Date: _________________
Name of
Project/Location
Contractor
Part of Structure to be Estimated Volume
poured (cu.m.)
Station Limits/Section
Date of Pouring Time of Pouring
Request By:
Contractor:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
Project Engineer
(Name and Signature
Accrediation No.
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Name of
18FJ0037- Const. of Multi-Purpose covered court @ Brgy. Cawayan, Masbate
Project/Location
Contractor JOLAC'S Construction
Part of Structure to be Estimated Volume
poured (cu.m.)
Station Limits/Section
Date of Pouring Time of Pouring
Request By:
Contractor:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
OLIVER H. CASTILLO
Project Engineer
(Name and Signature
Accrediation No. PO144
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Name of
18FJ0083 - Repair/Maint. Of Flood Control @ Cawayan, Masbate
Project/Location
Contractor JOLAC'S Construction
Part of Structure to be Estimated Volume
poured (cu.m.)
Station Limits/Section
Date of Pouring Time of Pouring
Request By:
Contractor:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
HEZER M. CANTUBA
Project Engineer
(Name and Signature
Accrediation No. PO2074
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
ABNER P. FERRER
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
HILARIO A. MANLANGIT
Project Engineer
(Name and Signature
Accrediation No. 3868
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
ABNER P. FERRER
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
HILARIO A. MANLANGIT
Project Engineer
(Name and Signature
Accrediation No. 3868
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
CYNTHIA L. CARANDANG
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
LIGAYA F. COBILLA
Project Engineer
(Name and Signature
Accrediation No. 1138
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
CYNTHIA L. CARANDANG
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
Date: _________________
Request By:
Contractor:
CYNTHIA L. CARANDANG
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
Date: _________________
Request By:
Contractor:
CYNTHIA L. CARANDANG
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
Date: _________________
Request By:
Contractor:
CYNTHIA L. CARANDANG
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
Date: _________________
Request By:
Contractor:
CYNTHIA L. CARANDANG
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
Date: _________________
Request By:
Contractor:
CYNTHIA L. CARANDANG
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
LIONELLE L. ANDES
Project Engineer
(Name and Signature
Accrediation No. PO605
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
CYNTHIA L. CARANDANG
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
LIONELLE L. ANDES
Project Engineer
(Name and Signature
Accrediation No. PO605
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
CYNTHIA L. CARANDANG
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
LIGAYA F. COBILLA
Project Engineer
(Name and Signature
Accrediation No. 1138
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
NEIL L. NUÑEZ
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
OLIVER H. CASTILLO
Project Engineer
(Name and Signature
Accrediation No. PO144
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
NEIL L. NUÑEZ
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
OLIVER H. CASTILLO
Project Engineer
(Name and Signature
Accrediation No. PO144
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
NEIL L. NUÑEZ
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
OLIVER H. CASTILLO
Project Engineer
(Name and Signature
Accrediation No. PO144
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
NEIL L. NUÑEZ
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
LIONELLE L. ANDES
Project Engineer
(Name and Signature
Accrediation No. PO605
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
NEIL L. NUÑEZ
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
LIONELLE L. ANDES
Project Engineer
(Name and Signature
Accrediation No. PO605
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
NEIL L. NUÑEZ
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
OLIVER H. CASTILLO
Project Engineer
(Name and Signature
Accrediation No. PO144
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
NEIL L. NUÑEZ
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
LIONELLE L. ANDES
Project Engineer
(Name and Signature
Accrediation No. PO605
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Name of 18FJ0019- Const. of Multi-Purpose Covered Court @ Brgy. San Jose, Cawayan,
Project/Location Masbate
Contractor Square N Construction & Supply
Part of Structure to be Estimated Volume
poured (cu.m.)
Station Limits/Section
Date of Pouring Time of Pouring
Request By:
Contractor:
NEIL L. NUÑEZ
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
OLIVER H. CASTILLO
Project Engineer
(Name and Signature
Accrediation No. PO144
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
NEIL L. NUÑEZ
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
LIONELLE L. ANDES
Project Engineer
(Name and Signature
Accrediation No. PO605
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Masbate 2nd District Engineering Office
Date: _________________
Request By:
Contractor:
NEIL L. NUÑEZ
(Name & Signature)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment (Screeder Quality of materials Used (Result of Design/
broom,etc.) Test Mix, Test Reports,etc.
Line and Grade alignment (form setting,
Lighting System
elevations, etc)
Required construction equipment Electrical Lay-out (Rough-ins/embedments)
Rebars sizes, spacing and number: Plumbing Lay-out (Rough-ins/embedments)
Rebars installation requirement Falsework.Formworks adequacy
Checked by:
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
HEZER H. CANTUBA
Project Engineer
(Name and Signature
Accrediation No. PO605