PLAN RECORD REVISIONS

AP- CHECK-
ISOMETRIC SCREW NO. D E S C R I P T I O N (DATE) PROVED ED
61110-1021-1
-- See next page
M ITSUBISHI’S DRAWIN G NO.
CUSTOM ER’S DRAWING N O.

  Notes:

1. This document is the property of and contains confidential proprietary information of MITSUBISHI

HEAVY INDUSTRIES, LTD. (MHI) and shall not be reproduced, used, disclosed or transmitted in
Sec. Code
whole or in part unless authorized in writing by MITSUBISHI HEAVY INDUTRIES, LTD.
RL4
2. This document has been prepared based on MHI’s standard philosophy and experiences.
出図先 部数
HBC 2
三電殿
3. Contents shall be reviewed after finalizing P&ID such as Boiler water/steam, Air and Gas, Fuel
プ技一
Coal/Oil, Turbine bypass system, BFP system, Coal mill/Coal feeder system, FDF/IDF system and
小林 PM A
プ 計機 A so on for Guodian Taizhou Power Plant.


設 4. Type of drives and actuators shall be designed and decided by others.
プ 装
二 海淡 5. Interface between DCS and drives/sensors shall be checked by others after system design is
計 計二 S+1
電 電 finalized.
火 ソ S+1
制 機
技 調
計画 S+1
陸 新技
ボ 保技

エ 技サ S+1
ネ 燃シ S+1



陸 技
タ 本

風 力 PRELIMINARY
舶 タ
原 設
(伝)
火 計
(企)
火 計                                         A4×26
(輸)
計 電 工 A3×4 SHEET(S) WITH COVER
建 設
土 建 CONTROL & ELECTRICAL SYSTEM
生 管 ENGINEERING SECTION GUODIAN TAIZHOU POWER PLANT 2 x 1000MW COAL FIRED BOILERS
品 証
機品一
機品二 APPROVED
本社
計電技
1 FUNCTIONAL DESCRIPTION OF
CHECKED BOILER CLOSED LOOP CONTROL
D R AW N SYSTEM (BOILER PROPER)
CONFERRED SCALE ~
原輸二
菱制シ技 1 C U S TO M E R ’ S D R AW I N G NO .
ORDER ITEM REV.

計 9
07457/07458 61000 MITSUBISHI’ S DRAW ING NO. P
61110-1021-1
MITSUBISHI HEAVY INDUSTRIES,LTD.
NA GASAKI SHIPYARD & MACHINERY WOR KS
DRAWN  July.08, 2005 ISSUED
Record of Revision
                        61110-1021-1
Rev. DRA CHEC APPR
Date Description
No. WN KED OVED
P July. 08, 2005 First issue as preliminary.