Documente Academic
Documente Profesional
Documente Cultură
KITA MELANGKAH TERUS UNTUK MEMBUAT PELANGGAN PUAS PADA SETIAP PERMINTAAN. KITA TAHU KEBUTUHAN MEREKA DAN
MENYEDIAKAN SOLUSI YANG BERKUALITAS DAN PELAYANAN PROFESIONAL, PROAKTIF, TEPAT GUNA DAN TEPAT WAKTU.
NO TOPIC NO TOPIC NO TOPIC
1 ACOMODATION 21 FINANCIAL 41 PLAT
2 ADMINISTRATOR / ADMINISTRASI 22 GAS 42 PROCUREMENT
3 BOILER 23 GENERAL AFFAIRS 43 PRODUCTION
4 BUILDING 24 GENERATOR 44 PROJECT
5 CALIBRATION 25 HEALTH 45 PUBLIC
6 CHEMICHAL 26 HEATING 46 PUMP
7 COAL 27 HUMAN RESOURCE / SUMBER DAYA MANUSIA 47 SAFETY
8 COMMUNICATION 28 INSPECTION 48 SUPPLY CHAIN
9 COMPRESSOR 29 INSTRUMENTATION 49 SYSTEM/SISTEM
10 CONTRACT 30 LEGAL 50 TECHNIC/TEHNIK
11 CONTROL 31 LOGISTIC 51 TURBIN
12 COOLING 32 MAINTENANCE 52 VECHILE
13 CORROSION 33 MANAGEMENT / MANAJEMEN 53 VIBRATION
14 DESIGN 34 MARKETING 54 WAREHOUSE
15 DRILLING 35 MATERIAL 55 WATER
16 ELECTRICAL 36 MEASURENMENT 56 WELDING
17 ENVIRONMENT 37 MECHANICAL 57 OIL REFINERY
18 EQUIPMENT 38 MINING
19 EXPLORATION 39 OPERATION / OPERASI
20 FAMILIARIZATION 40 PIPING
JUDUL - JUDUL DI BAWAH KAMI SELENGGARAKAN DI BANDUNG, JAKARTA, JOGYA, SURABAYA. BATAM DAN BALI
BOOKING KHUSUS TANGGAL DAN KOTA MINIMAL 4 PESERTA HUB MARKETING KHUSUS KAMI DI 0822 1449 2424 / training@iforbit.co.id
1 ACOMODATION / AKOMODASI
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 CATERING & ACCOMMODATION IN OIL & MINE INDUSTRY 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 CATERING SERVICE, HYGIENE & SANITATION 3 2-4 12-14 13-14 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 26-28 6.500.000
3 FINANCING CONDOTEL/HOTEL OPERATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 ADMINISTRATOR / ADMINISTRASI
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 EFFECTIVE COMPETENCY MODELLING & REPORTING 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 EFFECTIVE LINE BALANCING 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 EFFECTIVE MASTER OF CEREMONY (MC) 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
5 EFFECTIVE PRESENTATION SKILLS 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 ENGLISH REPORT WRITING 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
8 EXCELLENT COMMUNICATION AT WORK 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 FAILURE ANALYSIS METHODS AND CASES 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
10 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
12 FILLING SYSTEM FOR SECRETARY 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 GOOD CORPORATE GOVERNANCE 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
14 HOW TO IMPROVE BUSINESS PERFORMANCE 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
16 ICE BREAKING AND ENERGIZERS 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
18 INFLUENTIAL LEADERSHIP EXCELLENCE 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 INTERPERSONAL COMMUNICATION SKILL 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
20 COMMUNICATION SKILL AND INTERACTION 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
21 NEGOTIATION SKILL 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
22 SUPERVISORY SKILL 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
23 LEADER AS A C.O.A.C.H 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
24 LEADERSHIP FOR QUALITY MANAGEMENT 3 22-24 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
25 MANAGING STRESS FOR PRACTICAL PURPOSE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
26 ENVIROMENTAL MANAGEMENT 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
27 LIBRARY MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
28 MC (MASTER OF CEREMONY) 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
29 MEDIA RELATION AND COMMUNICATION 3 22-24 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
30 MEDIA RELATIONS STRATEGY AND EXECUTIONS 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
31 MEDIA RELATIONS STRATEGY FOR EFFECTIVE PROMOTION 3 22-24 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
32 PROFESSIONAL SECRETARY COMPETENSI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
33 TEAM WORK DEVELOPMENT 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
34 SUPERVISORY IMPROVEMENT FUNCTION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
35 BASIC MENTAL 3 22-24 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
36 NEGOTIATION SKILL FOR PURCHASING STAFF 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
37 OFFICE AUTOMATION 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
38 DECISION MAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
39 PERSONAL EXCELLENCE: WINNER ATTITUDE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
41 PLAN LAY OUT OFFICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
42 POWERFUL PRESENTATION EXCELLENCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
44 PRESENTATION SKILL FOR THE BEGINNERS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
45 PROBLEM SOLVING & DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
46 SERVICE EXCELLENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
47 SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FOR LIFE 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
48 SPARE PARTS MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
51 STRATEGIC PERFORMANCE MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
52 STRATEGIC PLANNING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
53 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
54 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
55 WORKING AS A TEAM EXCELLENCE 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
56 WORKLOAD ANALYSIS 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
57 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
58 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
61 vLEADERSHIP DEVELOPMENT PROGRAM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
62 LEADERSHIP FOR FOREMAN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
63 POSITIVE FIGHTER FOR SALES PEOPLE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
64 POWERFUL COMMUNICATION SKILL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
65 POWERFUL PUBLIC SPEAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
66 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
67 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
68 SERVICE WITH DELIGHT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
69 BUILDING A TEAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
70 CAREER PLANNING SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
71 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
72 EFFECTIVE PERFORMANCE APPRAISAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
73 EFFECTIVE TRAINING MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
74 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8-10
3
75 JOB COMPETENCY PROFILING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
76 MEASURING TRAINING IMPACT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
77 PERFORMANCE BASED PAY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
78 SELF-EFFECTIVENESS & DEVELOPMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
79 STRATEGIC HUMAN RESOURCES MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
81 ASPECTS OF CONTRACT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
82 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 8-10 12-14 12-15 16-18 7-9 25-27 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
83 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
84 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
85 ADMINISTRASI PERKANTORAN 3 8-10 12-14 12-15 16-18 7-9 25-27 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000
86 ACCOUNT PAYABLE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
3 BOILER
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
