Sunteți pe pagina 1din 85

Welcome to Supplier Training Week!

Please Sign the


May 4-8, 2015
Roster!

CORPORATE QUALITY MANAGEMENT SYSTEM (CQMS) Overview

Supplier Training – May 2019

Delia Patterson / Paula Mack

Supplier Quality Operations


Objectives

Review system
expectations and
basic functionality

Learn who to
contact for help
with SQ system
or process
questions

Understand the
importance of the
data collected in
CQMS
2
Agenda Overview
CQMS Access & System Definition
Basic Functionalities
Training Documents
Email Notifications
Contact Information
AQP Enhanced Detail Screen
PPAP Submission Screen
PPAP Mass Update Screen
Relational Dates and Dependencies
Automatic Cascade of Dates & Approvals
IMDS
Reporting
AQP Supplier Reports
Supplier Quality Portal
EBSC
Contact List
3
What is CQMS?

CQMS is a FCA developed Advance Quality Planning (AQP) tool:

 used to collect, validate and approve select AQP data for new or
existing Model Year (MY) parts modified via change notice that have
a PPAP requirement and are end item to assembly

What does FCA do with the data entered in CQMS?

 Gauge vehicle program readiness to launch

 PPAP approval entry allows the supply base to invoice for tooling
payments (TPO)

4
Access to CQMS

Access to all FCA applications is


through eSupplierConnect.com
Region = NAFTA
Sector = FCA

• Brand new suppliers: the first person to register from your company will be designated as the company
security administrator.

• New users from a current supplier: can sign up via online registration (click the “Register” link on the
eSupplierConnect home page).
 You will need to know all supplier code(s) you are responsible for, along with general personal and
business information (e.g. full name, contact info, etc.).
 Once you have submitted your request for access, your company’s security administrator will approve
you for access.

• To request access to certain applications: within the “Application” tab (found at the top of the
eSupplierConnect screen), search for the applications you want and then click the “Request” button next to it.
 Once your request is approved by your company security administrator, you will be notified and can then
access the application. 5
eSupplierConnect Help Desk & Support

Step-by-step reference guides are available in the eSupplierConnect Support


area (available by clicking the Help Desk Support link) .

6
What is that Acronym?
AQP Advance Quality Planning
CN Change Notice (part change)
CQMS Corporate Quality Management System
DIM Dimensional PPAP Requirement
EBOM Engineering Bill of Material (part numbers)
EBSC External Balanced Scorecard
FR Forever Requirement (process change)
IRE Initial Risk Evaluation
IAA Interim Authorization Approval
IMDS International Material Data System
LAB Laboratory PPAP Requirement
NIK Non-Interchangeable Key (part revision level)
PSW Part Submission Warrant
RQ PPAP Requirement
PPAP Production Part Approval Process
RN Resource Notice (change in part manufacturing location)
SQE Supplier Quality Engineer
TEA Tooling Expense Authorization
7
TPO Tooling Purchase Order
CQMS Basic Functionality

System training and FAQ documents are stored as .pdf documents and are
available for review or download from the CQMS Training Documents tab

8
CQMS Basic Functionality

Working screens are located under the Part Information tab

9
CQMS Basic Functionality

Subscribing to notifications provides a once daily email of all task promise


dates updated by the FCA SQE on behalf of the supplier

10
CQMS Basic Functionality

Example of email notification identifying all PDR and PPAP promise date
changes that were applied by a FCA SQE.

11
Frequently Asked Question:
On the CQMS home page, I noticed a disclaimer statement,
what does that mean?

DISCLAIMER: FCA, as Buyer, assumes no liability to Seller for services provided


or work performed prior to or apart from the issuance of a binding contract for the
purchase of such goods and/or services.

Answer:
In order to meet all program milestone deliverables, it is
sometimes necessary to begin work in CQMS prior to official
program approval or contract issuance.
The disclaimer statement was added as a reminder that the
only guarantee of business is with the issuance of a
binding contract.
12
Frequently Asked Question:
Who is the FCA Supplier Quality Engineer assigned to my
parts?

