Pt A, Ch 2, Sec 9

1.4 Class renewal survey 3 Survey of additional service feature


POSA, POSA-HR, POSA JETTY and
1.4.1 The scope of class renewal survey of all inert gas POSA MU
installations is equivalent to the one laid down in [1.3] for
the intermediate survey.
3.1 Periodical surveys

3.1.1 Requirements regarding periodical surveys are given


2 Survey of additional class notation
in NR493 Classification of Mooring Systems for Permanent
AUTO and Mobile Offshore Units.

2.1 Annual survey 4 Survey of production units

2.1.1 The annual survey of classed automated installations 4.1 Application


consists of the:
4.1.1 Requirements given in the present Article for produc-
• examination of the machinery and automated plant tion units are additional to those given in the relevant Sec-
operational record (log book) entries - when such a log tions of this Chapter.
book exists - since the last survey in order to check the
past performance of the system, and to establish if cer- 4.2 Survey requirements for units assigned
tain parts have shown any irregularities in operation and with service notation production
which corrective measures have been taken
4.2.1 Annual survey and class renewal survey
• general examination of the control systems covered by The survey will consist of the:
the notation and random check, as far as possible taking • confirmation to be obtained that no new production
into account operating conditions, of the proper opera- equipment has been installed without previous notifica-
tion of main measuring, monitoring, alarm and auto- tion to the Society
matic shut-down system, in particular for essential • examination of the support structure of production plant
auxiliaries and its connection to the unit’s structure
• checking the fire detectors, in particular in machinery • verification of the risers foundations securing the riser to
spaces, and bilge flooding alarms the unit
• confirmation that production pipes, pumps, accessories
• checking a number of other alarms selected at random. and other production equipment are permanently fixed
• confirmation that piping systems for the process are sep-
2.2 Class renewal survey arated from other piping systems of the unit
• confirmation that process piping are not passing through
2.2.1 The class renewal survey of classed automated instal- any space other than those devoted to production pur-
lations consists of: poses
• verification of the arrangements made in order to ensure
• the examinations, tests and checks listed in [2.1] for the that substances which are flammable, toxic or are likely
annual survey, and to present a hazard due to reaction when mixed are kept
separated
• an additional program of examinations, tests and checks
• verification of the means provided to collect and safely
prepared in agreement with the Owner and based on
dispose liquid leaks from process equipment
operating data and on the experience of previous surveys.
• confirmation that drainage systems for safe areas are
All points which cannot be checked when the unit is in entirely separated and distinct from drainage systems
from hazardous areas
operation will be given particular consideration by this pro-
gramme. All alarm and safety devices will be tested and set- • checking, as far as practicable, of the alarm activation in
tings adjusted if necessary, except if evidence exists of the manned control rooms due to loss of pressurisation of
high pressure equipment
proper operation of these installations, or if they have been
subject of a systematic maintenance. • general visual examination of the condition of high
pressure equipment and piping. Checking for absence
Fire smoke detectors fitted in the machinery spaces are to of damages or excessive corrosion
be tested in similar conditions as for the first certificate • review of the records of inspection and tests of safety
delivery; alternatively, written evidence of reconditioning valves
and recalibrating by the Manufacturer or by his representa- • examination of the conditions of insulation of hot sur-
tive may be accepted. faces.

106 Bureau Veritas - Rules for Offshore Units December 2016