2 BOILER WATER TREATMENT 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 BOILER: OPERATION & MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 BOILER: OPERATION, MAINTENANCE & TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
6 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 BUILDING / BANGUNAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 ENERGY CONSERVATION TECHNIC ON BUILDING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 BUILDING A TEAM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
CORPORATE BUILDING FOR INTERNAL ORGANISATION CULTUR
4 4 8.500.000
AND ETIC DEVELOPEMENT 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20
5 CALLIBRATION / CALIBRA SI
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 CALLIBRATION OF MEASURING TOOL 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 INSTRUMENTATION AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 SYSTEM MEASUREMENT AND CALIBRATION 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 CHEMICAL / KIMIA
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 CHEMICAL ENGINEERING FUNDAMENTALS FOR NON ENGINEER 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7-9 25-27
4 SIMULATION PROCESS CHEMICAL TECHNIC USING HYSYS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 WATER TREATING AND CHEMICALS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
7 COAL
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 COAL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 COATING SYSTEM AND PROTECTION CORROSION 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 COMMUNICATION / KOMUNIKASI
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
2 INTERPERSONAL COMMUNICATION SKILL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 MEDIA RELATION AND COMMUNICATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
4 EXCELLENT COMMUNICATION AT WORK 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 POWERFUL COMMUNICATION SKILL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 COMPRESSOR
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
2 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
CENTRIFUGAL COMPRESSOR PERFORMANCE & CONDITION
3 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
EVALUATION
10 CONTRACT / KONTRAK
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 CONTRACT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 ASPECTS OF CONTRACT 3 22-24 5-7 26-18 16-18 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7-9 25-27
3 PROCUREMENT AND CONTRACT MONITORING 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
11 CONTROL
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 BASIC TECHNICAL CONTROL FOR INDUSTRY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 FLOW MEASUREMENT AND CONTROL ELEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 HYDRAULIC CONTROL SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 HYDRAULIC/PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
7 INDUSTRIAL AUTOMATION & CONTROL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
8 MANUFACTURING PLANNING & CONTROL 3 22-24 5-7 26-18 16-18 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7-9 25-27
9 MICRO CONTROLLER APPLICATION IN INDUSTRIAL PLANTS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
11 PROCESS CONTROL INSTRUMENTATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
12 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
13 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
12 COOLIN G
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 AC CONTROLLING SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 AIR CONDITIONING AND HVAC 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
4 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 BASIC REFRIGERATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 CHILLER AND COOLING TOWER: DESIGN AND OPERATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
9 PRACTICAL AND ADVANCED COURSE ON HVAC SYSTEMS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
REFRIGERATION : OPERATION, MAINTENANCE AND 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
10 5 9.500.000
TROUBLESHOOTING
11 RELIABILITAS SISTEM : TO EVALUATE MAINTENANCE RESULT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
12 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 CORROSION / KOROSI
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 COATING SYSTEM AND PROTECTION CORROSION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 CORROSION AND CATHODIC PROTECTION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
4 CORROSION MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 INSPECTION AND CORROTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 NON DESTRUCTIVE TEST (NDT) 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
8 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
14 DESIGN / DESAIN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BELT CONVEYOR : TECHNOLOGY, DESIGN CALCULATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
DESIGN OF JIGS AND FIXTURES ( ALAT BANTU CEKAM DAN 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13
2 4 8.500.000
PEGANG)
5 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
15 DRILLING/PENGEBORAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
BASIC DRILLING ENGINEERING AND HEALTH, SAFETY & 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
1 5 9.500.000
ENVIRONMENTAL CONSIDERATION
2 DRILLING AND EXPLOSIVE IN MINING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 DRILLING ENGINEERING AND WELL PLANING 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
16 ELECTRICAL / LISTRIK
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
ADVANCE COURSE ON LIGHTNING PROTECTION AND 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
1 5 9.500.000
GROUNDING SYSTEM
2 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
3 ARC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
4 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 AUDIT ENERGY AND POWER SYSTEM MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 BASIC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
9 ELECTRICAL POWER SYSTEM ANALYSIS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
10 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
11 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
12 ELECTRICITY POWER SUBSTATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
14 MANUAL METAL ARC WELDING (LAS LISTRIK) 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
15 POWER PLANT ELECTRICAL DISTRIBUTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
16 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
17 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
20 ELECTRICAL MOTOR CONTROL SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
21 TECHNIC INSTALATION AND ELECTRICAL PROTECTION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
23 MECHANICAL POWER TRANSMISSION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
24 SAY NO!!! TO GIVE UP 3 10-12 6.500.000
2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23
25 MECHANIC TRANMISION VOLT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
26 MEDIUM VOLTAGE PANEL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
2 EARTH MOVEMENT MECHANICAL 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 EFFLUENT PRODUCED WASTE WATER 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 H2S AWARENESS 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
6 HSE AUDIT TECHNIQUES 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
8 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 WATER TREATING AND CHEMICALS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
18 EQUIPMENT / PERALATA N
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BELT CONVEYOR : OPERATION & MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 BASIC GAS ENGINE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