Answer:
The FCA SQE for each part is listed within the Contact
Information screen in CQMS. If there is no SQE identified,
please send an email to the CQMS@fcagroup.com help
mailbox with the part number in question. They will ensure an
SQE is assigned to the part as soon as possible.
13
CQMS – Source Systems

New/modified Parts

Part Usage Purchase Orders

Part Status Tooling Purchase Orders

Supplier Codes

Buyer Codes

Commodity Codes

Interim Authorization
Approvals (IAA)

Change Notices (CN)

Forever Requirements (FR)


CQMS
Resource Notices (RN)

IMDS Status

WEB IMDS Exemptions

CN 14
Frequently Asked Question:
Why is my part missing in CQMS?
Answer:
In order for a part to be in CQMS, the following conditions
must be true:
• The part has been released/disclosed AND it has been
sourced
• The part is not a carry over part
• The part’s Lineup Code does not start with "02” (Purchased
in Assembly)
• The part’s EBOM attributes (Model Year, Market, Series,
Program code, etc.) matches the Program Timing
15
AQP Enhanced Detail Screen - Filters
CQMS > Part Information > AQP Enhanced Details

The AQP Enhanced Details Screen includes all mandatory and optional AQP
tasks in a one page view
16
AQP Enhanced Detail Screen - Filters
CQMS > Part Information > AQP Enhanced Details

Use Category filter option to


isolate a specific list of part +
tasks
• This feature acts as your work
To-Do list

17
AQP Enhanced Detail Screen - Filters
CQMS > Part Information > AQP Enhanced Details

To see parts sourced to all


Mfg supplier locations
assigned to your login ID
• Select “All Locations” from the
Supplier Code drop down; or
select a single location

18
AQP Enhanced Detail Screen - Filters
CQMS > Part Information > AQP Enhanced Details

You can also search by a single 10-


position part number

19
AQP Enhanced Detail Screen - Filters
CQMS > Part Information > AQP Enhanced Details

To display (update) more results


on a page
• Increase the Row/Page count
(maximum 999)

20
CQMS Updates: TKO renamed to TCS

CQMS > Part Information > AQP Enhanced Details

Tool Cut
Start

TCS (Tool Cut Start) = when the design of the tool has been completed and the Supplier has
begun the construction of the tool (i.e. cutting steel or “chips flying”).
• TCS is a date entered by SOEs or Suppliers in CQMS.
• The TKO deliverable in CQMS has always been intended to record the "cut" date.

TKO (Tooling Kickoff) = the formal process of FCA giving the Supplier an approval to start their
tooling process based on part design readiness.
• A form is signed when the MFA is green and all involved parties agree that part design is ready, signaling to
the Supplier that they're able to begin their tooling.
• TKO is lead by Engineering and data is entered into their system, called PDP.
• SOEs should be involved in this form-signing process for all parts that are considered high risk, or PPAP
Level 4 and 5.
AQP Enhanced Detail Screen - Basics
CQMS > Part Information > AQP Enhanced Details

1 2

22
AQP Enhanced Detail Screen - Basics
CQMS > Part Information > AQP Enhanced Details

To decrease the # of pages, increase the Row/Page count in the filter options
1 2

23
AQP Enhanced Detail Screen - Basics
CQMS > Part Information > AQP Enhanced Details

Moving the mouse over underlined


text provides additional detail

1 2

24
AQP Enhanced Detail Screen - Basics
CQMS > Part Information > AQP Enhanced Details

Clicking on a down arrow sorts the results Ascending to Descending, across all pages of parts

1 2

25
AQP Enhanced Detail Screen - Basics
CQMS > Part Information > AQP Enhanced Details

Use the scroll bar to view all tasks


1 2

26
AQP Enhanced Detail Screen - Basics
CQMS > Part Information > AQP Enhanced Details

Tasks with gray background are optional


• Entering a promise date for an optional task does not make the task mandatory.

27
AQP Enhanced Detail Screen - Basics
CQMS
IMDS, LAB> andPart Information
DIM task have> AQP Enhanced
gray Details because they cannot be edited
background
CQMS > Part Information > AQP Enhanced Details
• IMDS status is an automatic feed from the IMDS System
• PPAP dates are managed in PPAP Submission screen or PPAP Mass Update

28
AQP Enhanced Detail Screen - Basics
CQMS > Part Information > AQP Enhanced Details

Promise / Actual Date(s) + Dispositions can be applied to a single part + task, or across
multiple parts + suppliers + tasks by selecting the “All” option below each task name.

