Pt A, Ch 2, Sec 9

SECTION 9 OTHER SURVEYS

1 Survey of inert gas and hydrocarbon 1.2.2 Additional requirements for gas storage units
blanketing installations Inert/drying gas systems, including the means for prevention
of backflow of storage vapour to gas-safe spaces, are to be
verified as being in good condition.
1.1 General
1.1.1 The requirements of the present Section are applica- 1.3 Intermediate survey
ble to all inert gas installations fitted on board floating stor-
age units, covered or not by additional service feature 1.3.1 Inert gas installations of all storage units
INERTGAS, and to hydrocarbon blanketing installations. Requirements of the present article are additional to those
of [1.2] for annual survey, which remain applicable.
1.2 Annual survey
For installations covered by additional service feature
1.2.1 All units INERTGAS, the following applies:
The survey of inert gas installation, as far as applicable, con- • main parts such as scrubbers, washing machines, blow-
sists of the: ers and deck water seals are to be overhauled for exam-
• general examination of the installation in operation con- ination
dition • valves are to be dismantled for examination
• external examination of the condition of piping and • pipe sections are to be dismantled for examination
components for signs of corrosion or gas leakage / efflu- except where representative UTM of the piping has
ent leakage been carried out to the surveyor's satisfaction.
• confirmation of the proper operation of inert gas blowers
• all alarms will be examined and tested.
• observation of the operation of the scrubber room venti-
lation system For installations other than those covered by additional
• checking of deck water seal for automatic filling and service feature INERTGAS, main parts such as scrubbers,
draining; checking for presence of water carry-over and washing machines, blowers and deck water seals are to be
checking the condition of the non-return valve overhauled for examination.
• examination of the operation of remotely operated or
1.3.2 Inert gas installations of gas storage units
automatically controlled valves and, in particular, the
flue gas isolating valve(s) In addition to requirements of [1.2] for annual survey, the
following applies:
• observation of a test of the interlocking feature of soot
blowers • the main equipment, such as inert gas producers, isolat-
• observation that the gas pressure regulating valve auto- ing valves, when fitted, are to be examined
matically closes when the inert gas blowers are secured • special attention is to be paid to low temperature nitro-
• checking, as far as practicable, the following alarms and gen storage plant and to the associated arrangement for
safety devices of the inert gas system using simulated protection of hull structure against nitrogen leakage.
conditions when necessary:
- high oxygen content of gas in the inert gas main 1.3.3 Hydrocarbon blanketing installations
- low gas pressure in the inert gas main Requirements of the present article are additional to those
of [1.2] for annual survey, which remain applicable.
- low pressure in the supply to the deck water seal
- high temperature of gas in the inert gas main The following applies:
- low water pressure to the scrubber • main parts such as blower, compressor, filter, gas regu-
- accuracy of portable and fixed oxygen measuring lating valve, pressure released valve, vacuum protection
equipment by means of calibration gas system and deck water seals are to be overhauled for
examination
- high water level in the scrubber
• valves are to be dismantled for examination
- failure of inert gas blowers
- failure of the power supply to the automatic control sys- • pipe sections are to be dismantled for examination
tem for the gas regulating valve and to the instrumenta- except where representative UTM of the piping has
tion for continuous indication and permanent recording been carried out to the surveyor's satisfaction.
of pressure and oxygen content in the inert gas main • all alarms and sensors will be examined and tested.
- high pressure of gas in the inert gas main.

December 2016 Bureau Veritas - Rules for Offshore Units 105