch 7300m to 7800m. Design of Open flume from ch
7644m to 7687m (5x1.7m)

IIPnConstructing Pressure syphon from ch 13832.50 to 13876.5m (Railway


crossing) Revision of HP from ch 13822.5m to 13879.5m

Construction of VCB cum Bridge across Mavullapoyil thodu at Mavullapoyil in


Eramam Kuttoor Panchayath in Kannur District

Construction of VCB across Shriya riverat Kalyate in Enmakaje Panchayath of


Kasargod Taluk in Kasarkode District.

NABARD-Constructuin of VCB cum Bridge across Kanjirapuzha at Nambooripotty


Kalikadavu in Chaliyar Grama Panchayath

MVIP Costructing Madakkathanam Minor Distributory from ch 0m to 3765 m


including flume cut & cover and CD works except aqueduct and flume from
ch.690 to 1522m

Construction of Left Bank canal Shutter of Moolathara Design of Wheel gates-


Design approval

Hydraulicparticulars of proposed box structure of existing Vellayani Branch canal


for shifting to extreame edge of the row for four lane of existing TVPM Bypass
from Kayamkulam to Mukkola in NH 47
IIP - Construction of Flume & Deep fill culvert from Ch 2/000 KM to 3/000 KM
reg. --Orginal proposal returned
Construction of Regulator cum Bridge at kankakkadavu across Bharathapuzha in
Kuttipuram Panchayath- Design Approval
MRVP - Construction of checkdam cum Bridge across Meenachil river
(Kalathukadavu) at Chillachibhagam in Thalappalam of Moonnilavu Panchayath -
Design approval
Peechi scheme - Re-alignment of Diversion canal from Kainoor Chira- proposal
returned.
Reconstruction of box culvert at Ambanattuchira road near Chilavanoor in
Ernakulam District- Design Approval

Construction of a weir across Thootha river at Kalikkadavu in Aliparambu


Panchayat in Malappuram District Transfered from AD10 - Design Approval.
DRIP Rehabilitation and improvement of Barie facilities of Moolathara Regulator -
reg -Design approval

LLC aqueduct at ch: 3740m - installation of valve from Idamalayar Irrigation


Project canal to Komarappadam branch canal

KIFBI-Construction of checkdam across Ithikkarayar at mannayamkadavu for


supplying water to Kalluvathukkal,Parippally and Velinalloor villages under
samagrakudivellapadhathi reg.
Construction of a weir across Kadalundi river near vattanikadavu (Irumbuzhi) in
Kootilangadu Panchayath in Malappuram District
Construction of checkdam cum bridge across panathur river at Kaneepadukkam
in Kallar Panchayath.
Construction of a vented weir cum bridge across Panathur river ar Chirakadavu at
Panathady Panchayath

KIP- Construction of syphon at 165 m in Kollaka Distributory reg.

Note File

Construction of VCB across Shiriya river at Kalyate in Enmakaye Panchayath

IIP - Construction of LLC from Ch 10490 - 12000 m including CD works

Construction of checkdam cum bridge at vallakadavu Pareekkanni connecting


Kavalangad and pullarimangalam Panchayath in Ernakulam District