3 BASIC MACHINERY VIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 BASIC PRINCIP LUBRICATION AND APLICATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 BEARING AND OIL LUBRICATION FOR MACHINERY 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
6 BELT CONVEYOR : TECHNOLOGY, DESIGN CALCULATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
7 BELT CONVEYOR MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
CENTRIFUGAL COMPRESSOR PERFORMANCE & CONDITION 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
8 4 8.500.000
EVALUATION
9 CONVEYOR: OPERASI DAN PERAWATAN 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
10 CONVEYOR: OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
DESIGN OF JIGS AND FIXTURES ( ALAT BANTU CEKAM DAN 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13
11 4 8.500.000
PEGANG)
DESIGN OF PRESS AND FORMING TOOL (ALAT PENEKAN DAN 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
13 4 8.500.000
PEMBENTUK)
14 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
15 DYNAMIC OF MACHINE TOOLS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
16 EARTH MOVEMENT MECHANICAL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
17 FLANGE AND JOINT INTEGRITY 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
18 HAND TOOL UTILIZATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
19 HEAVY DUTY EQUIPMENT 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
20 HEAVY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
21 HEAVY EQUIPMENT MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
22 HYDRAULICS AND PNEUMATICS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
23 KINEMATICS AND DYNAMICS OF MACHINERIES 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
24 LUBRICATION AND BEARING TECHNOLOGY 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
25 MACHINERY NOISE AND PROBLEM SOLVING 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
26 MACHINERY VIBRATION ANALYSIS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
27 MAINTENANCE OF MACHINE TOOLS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
28 MATERIAL SELECTION MACHINE COMPONENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
29 OFFSHORE WELLHEAD PLATFORM OPERATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
30 OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
31 PIGGING OPERATIONS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
32 PREVENTIVE MAINTENANCE GENERATOR 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
33 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
34 PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
35 ROOT CAUSE ANALYSIS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
ROTATING EQUIPMENTS: OPERATION, MAINTENANCE, 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
36 4 8.500.000
TROUBLE SHOOTING AND ANALYSIS
37 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
38 SURFACE PRODUCTION OPERATION & EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
39 SYSTEM MEASUREMENT AND CALIBRATION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
40 TESTING OF MACHINE TOOLS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
41 THEORY AND APPLICATION BELT CONVEYOR 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
19 EXPLORATION / EKSPLORASI
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 FORMATION DAMAGE AND WELL STIMULATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
2 COAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 COATING SYSTEM AND PROTECTION CORROSION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 DRILLING AND EXPLOSIVE IN MINING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 MINING VENTILATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
8 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
20 FAMILIARIZATION / PENGENALAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
BASIC RESERVOIR ENGINEERING FOR NON PETROLEUM 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
1 5 9.500.000
ENGINEER
2 CHEMICAL ENGINEERING FUNDAMENTALS FOR NON ENGINEER 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
4 GEOLOGY FOR NON GEOLOGIST 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 PETROLEUM ENGINEERING FOR NON PETROLEUM ENGINEERS 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
7 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
21 FINANCIAL / KEUANGAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
ADVANCE MAINTENANCE PLANNING, SCHEDULLING, 22-24 5-7 26-18 16-18 16-18 6-8 17-19 1-3 5-7 17-19
1 3 6.500.000
AUDITING, BENCHMARKING & IMPROVEMENT 7-9 25-27
2 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINNER) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 BASIC PROCUREMENT & PURCHASING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 COST MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 BASIC TREASURY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 E-PROCUREMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
8 INVENTORY AND WAREHOUSE MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
10 MAINTENANCE: SYSTEM AND COST 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
NATURAL GAS RESERVOIR, PROCESSING AND ECONOMICS 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
11 5 9.500.000
ASPECTS
12 TAX AND IMPLEMANTATION PROCEDURE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
13 PROCUREMENT AND CONTRACT MONITORING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
14 RISK MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
15 SUPPLY CHAIN MANAGEMENT (SCM) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
16 TAX AND FINANCIAL CONTROL 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
17 SYSTEM AND COST PRODUCTION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
18 TOTAL COST OF OWNERSHIP ANALYSIS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
19 WORKLOAD ANALYSIS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
20 PRODUCTION PLAN & INVENTORY CONTROL (PPIC) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
21 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
22 IT RISK MANAGEMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
23 PROJECT COST MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
22 GAS
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 BASIC GAS ENGINE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
FLUID FLOW MEASUREMENT AND METER PROVING IN OIL AND 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
3 4 8.500.000
GAS INDUSTRY
GAS AND STEAM TURBINE : OPERATION, MAINTENANCE AND 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
4 5 9.500.000
TROUBLESHOOTING
5 GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 GAS METAL ARC WELDING (LAS MIG/MAG) 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
7 GAS TUNGSTEN ARC WELDING (LAS TIG) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
GAS TURBINE : PRINCIPLES, INSPECTION, OPERATION, 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
8 5 9.500.000
MAINTENANCE AND TROUBLESHOOTING
10 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BUILDING A TEAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 BASIC MENTAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
3 DECISION MAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 ENGLISH REPORT WRITING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 ENVIROMENTAL MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 EXCELLENT COMMUNICATION AT WORK 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 FILLING SYSTEM FOR SECRETARY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
9 HOW TO IMPROVE BUSINESS PERFORMANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
11 ICE BREAKING AND ENERGIZERS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
13 INFLUENTIAL LEADERSHIP EXCELLENCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
14 INTERPERSONAL COMMUNICATION SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
15 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
