1.4 Class renewal survey 3 Survey of additional service feature
POSA, POSA-HR, POSA JETTY and 1.4.1 The scope of class renewal survey of all inert gas POSA MU installations is equivalent to the one laid down in [1.3] for the intermediate survey. 3.1 Periodical surveys
3.1.1 Requirements regarding periodical surveys are given
2 Survey of additional class notation in NR493 Classification of Mooring Systems for Permanent AUTO and Mobile Offshore Units.
2.1 Annual survey 4 Survey of production units
2.1.1 The annual survey of classed automated installations 4.1 Application
consists of the: 4.1.1 Requirements given in the present Article for produc- • examination of the machinery and automated plant tion units are additional to those given in the relevant Sec- operational record (log book) entries - when such a log tions of this Chapter. book exists - since the last survey in order to check the past performance of the system, and to establish if cer- 4.2 Survey requirements for units assigned tain parts have shown any irregularities in operation and with service notation production which corrective measures have been taken 4.2.1 Annual survey and class renewal survey • general examination of the control systems covered by The survey will consist of the: the notation and random check, as far as possible taking • confirmation to be obtained that no new production into account operating conditions, of the proper opera- equipment has been installed without previous notifica- tion of main measuring, monitoring, alarm and auto- tion to the Society matic shut-down system, in particular for essential • examination of the support structure of production plant auxiliaries and its connection to the unit’s structure • checking the fire detectors, in particular in machinery • verification of the risers foundations securing the riser to spaces, and bilge flooding alarms the unit • confirmation that production pipes, pumps, accessories • checking a number of other alarms selected at random. and other production equipment are permanently fixed • confirmation that piping systems for the process are sep- 2.2 Class renewal survey arated from other piping systems of the unit • confirmation that process piping are not passing through 2.2.1 The class renewal survey of classed automated instal- any space other than those devoted to production pur- lations consists of: poses • verification of the arrangements made in order to ensure • the examinations, tests and checks listed in [2.1] for the that substances which are flammable, toxic or are likely annual survey, and to present a hazard due to reaction when mixed are kept separated • an additional program of examinations, tests and checks • verification of the means provided to collect and safely prepared in agreement with the Owner and based on dispose liquid leaks from process equipment operating data and on the experience of previous surveys. • confirmation that drainage systems for safe areas are All points which cannot be checked when the unit is in entirely separated and distinct from drainage systems from hazardous areas operation will be given particular consideration by this pro- gramme. All alarm and safety devices will be tested and set- • checking, as far as practicable, of the alarm activation in tings adjusted if necessary, except if evidence exists of the manned control rooms due to loss of pressurisation of high pressure equipment proper operation of these installations, or if they have been subject of a systematic maintenance. • general visual examination of the condition of high pressure equipment and piping. Checking for absence Fire smoke detectors fitted in the machinery spaces are to of damages or excessive corrosion be tested in similar conditions as for the first certificate • review of the records of inspection and tests of safety delivery; alternatively, written evidence of reconditioning valves and recalibrating by the Manufacturer or by his representa- • examination of the conditions of insulation of hot sur- tive may be accepted. faces.
106 Bureau Veritas - Rules for Offshore Units December 2016