Documente Academic
Documente Profesional
Documente Cultură
KEYPAD
Tool Required :
Wrenches: 24 and 27
OK
Tools Required :
Wrench ? + ? (Power Adj. Screw)
Wrenches 24 and 27 (Main Relief Valve) POWER SHIFT OK
PRESS. TAP
Tetra ACTUATOR
ACTUATOR Gauge
- QUICK TEST - Pressure HORSEPOWER
PRESS. TAP Start to Incr
Gauge ADJ SCREW Cover Block
(60000 kPa) RIGHT
MAIN PUMP DIS. PRESS.
15700+/-500
DE STROKING PRESSURE
(Reference Point) ACTUATOR
Start to Incr
LEFT
Test Preparation : DIS. PRESS.
Oil temp. 55 15700+/-500
Dial : 5
Install fabricated cover block
DE STROKING PRESSURE CHART
Screw counterclockwise by tree turns
the Main Relief Valve
SYS. PRESS. PS PRESS. ACTUATOR
Connect a gauge to the pump delivery MODEL (required)
345C (required) PRESS.
pressure tap of the pump been tested
start to
Connect a gauge to the Power Shift 320D 12240 1300 decrease
pressure tap start to
Connect a tetra gauge to the actuator 323D 12240 1300 decrease
pressure tap of the pump been tested Pressure start to
DRIVE PUMP 324D 16800 1300
Gauge decrease
From the monitor, activate the Main Menu - PRESS. TAP (6000 kPa) start to
Service - Devise Test - and select Power 325D 16900 1300 decrease
Shift Pres
start to
Input a power shift press. of 1620 kPa at the 330D 15700 1620 increase (?)
power shift pressure gauge.
Slowly actuate "Stick in" and hold the
joys tick in this position. MESSAGE
MAIN CENTER
Observe the actuator press. gauge while RELIEF
turning clockwise the Main Relief Valve, VALVE
when actuator press. begins to increase
the Pump delivery press. should be KEYPAD
between 15200 and 16200 kPa.
Tools Required : 345C
P1 P2
A1
TO STICK II
A1 A2
STICK IN TO SWING
PILOT PRESSURE MODULATION
VALVE
B2
B2 B1 B1
P2
6000 kPa
P1
A1 A2 A2
6000 kPa
Pressure
Gauche
A1
BUCKET CLOSE STICK OUT
PRESS. REDUC. PRESS. REDUC.
VALVE VALVE
A1
2500 +/- 50 kPa
To Bkt close
Press. Reduc. Valve
Control Spool
STICK OUT PRIORITY PRESSURE REDUCING VALVE BUCKET CLOSE PRIORITY PRESSURE REDUCING VALVE
1. Install a (6000 kPa) pressure gauge in lines B1 or B2. 1. Install a (6000 kPa) pressure gauge in lines B1 or B2 and A1
2. Disconnect swing parking brake solenoid. 2. Disconnect swing parking brake solenoid.
3. Start engine and warm the hydraulic oil to 50 C 3. Start engine and warm the hydraulic oil to 50 C
4. Place engine speed dial in position "10". 4. Place engine speed dial in position "10".
5. Actuate the Boom up and Stick out pilot controls to full stroke. 5. Actuate the Boom up and Bucket close pilot controls to full stroke.
6. Modulate the Boom up pilot control until pressure at B1 or B2 gauge reads 1960 kPa. 5. Modulate the Boom up pilot control until pressure at B1 or B2 gauge reads 1960 kPa.
7. At the same time read the pressure at A2. Should be 1960 +/-100 kPa 6. At the same time read the pressure at A1. Should be1960 +/-100 kPa
MAIN MENU
SETTING
DEVICE TEST
OVERRIDE
CONFIGURATION OK
You can configure machine
ECM OK
TOOL PROGRAM