16 LEADERSHIP FOR QUALITY MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
17 LIBRARY MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
18 MANAGING STRESS FOR PRACTICAL PURPOSE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 MC (MASTER OF CEREMONY) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
20 MEDIA RELATION AND COMMUNICATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
21 MEDIA RELATIONS STRATEGY AND EXECUTIONS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
22 MEDIA RELATIONS STRATEGY FOR EFFECTIVE PROMOTION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
23 NEGOTIATION SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
24 NEGOTIATION SKILL FOR PURCHASING STAFF 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
25 OFFICE AUTOMATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
26 POWERFUL PRESENTATION EXCELLENCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
27 PRACTICAL CUSTOMER SERVICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING
28 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
STAFF (USING MICROSOFT POWER POINT)
29 PRESENTATION SKILL FOR THE BEGINNERS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
30 PROBLEM SOLVING & DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
31 PROFESSIONAL SECRETARY COMPETENSI 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
32 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
33 SUPERVISORY IMPROVEMENT FUNCTION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
34 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
35 SUPERVISORY SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
36 TEAM WORK DEVELOPMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
37 TECHNIC FOR HUMAN RELATIONS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
38 WORKING AS A TEAM EXCELLENCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
39 WORKLOAD ANALYSIS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
40 CUSTOMER SATIS FACTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
41 HANDLING CUSTOMER COMPLANT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
24 GENERATOR
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
2 GENERATOR: TEKNOLOGY, OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
4 PREVENTIVE MAINTENANCE GENERATOR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
25 HEALTH / KESEHATAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 CATERING SERVICE, HYGIENE & SANITATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 STRATEGIC HEALTH INFORMATION SYSTEM IN HOSPITAL 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
26 HEATING / PEMANASAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
2 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 MINING VENTILATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 ACHIEVEMENT MOTIVATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
6 ADVANCE SUPERVISORY MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7 LEADERSHIP DEVELOPMENT PROGRAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 LEADERSHIP FOR FOREMAN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
9 POSITIVE FIGHTER FOR SALES PEOPLE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
10 POWERFUL COMMUNICATION SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
11 POWERFUL PUBLIC SPEAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 2-4 6.500.000
12 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
14 SERVICE WITH DELIGHT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
15 PRACTICAL BALANCED SCORECARD 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
16 ENJOYMENT AND PRODUCTIFE AFTER RETIREMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 17-20 8.500.000
17 BOOST YOUR CREATIVITY IN THINKING: MIND MAP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
18 COACHING AND COUNSELING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 COACHING AND COUNSELING (MONITORING) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
20 BUILDING A TEAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
COMMUNICATION, ASSERTIVENESS AND CONFLICT
21 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
MANAGEMENT
22 CAREER PLANNING SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
24 COMPENSATION SYSTEM DEVELOPMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
25 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
26 EFFECTIVE PERFORMANCE APPRAISAL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
27 EFFECTIVE TRAINING MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
28 JOB COMPETENCY PROFILING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
29 MEASURING TRAINING IMPACT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
31 PERFORMANCE BASED PAY 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
32 SELF-EFFECTIVENESS & DEVELOPMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
33 STRATEGIC HUMAN RESOURCES MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
34 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
35 WORKLOAD ANALYSIS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
36 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
37 BASIC MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
38 DEVELOPING EXCELLENT INTERNAL TRAINER 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
39 DEVELOPING HIGH PERFORMANCE TEAMS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
41 EFFECTIVE COMMUNICATION SKILL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
42 EFFECTIVE COMPETENCY MODELLING & REPORTING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
43 EFFECTIVE LINE BALANCING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
44 EFFECTIVE MASTER OF CEREMONY (MC) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
45 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
46 EFFECTIVE PRESENTATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
47 EMOTIONAL QUETIENTS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
48 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
49 ENTREPRENEURSHIP 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
50 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
52 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
53 EXCELLENT COMMUNICATION AT WORK 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
55 FILLING SYSTEM FOR SECRETARY 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
56 GOOD CORPORATE GOVERNANCE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
57 HR MANAGEMENT OF CHANGE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
58 ICE BREAKING AND ENERGIZERS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
60 INFLUENTIAL LEADERSHIP EXCELLENCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
61 INTERPERSONAL COMMUNICATION SKILL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
62 LEADERSHIP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
63 COMMUNICATION SKILL AND INTERACTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
64 NEGOTIATION SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
65 SUPERVISORY SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
66 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
67 LEADERSHIP FOR QUALITY MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
68 MAN POWER PLANNING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
MANAGEMENT OF OUTSOURCE STAFF HOUSING AND 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
69 4 8.500.000
CATERING SERVICES
70 MANAGING STRESS FOR PRACTICAL PURPOSE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
71 ENVIROMENTAL MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
72 PROFESSIONAL SECRETARY COMPETENSI 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
73 TEAM WORK DEVELOPMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
74 SUPERVISORY IMPROVEMENT FUNCTION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