29
AQP Enhanced Detail Screen - Basics
CQMS > Part Information > AQP Enhanced Details

Triggers additional mandatory tasks

30
AQP Enhanced Detail Screen - Basics
CQMS > Part Information > AQP Enhanced Details

Promise Date past due

No Promise Dates

31
AQP Update – Step by Step
CQMS > Part Information > AQP Enhanced Details

1. Select your filters, then click “Find”


32
AQP Update – Step by Step
CQMS > Part Information > AQP Enhanced Details

2. Select part + tasks to update


33
AQP Update – Step by Step
CQMS > Part Information > AQP Enhanced Details
3. Select a current promise date (only one date can be applied per update
action)

4. If you’re changing an existing date, you will


be required to select a reason for moving the
date.

5. Click Update

34
AQP Update – Step by Step
CQMS > Part Information > AQP Enhanced Details

6. Select an actual date and select a disposition value from the drop down
Note: You can select an actual date and approval without first having entered a promise date

35
Frequently Asked Question:
How can I correct my supplier code in CQMS?

Answer:
Only a FCA buyer has the authority to correct the supplier
manufacturing location once a contract (PO) or TPO has been
issued.

To locate the email address or phone number for the Buyer,


please use the “Contact Information” page within the Part
Information screen.
36
Frequently Asked Question:
What if my team entered the wrong manufacturing supplier
code on a Forever Requirement?

Answer:
Since the FR is in “Finalized” stage in WebCN, the supplier
code can only be corrected in CQMS. CQMS admins can
reassign the FR to an existing supplier codes in CQMS for that
part.
If the supplier code does not exist in CQMS for that part, the
Buyer will need to manually source the part in CQMS or you
will need to create a new Forever Requirement for the correct
manufacturing supplier location.
37
Frequently Asked Question:
Where do I upload my Part Submission Warrant (PSW)?

Answer:
There are no document uploads within CQMS. The PSW is
stored at the supplier location and should be made available
upon request by FCA.
38
PPAP Submission
CQMS > Part Information > PPAP Submission

Used to view and update PPAP Requirements, PPAP Promise


Dates, PPAP Actual Dates and Dispositions for a part.

39
PPAP Submission
CQMS > Part Information > PPAP Submission

Enter Part Number and click Find

40
PPAP Submission
CQMS > Part Information > PPAP Submission

B = both dim and lab required


D = dim only
L = lab only
N = no dim or lab required

42
PPAP Submission
CQMS > Part Information > PPAP Submission
When part PPAP Level = 1, 2 or 3, suppliers can
enter actual dates + dispositions

43
PPAP Submission
CQMS > Part Information > PPAP Submission

Select a Dim/Lab promise date for a CN with an RQ = “N” (none) automatically


increases the requirement

44
PPAP Submission
CQMS > Part Information > PPAP Submission

What do I do if I entered an approval in error?


 Contact cqms@fcagroup.com

45
PPAP Submission – TRM & Color Parts
CQMS > Part Information > PPAP Submission

You will only be able to update the Dimensional Promise or Actual dates for the TRM part

Lab promise / actual dates and dispositions are applied to the color part and rolled up during
the overnight batch process to the TRM row for the part + supplier + CN.

46
PPAP Submission – TRM & Color Parts
CQMS > Part Information > PPAP Submission
Color parts roll up to a ‘TRM’ part number

example: 1YR12TRMAB
The ‘TRM’ is the rollup part number
Individual color parts are 1YR121DMAB, 1YR12RXFAB.

In the above case, FR13080213 affects the TRM part and two Color parts (RXF and 1DM).
You will only be able to update the Dimensional Promise or Actual dates for the TRM part
number (1YR12TRMAB).
You will only be able to update the Laboratory Promise or Actual dates for the Color part
numbers (1YR121DMAB, 1YR12RXFAB).
47
PPAP Mass Update
CQMS > Part Information > PPAP Mass Update

Used for updating PPAP dates and dispositions across multiple part
numbers, CNs, supplier mfg locations

48
PPAP Mass Update
CQMS > Part Information > PPAP Mass Update

1. Select an update element to limit the result set

Use Category filter option to isolate a specific list of part + tasks


This feature acts as your work To-Do list
49
PPAP Mass Update
CQMS > Part Information > PPAP Mass Update

2. Enter a CN and / or Supplier Code

Allows you to view status and update across all parts on a specific
CN / FR / RN / TEA

50
PPAP Mass Update
CQMS > Part Information > PPAP Mass Update

3. Select one or more optional filters to streamline results


4.Click Find

51
PPAP Mass Update – Step by Step
CQMS > Part Information > PPAP Mass Update

• Only the latest part NIK level for a supplier will


appear in the result set.

