: MPPL-A1693/E-334A
A FAULT LEVELS WITH RATED VOLTAGES AND NORMAL IMPEDANCE OF 1600KVA TRANSFORMERS
1.0 SYSTEM DATA
i Incoming Voltage = 6.6 KV
ii Fault Current = 40 KA
iii Therefore, Fault level at 6.6KV Bus = 457.248 MVA at 6.6KV
iv Fault Clearing Time = 4 Cycles (Max)
= 120 mSec (Max)
v Total Highest Rating motors provided in 6.6KV MCC & 415V PMCC 6.0 Nos
a) Rating = 425 KW (2W+1S)
b) Full Load Current = 46.0 Amp (Marathon data sht)
c) Full Load Efficiency = 95 % (Marathon data sht)
d) Full Load Power Factor = 0.85 lag (Marathon data sht)
e) Rating = 160 KW (2W+1S)
f) Full Load Current = 267.0 Amp (Siemens data sht)
g) Full Load Efficiency = 95.9 % (Siemens data sht)
h) Full Load Power Factor = 0.87 lag (Siemens data sht)
i) K Factor for motor = 1 (Rated >750KW)
j) K Factor for motor = 1.2 (Rated <750KW)
vi 6.6KV, 425KW motor starting current at rated voltage = 6 times FLC (Marathon data sht)
415V, 160KW motor starting current at rated voltage = 7.69663 times FLC (Siemens data sht)
vii Considering 1 out of 2 incomers are on, max possible load on incomer = (425x2+160x2)KW
viii 6.6/0.433KV Transformer rating(TR-1/ TR-2) = 1.6 MVA (2 Nos) (1W+1S)
ix 11/0.433KV Transformer impedance(TR-1/ TR-2) on principal tap = 8% (Max)
Voltage drops at various system components under steady state condition ie when 2x425KW+2x160KW rated motors
3.3
are running, incoming voltage is 6.6KV
p u impedance of 425KW running motor & cable = 9.50225286
p u impedance of 2 nos 425KW running motors & cable = 4.75112643
p u impedance of 2 nos 160KW running motors & Tr at base voltage = 0.51302471
p u impedance of all running motors = 0.46302722
Total p u impedance of system under steady state condition = 0.47954540
VOLT
DROP
% voltage drop at 6.6KV utility = 2.28028149 150
% voltage drop in cable C11 = 1.16426859 77
% voltage drop in cables and motors (Transformer, TR-1) = 96.55544992 6373
% voltage drop in cable C21 = 0.02288661 2
% voltage drop in 425KW motor running = 96.55544992 6373
Voltage drops at various system components when 425KW rated motor is started & 2x425KW+2X160KW rated motors VOLT
3.4
are running, incoming voltage is 6.6KV DROP
Voltage drops at various system components when 160KW rated motor is started & 2x425KW+2X160KW rated motors VOLT
3.5
are running, incoming voltage is 6.6KV DROP
However, 6.6KV(UE) grade cable selected = 1-3C x 240 sqmm AL conductor XLPE insulated
ii For power supply to 425KW rated motors 6.6KV(UE) grade XLPE insulated cables having Aluminium conductor and
conforming to IS-7098(Part-2)-1985, have been selected to carry running current of motor
Current carried by cable = 46 A(approx)
Current rating of 1-3C x 150sqmm AL conductor
= 290 A
XLPE insulated cable in trays
0
Deration for 50 C ambient temperature = 0.87
Deration for cables laid on cable trays = 0.75
2. Cable sizes selected are in order. Noted. We have started the process of
procurement of HT cable(s) and shortly be
submitting technical details from sub-
vendor for your approval.
3. (Fault Clearing Time (Max) considered for cable sizing Noted. Calculations revised accordingly.
should be considered as) 0.12Sec.
4. Cable screen size shall be designed for 300A for 2 Noted and agreed. The same shall be
seconds taken care of while submitting technical
details from sub-vendor for your approval.
5. Running and starting voltage drop calculation to be Already done. Please refer S No 3.2 & 3.3
submitted separately of calculations submitted.
7. Motor shall contribute fault current as per its locked We are not sure under what condition
rotor kVA/kW ie LR KVA/KW=6/(eff*pf) running motor can contribute fault
current to the extent of 6FLC. In our
opinion this is only one of the criteria for
deciding K value for fault contribution by
any running motor. However, since fault
contribution by running motors is very
nominal we have revised the calculations
as desired by you.
9 Fault level at 6.6KV Switch Board bus at rated voltage The MVA specified by you is designed
due to utility - 6.6*1.732*40 fault withstand capability of 6.6KV SWBD
Value is incorrect while value calculated is the actual fault
coming on main busbars when the SWBD
is connected to a system through 1-3C x
240 sqmm AL conductor XLPE insulated
ANNEXURE-I
Confirmation / Clarification Sheet
Fault Level Calculations (1600KVA Transformer) - (4230-162(A) – PV E – U – 004A, Rev-00)
cable of length 250Mtrs and having 40KA
fault current upstream of this SWBD.
Needless to say calculated fault level
should be less than designed fault level of
SWBD.
9 PMCC designed to withstand 35MVA 50KA fault level Corrected in revised document.
for 1.0Sec at 415V, 50Hz.
10 % voltage drop in 425KW motor running: Please note that actual load under
96.56703722 - ? running condition shall only be 334.6KW
as such % voltage drop available across
motor shall be much more than calculated
value. However, it shall not be out of
place to mention that restriction of
voltage drop limited to 3% of rated
voltage is only applicable for LT motors as
per technical specifications & not for HT
motors.
2 Also calculate for when 2X425kw+2X160kw running Complied with in revision 2 of calculations
then attached herewith. However, under
1. when stand by 425kw is starting for changeover, normal conditions of system only 2nos
calculate in this condition starting & running voltage 425KW and 2nos 160KW motors shall run
drop in cables as such voltage drop under running
2.when stand by 160kw is starting for changeover, condition shall remain same.
calculate in this condition starting & running voltage
drop in cables (Typ.)
3 Excel sheet of all calculations in details to be attached Complied with.
(Typ.)
4 1.Cable sizing calculations to be as per amp.rating, Confirmed compliance
starting voltage drop, running voltage drop, short
circuit fault current calculations as per contract,
relevant standards etc.(Typ.),Vendor to check, ensure
& confirm (Typ.)
5 2.Transformer,HT Swgr,LT Swgr etc fault levels to be Confirmed compliance
as per contract, relevant standards etc.(Typ.),Vendor
to check, ensure & confirm (Typ.)
6 1.Calculations shown or not shown to be as per Complied with.
Contract, Tender drawings, relevant standards
7 2. Drawing is inline with all related drawings & Confirmed
documents & matched with related to other groups
eg. Mechanical, Civil, C&I etc.
8 3. Changes made from previous revisions are Complied with.
specifically mentioned in compliance sheet.
ANNEXURE-I
Confirmation / Clarification Sheet
Fault Level Calculations (1600KVA Transformer) - (4230-162(A) – PV E – U – 004A, Rev-00)
9 4.Fault level, sizing calculations of Swgrs, Complied with.
transformers, cables etc are as per Contract, Tender
drawings, relevant standards
10 Mention all ref. drg. nos. Complied with in revision 2 of calculations
Mention SWGRs, Transformers, Cables etc drg. nos. attached herewith.
as ref. drg. nos