75 BASIC MENTAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
76 NEGOTIATION SKILL FOR PURCHASING STAFF 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
77 OFFICE AUTOMATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
78 TRAINING FOR SENIOR MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
79 DECISION MAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
80 PERFORMANCE MANAGEMENT 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
81 PERSONAL EXCELLENCE: WINNER ATTITUDE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
83 PLAN LAY OUT OFFICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
84 PLANNING AND ORGANIZE TRAINING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
85 POWERFUL PRESENTATION EXCELLENCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
86 PROBLEM SOLVING & DECISION MAKING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
87 SERVICE EXCELLENT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
88 SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FOR LIFE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
89 SEVEN HABITS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
90 SPARE PARTS MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
STRATEGIC HUMAN RESOURCE MANAGEMENT AND 22-24 5-7 26-18 16-18 16-18 6-8 17-19 1-3 5-7 17-19
92 3 6.500.000
ORGANIZATION DEVELOPMENT 7-9 25-27
93 STRATEGIC PERFORMANCE MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
94 STRATEGIC PLANNING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
95 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
96 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
97 TECHNIC FOR HUMAN RELATIONS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
98 TRAINING DEVELOPMENT MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
99 TRAINING OF TRAINER (TOT) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
100 TRAINING OF TRAINERS SAFETY 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
101 TRAINING OF TRAINER (TOT) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
102 WORKING AS A TEAM EXCELLENCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
28 INSPECTION / INSPEKSI
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 INSPECTION AND CORROTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 RELIABILITY CENTERED MAINTENANCE (RCM) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
7 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
2 ADVANCE INSTRUMENTATION MEASUREMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 CALLIBRATION OF MEASURING TOOL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 FLOW MEASUREMENT AND CONTROL ELEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
FLUID FLOW MEASUREMENT AND METER PROVING IN OIL AND 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
6 4 8.500.000
GAS INDUSTRY
7 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
9 OIL & GAS: MEASUREMENT AND CALCULATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
10 PROCESS CONTROL AND INSTRUMENTATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
11 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
13 VIBRATION ANALYSIS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
30 LEGAL / HUKUM
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 ASPECTS OF CONTRACT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 2-4 6.500.000
2 BUSINESS PROCESS MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
4 CONTRACT MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
5 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 ISO 31000 - RISK MANAGEMENT : PRINCIPLES AND GUIDELINES 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7 ISO 9001 2015 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 IT RISK MANAGEMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
10 PROCUREMENT AND CONTRACT MONITORING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
11 PROJECT RISK MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
12 RISK INVESTMENT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
13 RISK MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
14 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
15 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
16 STRATEGIC MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM ( 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
17 5 9.500.000
SCADA )
31 LOGISTI C
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 AIR AND SEA CARGO HANDLING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 FLIGHT OPERATION MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
3 HAZARDOUS MATERIAL HANDLING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
5 INVENTORY AND WAREHOUSE MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
8 LOGISTIC MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
9 LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 MATERIAL HANDLING & APLICATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
11 MATERIAL HANDLING & PACKAGING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
12 MATERIAL MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
13 MATERIAL MANAGEMENT FOR PROJECT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
15 PLANNING AND MANAGING INVENTORIES IN A SUPPLY CHAIN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
16 PRACTICAL SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
17 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
18 SUPPLY CHAIN MANAGEMENT (SCM) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 SUPPLY MARKET ANALYSIS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
21 TRANSPORTATION MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
22 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
23 WAREHOUSING & DISTRIBUTION MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
32 MAINTENANCE / PERAWATAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 BASIC PRINCIP LUBRICATION AND APLICATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 BEARING AND OIL LUBRICATION FOR MACHINERY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
5 BELT CONVEYOR : OPERATION & MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 BELT CONVEYOR MAINTENANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
9 BOILER: OPERATION & MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
10 BOILER: OPERATION, MAINTENANCE & TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
11 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
13 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
CONTROL VALVE: OPERATION, MAINTENANCE, AND 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
14 4 8.500.000
TROUBLESHOOTING
15 CONVEYOR: OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
16 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
GAS TURBINE: OPERATION, MAINTENANCE AND 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
20 4 8.500.000
TROUBLESHOOTING
21 GENERATOR: TEKNOLOGY, OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
22 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
24 HEAVY EQUIPMENT MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
HIGH PRESSURE PUMP (HPP): OPERATION, MAINTENANCE AND 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
25 5 9.500.000
TROUBLESHOOTING
26 HVAC SYSTEM: OPERATION AND MAINTENANCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
28 LUBRICATION AND BEARING TECHNOLOGY 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
29 MACHINERY VIBRATION ANALYSIS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
31 MAINTENANCE MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
32 MAINTENANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
34 MAINTENANCE OF MACHINE COMPONENTS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
35 MAINTENANCE OF MACHINE TOOLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
36 MAINTENANCE PLANNING AND SCHEDULING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