• The nightly cascade process will backfill


approvals across any previous part NIK level
that is not already PPAP approved.

52
PPAP Mass Update – Step by Step
CQMS > Part Information > PPAP Mass Update

6. Select dim / lab promise dates


CQMS > Part Information > PPAP Mass Update

7. If you are changing an existing date, you will be required to


select a reason for moving the date.

Always check the PPAP requirement first.

If ‘RQ’ = “D” (dimensional only) and you enter both a dim and lab promise date, on the update
action, it will automatically increase the PPAP requirement to both Dim and Lab.
53
PPAP Mass Update – Step by Step
CQMS > Part Information > PPAP Mass Update

8. Select an actual date and select a disposition value from the drop down
Note: You can select an actual date and approval without first
having
CQMS selected
> Part a promise
Information date
> PPAP Mass Update

Suppliers can only enter PPAP approvals for parts with PPAP Level = 1,2, or 3
54
Frequently Asked Question:
My part risk is low, but it won’t allow me to enter the
dimensional and laboratory approval for my Forever
Requirement (FR)?

Answer:
If the risk of the Forever Requirement was considered “High”
by your SQE, you will not be able to enter the PPAP approval in
CQMS even if the part risk is low.

Please work with your SQE to have the approval entered into
CQMS when ready.
55
56
CQMS Logic - Task Dependencies

Before PPAP approval can be entered in CQMS, a part must first have a Part PPAP Level,
IMDS approval, & completed mandatory AQP tasks.

Once a task promise date is entered, it cannot be deleted.


You cannot enter a promise date in the past.
When Part Inspection
When Process FMEA
Standard
(PFMEA) is required
(PART I/S) is required

PPAP PPAP PPAP PPAP


Primary Task
Dependent Task Name Dimensional Laboratory Dimensional Laboratory
Responsibility
Approval Approval Approval Approval

Initial Risk (IRE) SQE Mandatory Mandatory Mandatory Mandatory


TKO Supplier Mandatory Optional Mandatory Optional
Part (I/S) Supplier Mandatory Optional Optional Optional
PFMEA Supplier Mandatory Mandatory Mandatory Mandatory
OTOP Supplier Mandatory Optional Mandatory Optional
Gage R&R Supplier Optional Optional Optional Optional
PVT Start Supplier Optional Mandatory Optional Mandatory
PDR Supplier Mandatory Mandatory Mandatory Mandatory
Dim CAP Supplier Optional Optional Optional Optional
IMDS Supplier Mandatory Mandatory Mandatory Mandatory
PVT End Supplier Optional Mandatory Optional Mandatory
57
CQMS Logic - Relational Dates

• Within CQMS, there is a systematic control on date entry that prohibits the
entering of a promise date that is in direct conflict with an existing promise
date for a related task.
• If a promise date is entered outside of a specified parameter, an error
message will be displayed indicating the update cannot proceed due to an
invalid entered date

Dependent Task Name Relational Date Logic

Initial Risk (IRE) N/A


Tooling Kick Off (TKO) on or before OTOP
Part Inspection Standard (Part I/S) on or before earliest Dimensional PPAP
PFMEA Accepted (PFMEA) on or before earliest Dimensional PPAP
Off Tool Off Process (OTOP) on or before PDR
Gage R&R Complete (Gage R&R) on or before earliest Dimensional PPAP
Production Validation Testing Start (PVT Start) on or before PVT End
Production Demonstration Run (PDR) on or before earliest Dimensional PPAP
Dimensional Capability Complete (Dim CAP) on or before earliest Dimensional PPAP
IMDS Acceptance (IMDS) N/A
Production Validation Testing End (PVT End) on or before earliest Laboratory PPAP
58
CQMS Logic - Automatic Cascade of Dates & Approvals

To minimize the amount of work required in CQMS, on a nightly basis, all task approvals
completed at a later park NIK level will automatically cascade to all earlier part NIK levels
if there are open tasks (not completed).

