Pt A, Ch 2, Sec 9

4.3 Survey requirements for additional class 5.2 Swivel systems


notation PROC
5.2.1 Annual survey
The survey will consist of the:
4.3.1 Annual survey
• external inspection of pressure swivels, attached instru-
The survey will consist of the: mentation and safety devices
• external inspection of pressure vessels, heat exchangers, • external inspection of electrical swivels, attached instru-
attached instrumentation and safety devices mentation and safety devices
• visual inspection of piping systems including leak drain-
• visual inspection of piping systems including drainage age system
shut down and blowdown valves
• examination of sealing systems for leakage
• examination of pumps for excessive gland seal leakage • tests of protective devices
• external inspection of compressors and tests of protec- • examination of electrical cables and connectors and
tive devices performance of insulation resistance test of circuits
• inspection of support structure
• examination of flare and flare pilot system or cold vent- • examination of fire and gas detection systems
ing system
• examination of fire water system.
• examination of well control equipment
5.2.2 Class renewal survey
• inspection of support structure In addition to the survey performed as per [5.2.1], class
renewal survey will mainly consist in internal examination
• examination of fire and gas detection system
of swivels and pipings, where accessible and if considered
• examination of fire water system. necessary by the Surveyor.
Rotation tests are to be performed, as far as practicable,
4.3.2 Class renewal survey with measurement of starting and running moments.
In addition to the survey performed as per [4.3.1], class Safety systems will be tested for proper operation.
renewal survey will mainly consist in internal examination Planned shutdowns will be taken into account to minimise
of main process equipment (pressure vessels, exchangers, production break.
pumps, compressors, boilers,...) and pipings. In case of doubt, pressure test may be requested at the satis-
faction of the Surveyor.
Safety valves setting will be checked. Safety systems will be
tested for proper operation (i.e. ESD, process shutdown, fire
and gas detection, fire water). 5.3 Production riser systems

Configuration of the process system (equipment in parallel) 5.3.1 Annual survey


and planned shutdowns will be taken into account to mini- The survey will consist of the:
mise production break. • external examination of readily accessible parts
• external examination of riser handling system and other
In case of doubt, pressure test may be requested at the satis-
mechanical systems (where applicable)
faction of the Surveyor.
• external examination of riser valve system.

5 Survey of swivels and production 5.3.2 Class renewal survey


A specific programme of underwater survey is to be submit-
riser systems
ted to the Society, taking into account arrangement and
configuration of risers.
5.1 Application This programme is to include, as a minimum, general visual
inspection, by divers or ROV's, of selected lines, and close
5.1.1 The requirements given in the present Article for visual inspection of all critical areas.
swivels and production riser systems are additional to those If the risers are unclosed by a tube, boroscope examination
given in the relevant Sections of the present Chapter. shall be done.
The survey requirements for swivel systems, as described in Upon owner’s request, the specific inspection programme may
[5.2], are applicable to units assigned with the structural be worked out by the owner in cooperation with the Society
type notation offshore buoy and to surface units assigned Configuration of the process system (equipment in parallel)
with service notation production and/or oil storage and/or and planned shutdowns will be taken into account to mini-
liquefied gas storage, whenever the unit is fitted with such mise production break.
equipment.
In case of doubt, pressure or resistance tests may be
The survey requirements for production riser systems, as requested at the satisfaction of the Surveyor.
described in [5.3], are applicable to units assigned with In addition to the survey performed as per [5.3.1], the oper-
additional class notation RIPRO. ation of systems and the safety devices will be tested.

December 2016 Bureau Veritas - Rules for Offshore Units 107

S-ar putea să vă placă și