37 MAINTENANCE STRATEGIC PLANNING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
38 MAINTENANCE SYSTEM AND DOCUMENTATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
39 MAINTENANCE: SYSTEM AND COST 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
40 MANAGING MAINTENANCE RESOURCES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
42 MECHANICAL MAINTENANCE TECHNIC 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
43 MODERN MAINTENANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
44 OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
45 PREDICTIVE MAINTENANCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
47 PREVENTIVE MAINTENANCE GENERATOR 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
48 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
49 PUMP : OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
52 PUMP OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
PUMP SELECTION, DESIGN AND OPERATION FOR OIL AND GAS 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
53 5 9.500.000
SURFACE PRODUCTION FACILITIES
REFRIGERATION : OPERATION, MAINTENANCE AND 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
54 5 9.500.000
TROUBLESHOOTING
55 RELIABILITAS SISTEM : TO EVALUATE MAINTENANCE RESULT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
RELIABILITY CENTERED MAINTENANCE & RISK BASED
56 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
INSPECTION
57 RELIABILITY CENTERED MAINTENANCE (RCM) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
58 RISK MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
59 ROOT CAUSE ANALYSIS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
61 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
62 SIX SIGMA CHAMPIONS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
64 TECHNIC MACHANICAL MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
65 TECHNIC VECHILES MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
66 TECHNOLOGY ENGINE MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
67 TOTAL PRODUCTIVE MAINTENANCE (TPM) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
68 TRAFO: PRINCIPLES, APPLICATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
70 VIBRATION ANALISIS IN ROTARY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
33 MANAGEMENT / MANAJEMEN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 ADVANCE SUPERVISORY MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR
2 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
EXECUTIVES
3 ASPECTS OF CONTRACT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
6 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
7 CONTRACT MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 COST MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
11 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
12 BASIC MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
13 EFFECTIVE EXECUTIVE SECRETARY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
14 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
15 ENGLISH REPORT WRITING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 FLOW MEASUREMENT AND CONTROL ELEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
20 GOOD CORPORATE GOVERNANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
21 HEAVY EQUIPMENT MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
22 HOW TO IMPROVE BUSINESS PERFORMANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
23 HR MANAGEMENT OF CHANGE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
25 ICE BREAKING AND ENERGIZERS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
27 INFLUENTIAL LEADERSHIP EXCELLENCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (I T I 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
29 4 8.500.000
L) VERSION 3.1
30 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
32 INVENTORY AND WAREHOUSE MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
33 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
34 NEGOTIATION SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
35 SUPERVISORY SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
36 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
37 LEADERSHIP FOR QUALITY MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
38 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
39 LOGISTIC MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
40 LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
42 MANAGEMENT PROJECT : STRATEGI DAN IMPLEMENTASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
43 TIME MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
44 LIBRARY MANAGEMENT 4 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 8.500.000
45 RISK INVESTMENT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
46 STRATEGIC MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
47 MARKETING MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
48 MODERN MAINTENANCE MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
50 TRAINING FOR SENIOR MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
51 PERFORMANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
52 PLAN LAY OUT OFFICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
53 POWER MANAGEMENT SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
54 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
56 STRATEGIC PERFORMANCE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
57 STRATEGIC PLANNING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
58 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
59 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
60 SUPPLY CHAIN MANAGEMENT (SCM) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
61 TRAINING DEVELOPMENT MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
62 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
63 PRINCIPLE OF MANUFACTURING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
64 PRINCIPLE OF OPERATION PLANNING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
65 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
66 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
67 CUSTOMER SERVICE EXCELLENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
68 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
69 LEADERSHIP FOR FOREMAN 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
70 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
71 ADVANCED PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
72 ESSENTIALS OF PROJECT MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
73 PROJECT COST MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
74 PROJECT MANAGEMENT FUNDAMENTALS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
75 PROJECT RISK MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
76 SOFTWARE PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
77 BUSINESS PROCESS MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
78 ISO 31000 - RISK MANAGEMENT : PRINCIPLES AND GUIDELINES 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
79 ISO/IEC 9000 : 2008 QUALITY MANAGEMENT SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
80 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
81 ISO/IEC 20000: IT SERVICE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
82 ISO/IEC 38500: IT-GOVERNANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
83 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
85 COMPETENCY-BASED HUMAN RESOURCES MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
86 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
87 EFFECTIVE PERFORMANCE APPRAISAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
88 EFFECTIVE TRAINING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
89 PROJECT MANAGEMENT (PM) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
34 MARKETING / PEMASARA N
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