On a nightly basis, the system will PPAP approvals completed at the latest
automatically cascade task promise/actual park NIK level will automatically cascade to
dates + dispositions from the highest active earlier part NIK levels.
part NIK level to any previous part NIK level
where a task is not already completed. Latest Part NIK Earlier Part NIK Levels

In addition to the cascade process, when a part


NIK level changes, part risk and any AQP task
promise / actual date + disposition that was
entered within the past 365 days will
automatically be copied to the new part NIK
level.

Cascade of promise dates will only be applied if an existing promise date is in the past or
there is no promise date. 59
Frequently Asked Question:
Can you tell me about the IMDS requirement?

Answer:
IMDS (International Material Data System) is a regulatory
requirement that mandates all substances found on the vehicle
as sold are required to be declared.

For more information on the requirement and how to declare


substances, please visit the IMDS website:
http://www.mdsystem.com
60
IMDS / SoC Compliance Portal

What applications are available to check IMDS status?


The FCA IMDS / SoC Compliance Portal was developed to provide a
centralized platform for Suppliers & Engineers to:

• View IMDS status by part number


• Query IMDS required parts by selected filters
• View IMDS exemption scope by part number

• To access the portal, request access via eSupplierConnect


61
IMDS / SoC Compliance Portal

62
IMDS Screen in CQMS

IMDS Status from SoC/IMDS


Compliance Portal

Part Status from EBOM (R=Released, C=Cancelled)


63
IMDS Status

IMDS Status Definition

Not Required (NR) IMDS Record is not required

Not Submitted IMDS Record is not submitted


(space)

Not Seen (NS) IMDS Record has been received but not yet opened

Browsed (B) IMDS Record has been opened / viewed, but status is not decisioned

Cancelled (C) IMDS Record has been cancelled by Supplier

Rejected (R) IMDS Record is rejected

Accepted* (A*) IMDS Record is accepted from previous NIK version via CN carryover logic

Accepted (A) IMDS Record is accepted

64
Frequently Asked Question:
The MDS Record was submitted and it was accepted. Why
is it not showing the accepted status in CQMS?

Answer:
Please check the following:
• Data has been submitted to the correct FCA Company ID (71459)
• IMDS acceptance was received at least 5 business days prior
• Supplier code on the IMDS submission aligns with the FCA Purchase
Order (base-5)
• Part number was entered correctly on the IMDS submission

If all the above are true, please forward inquiry to


FCAUS_IMDS@fcagroup.com
65
Frequently Asked Question:
When can I invoice for a tooling payment?

Answer:
Once PPAP approval has been entered into CQMS for the part number +
CN (or TEA) associated with the TPO, wait at least 2 business days before
attempting to invoice for your tooling payment.
In addition to the PPAP approval, you must also have tooling verification in
order for the invoice to be accepted.
If you have any questions regarding a tooling invoice rejection, please send
your inquiry to the email identified on the rejection notification.
66
Recap of Basic Expectations

• Check the system a minimum of 2 times per


week and keep dates current

• Use filters to identify required tasks

• Subscribe to system notifications

• Review all training material and FAQs

• Send an email to CQMS@fcagroup.com if you


cannot find the answer to your question
67
Frequently Asked Question:
Is there reporting in the CQMS application?

Answer:
No. There is a separate FCA application for CQMS reporting
called “AQP Supplier Reports”.
68
CQMS Reporting

• CQMS reporting is located within the AQP Supplier Reports application.


• Supplier Quality Portal will also provide CQMS Summary and Detail Report

69
Supplier Quality Portal

Supplier Quality Portal provides a summary count and part detail


report of all mandatory tasks within CQMS that are not yet complete.
Note: SQP is updated nightly.

70
AQP Supplier Reports

• AQP Supplier report detail is by individual mfg supplier location.

