381333-402 B
! DANGER 1 ½ inch
approximate
De-energize the conductors before making any line
or auxiliary circuit connections. Be sure that the
Normal and Emergency line connections are in
proper phase rotation. Place the engine generator
starting control in the OFF position. Make sure cable spacer
engine generator is not in operation.
weight
floating
weight
! WARNING
Close the transfer switch enclosure door and For 3ATS the transfer switch should transfer back to the
tighten the screws before you test electrical normal position. The load on normal light should come
operation. on and the load on emergency light should go off.
For 3NTS press the transfer button for load retransfer.
Perform steps 1 through 5 at the right. Observe the status
If the retransfer to normal delay is
lights. See Figure 5. used the retransfer should occur
4 after a time delay. For immediate
● Black circle means light is on.
retransfer (bypass timer) press the
○ White circle means light is off. transfer button again.
NOTE: For 3NTS manually start the emergency generator at
the generator. Then press the transfer button for load transfer.
If the inphase transfer feature is activated, transfer may not
occur immediately. Transfer will occur when the phase
relationship between sources is correct. Press the transfer For 3ATS the unloaded running delay keeps the
generator running for a cool-down period. Then the
button again for load retransfer to normal, then manually stop
generator should stop and the emergency source
the generator at the generator. accepted light should go off. For 3NTS manually stop
Also see Group G Controller User’s Guide 381333-400 for 5 the generator at the generator (after a cool-down period).
inphase transfer and time delay settings in the controller.
This completes the functional test of the transfer switch.
Leave the engine-generator starting control in the automatic
position.
Troubleshooting
Problem
1 2 3
Operation Generator Voltage
INDEX
A I S
alert light, 7 inphase transfer feature, 5, 7 source acceptable lights, 4, 5
see User’s Guide 381333-400 inspection, 6 starting contacts, 3
ASCO Services Inc. installation, 2 starting control, 7
800-800-2726(ASCO) starting problem, 4, 7
customercare@asco.com L stopping problem, 7
automatic operation, 3ATS, 5 lights, 4, 5, 7
auxiliary circuits, 3 line connections, 2 T
load on emergency light, 4, 5 terminals, 2, 3
B load on normal light, 4, 5 testing power conductors, 2
battery, 7 lubrication, 6 time delays, 5, 7
transfer button, 5, 7
C M transfer problem, 7
cable spacers, 2 maintenance, 6 troubleshooting, 7
cables, power, 2 maintenance handle, 3, 6
connections, 2, 3 WARNING, 3, 6 V
controller, Group G manual load transfer, 6 voltage checks, 4, 7
see User’s Guide 381333-400 WARNING, 3, 6
controller ground, 3 manual operation, 3 W
cooldown, generator, 5, 7 WARNING, 3, 6 WARNING statements, 1, 3, 5, 6
manual transfer, 3NTS, 5
D membrane controls, 4, 5
DANGER statements, 1, 2, 4, 6 mounting, 2
E N
electrical operation, 5 non-automatic 3NTS, 5, 7
emergency source accepted light, normal source accepted light, 4, 5
4, 5 not in auto light, 7
engine starting contacts, 3
O
F operation, electrical, 5
foundation, 2
frequency, 7 P
functional test, 3 phase rotation, 4
preventive maintenance, 6
G problem, 7
generator, 3, 4, 5, 7
ground, controller, 3 R
rating label, 1
H replacement parts, 6
harness, 3 retransfer button, 5, 7
HELP 800-800-2726(ASCO)
customercare@asco.com