3 CUSTOMER SERVICE EXCELLENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 MARKETING MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
5 PLANT LAYOUT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 POSITIVE FIGHTER FOR SALES PEOPLE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 PRACTICAL CUSTOMER SERVICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
9 PRESENTATION SKILL FOR THE BEGINNERS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
10 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
11 SERVICE WITH DELIGHT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
12 SUPPLY MARKET ANALYSIS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
35 MATERIAL / BAHAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 PRODUCTION PLAN & INVENTORY CONTROL (PPIC) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 HAZARDOUS MATERIAL HANDLING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR,
POTENSI
6 4 8.500.000
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13
INSTRUMENTATION
36 MEASURENMENT / PENGUKURAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
2 ADVANCE INSTRUMENTATION MEASUREMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 FLOW MEASUREMENT AND CONTROL ELEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
6 OIL & GAS: MEASUREMENT AND CALCULATION 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
7 PRODUCTION HANDLING SEPARATION AND MEASUREMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
8 SYSTEM MEASUREMENT AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
9 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
37 MECHANICAL / MEKANI K
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
3 BASIC MECHANICAL 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 BEARING AND OIL LUBRICATION FOR MACHINERY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
6 CAD FOR MECHANICAL: AUTOCAD OR CATIA 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
7 MECHANIC TRANMISION VOLT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
8 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
38 MINING
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 COAL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 COATING SYSTEM AND PROTECTION CORROSION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 DRILLING AND EXPLOSIVE IN MINING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
7 MINING VENTILATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
8 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
39 OPERATION / OPERASI
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 MANUFACTURING PLANNING & CONTROL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 AC CONTROLLING SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
4 PRINCIPLE OF MANUFACTURING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 PRINCIPLE OF OPERATION PLANNING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 PRODUCTION PLAN & INVENTORY CONTROL (PPIC) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
10 ADVANCED OIL AND GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
11 LEADERSHIP FOR FOREMAN 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
12 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
13 AIR AND SEA CARGO HANDLING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
14 AIR CONDITIONING AND HVAC 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
15 HEAT EXCHANGER : OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
16 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
17 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR
18 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
EXECUTIVES
19 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
20 ADVANCED PROJECT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
21 VIBRATION ANALISIS IN ROTARY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
22 ESSENTIALS OF PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
23 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
24 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
26 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
27 PROJECT LEADERSHIP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
28 PROJECT RISK MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
29 BASIC REFRIGERATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
31 BASIC SURFACE SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
32 BEARING AND OIL LUBRICATION FOR MACHINERY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
33 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
34 BELT CONVEYOR : OPERATION & MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
37 BOILER: OPERATION, MAINTENANCE & TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
38 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
39 BOOST YOUR CREATIVITY IN THINKING: MIND MAP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
40 NON DESTRUCTIVE TEST (NDT) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
41 CAD FOR MECHANICAL: AUTOCAD OR CATIA 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
44 CATERING & ACCOMMODATION IN OIL & MINE INDUSTRY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
45 CATERING SERVICE, HYGIENE & SANITATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
46 BASIC GAS ENGINE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
47 BELT CONVEYOR : TECHNOLOGY, DESIGN CALCULATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
49 BOILER: OPERATION & MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
50 CENTRIFUGAL PUMP AND SEAL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
51 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
52 CHILLER AND COOLING TOWER: DESIGN AND OPERATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
53 BELT CONVEYOR MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
54 TOTAL PRODUCTIVE MAINTENANCE (TPM) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
55 MECHANIC TRANMISION VOLT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
56 CAREER PLANNING SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
57 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
59 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
60 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
62 CONVEYOR: OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
63 CORROSION AND CATHODIC PROTECTION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
64 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
65 DANGEROUS GOODS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
66 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
67 BASIC TECHNICAL CONTROL FOR INDUSTRY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
69 GENERATOR: TEKNOLOGY, OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
73 MECHANICAL MAINTENANCE TECHNIC 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
DESIGN OF JIGS AND FIXTURES ( ALAT BANTU CEKAM DAN 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
74 4 8.500.000
PEGANG)
77 OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
DISTRIBUTED CONTROL SYSTEM (DCS): PRINCIPLES AND 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
78 5 9.500.000
APPLICATION
79 ALIGNMENT, LEVELLING AND ROTOR BALANCING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
81 DRILLING ENGINEERING AND WELL PLANING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
82 ALARM AND PROTECTIVE DEVICES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
83 BASIC MACHINERY VIBRATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
84 BASIC VIBRATION ANALYSIS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
87 CORROSION MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
88 FLANGE AND JOINT INTEGRITY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
89 INDUSTRIAL AUTOMATION & CONTROL 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
90 ADVANCE INSTRUMENTATION MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
91 MACHINERY VIBRATION ANALYSIS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