• In order to see BSC report detail for a mfg supplier location, you will also
need access to the GPSIS application, for each mfg supplier location

Part+NCT score detail for


previous month score

Provides an explanation on how


the score is calculated

View the laboratory PPAP / IMDS


status for each color part

View the IRE, AQP, PPAP, IMDS status for all


non-color part+CNs

View the deliverables due for the current and next month

View the deliverables scored in previous months

View the detail behind the AQP scores

71
Help Icon for AQP Screen

72
AQP Supplier Measure Report

Report on scores created for previous months by Source Country / 4


digit Commodity Code
74
AQP Supplier Measure Report

Report on score details listed by category created for previous months


by Source Country / 4 digit Commodity Code
Deliverables Submitted
Monthly Score =
Deliverables Required
Deliverables Submitted
Cumulative Score (6 months rolling) = ∑ Deliverables Required
75
AQP Scoring – 6 Month Rolling Calculation Summary

For the month of May, between November and April, there were 6
deliverables successfully submitted out of 7deliverables total: 6 / 7 = 86%

Nov Dec Jan Feb Mar Apr Total


Submitted on Time 4 0 0 2 0 0 6
Deliverables Due 4 0 0 3 0 0 7

Once June rolled around, the deliverables for November falls off and your
score is calculated from Dec – May. Now your score is (2 / 3) = 67%

Nov Dec Jan Feb Mar Apr May Total


Submitted on Time 4 0 0 2 0 0 0 2
Deliverables Due 4 0 0 3 0 0 0 3

As each month is calculated, an additional month drops out of your


calculation.
76
Deliverables Scored

Deliverables processed for previous month score

= Finalized (Deliverables Submitted)

= Past Due (Deliverables Missed)


78
Current Deliverables Due

Deliverables due for the current and subsequent months


= Finalized (Completed Deliverable)
= Actionable (Incomplete Deliverable)

79
Supplier Parts To Do List

Task details for unapproved non-color parts

80
Supplier Color Parts To Do List

Task details for unapproved Color parts

81
PIQ Detail Report

Part + NCT score detail for previous month score

83
AQP Score vs. CQMS

• The AQP Score found in EBSC is a sub-set of the parts that are managed
in CQMS.

• Not all mandatory work in CQMS is included in the AQP Score.

What is included in the AQP Score?


• Parts in Released or Disclosed status (Cancelled parts are not scored)

• Production or Tooling Purchase Order (PO) status is active or none issued

• FCA SQEs and Suppliers share scoring for all tasks, regardless of who has task
responsibility
PPAP Level is the responsibility of FCA SQEs, however,
suppliers are also scored for PPAP Level.
IMDS is the responsibility of the supplier, however, FCA
SQEs are also scored for IMDS.

• Parts not within a ‘grace period’


84
Understanding the AQP BSC

Detailed information about AQP Basics including grace periods can be


found under to Training Documentation tab in CQMS

85
Frequently Asked Question:
One last question, who do I contact if I have a process or
system question?

86
Frequently Requested Contacts

Short Name Area Email


3CPR 3rd Party Containment & Problem Resolution 3CPR@fcagroup.com
3rd Party Audits PFMEA and Control Plan Document Audits 3paudits@fcagroup.com
AQP Supplier Repts AQP Supplier Reports (CQMS) cqms@fcagroup.com
BSC BSC Deliverable Due Reports cqms@fcagroup.com
CQMS Corporate Quality Management System cqms@fcagroup.com
Supplier Scorecard - General Questions
EBSC ebsc@fcagroup.com
(Delivery, Partnership, Cost)
EBSC - Quality Supplier Scorecard - Quality Questions ebsc-sq@fcagroup.com
eCIMS eCorporate Issue Management System eCIMShelp@fcagroup.com
FR Forever Requirement (WebCN) ForeverRequirement@fcagroup.com

IMDS International Material Data System FCAUS_IMDS@fcagroup.com

NCT - production Non Conformance Tracking System ncts@fcagroup.com


NCT - mopar Non Conformance Tracking System Mopar_SQ@fcagroup.com
Quality EBSC Supplier Quality EBSC Score ebsc-sq@fcagroup.com
SCAP Supplier Chargeback Approval Process ncts@fcagroup.com
SQP Supplier Quality Portal cqms@fcagroup.com
TS16949 TS16949 certification TS16949@fcagroup.com
Warranty Supplier Warranty Score sqwarr@fcagroup.com
87
Questions?

88
Course Title

Thank you for attending!


Please complete the evaluation
on the mobile app!

89

S-ar putea să vă placă și