92 MAINTENANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
94 PROCESS CONTROL INSTRUMENTATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
95 SCADA FOR ENGINEER 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
96 SCADA FOR OPERATOR & TEKNICIAN 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
97 ELECTROPLATING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
98 SYSTEM MEASUREMENT AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
99 THEORY AND APPLICATION BELT CONVEYOR 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
100 ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
101 FAILURE ANALYSIS METHODS AND CASES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
102 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
103 FLIGHT OPERATION MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
104 FINANCING CONDOTEL/HOTEL OPERATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
105 FLOW MEASUREMENT AND CONTROL ELEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
107 FORMATION DAMAGE AND WELL STIMULATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
109 GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
110 GAS METAL ARC WELDING (LAS MIG/MAG) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
111 GEOLOGY FOR NON GEOLOGIST 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
113 H2S AWARENESS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
114 HAND TOOL UTILIZATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
115 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
116 HAZARDOUS MATERIAL HANDLING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
118 HEAVY DUTY EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
119 HEAVY EQUIPMENT MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
122 HVAC SYSTEM: OPERATION AND MAINTENANCE 5 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 9.500.000
123 HYDRAULIC/PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
124 HYDRAULICS AND PNEUMATICS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
125 INDUSTRIAL COMBUSTION AND BURNER 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
126 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
127 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
128 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
129 INSTRUMENTATION AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
132 INVENTORY AND WAREHOUSE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
133 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
134 KINEMATICS AND DYNAMICS OF MACHINERIES 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
137 LIGTNING PROTECTION & GROUNDING SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
138 LUBRICATION AND BEARING TECHNOLOGY 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
139 BASIC PRINCIP LUBRICATION AND APLICATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
140 MACHINERY NOISE AND PROBLEM SOLVING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
142 MAINTENANCE MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
144 MAN POWER PLANNING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
145 OPERATION MANAGEMENT PRODUCTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
146 MATERIAL MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
147 SERVICE REPAIR MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
148 MANUFACTURING PROCESS TO USE CNC MACHINING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
149 MANUFACTURING PROCESSES TO USE CASTING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
150 MANUFACTURING PROCESSES TO USE METAL FORMING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
151 NEGOTIATION SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
152 NEGOTIATION SKILL FOR PURCHASING STAFF 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
154 OFFSHORE WELLHEAD PLATFORM OPERATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
155 OIL & GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
156 OIL & GAS: MEASUREMENT AND CALCULATION 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
157 OIL AND GAS HANDLING FACILITIES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
161 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
163 OPTIMIZATION FOR PRODUCTION SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
164 IMPLEMENTATION AND PROBLEM IN LAND ACCUSATIONS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
165 POWER PLANT ELECTRICAL DISTRIBUTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
167 DRILLING AND EXPLOSIVE IN MINING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
168 MATERIAL HANDLING & APLICATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
169 DESTRUCTIVE TEST SERTIFICATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
170 PLANT LAYOUT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
171 MAINTENANCE PLANNING AND SCHEDULING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
172 PETROLEUM ENGINEERING FOR NON PETROLEUM ENGINEERS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
174 PIGGING OPERATIONS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
175 PNEUMATIC CONTROL SYSTEM 5 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 9.500.000
177 PUMP OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
179 POWER DISTRIBUTION SYSTEM: PROTECTION AND RELAYING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
180 POWER MANAGEMENT SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
181 PREDICTIVE MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
183 PROCESS CONTROL AND INSTRUMENTATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
184 PROCESS CONTROL AND LOOP 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
185 PRODUCED WATER TREATMENT FOR RE-INJECTION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
186 PRODUCTION AND OPERATION MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
187 PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
188 PRODUCTION HANDLING SEPARATION AND MEASUREMENT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
189 PRODUCTION OF HELICAL GEAR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
190 PRODUCTION OPERATION MANAGEMENT FOR MANAGERS 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
191 PRODUCTION SAFETY SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
193 PROJECT MANAGEMENT (PM) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
195 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
197 PUMP : OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
200 RECIPROCATING COMPRESSOR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
201 REFRACTORY AND HEAT INSULATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
203 RELIABILITAS SISTEM : TO EVALUATE MAINTENANCE RESULT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
205 RELIABILITY CENTERED MAINTENANCE (RCM) 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
SAFETY RELIEF VALVE: FUNDAMENTAL CONCEPTS, SIZING 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
206 5 9.500.000
AND SELECTION
SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION): 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
207 PRINCIPLES, HARDWARE SYSTEM, OPERATION & 5 9.500.000
PROGRAMMING
208 SIX SIGMA CHAMPIONS 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
211 TECHNIC FOR HUMAN RELATIONS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
212 TECHNIC INSTALATION AND ELECTRICAL PROTECTION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
213 TECHNIC VECHILES MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
214 TECHNIC MACHANICAL MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
215 TECHNOLOGY ENGINE MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
216 TESTING OF MACHINE TOOLS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
217 TIG AND MIG WELDING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
218 TRAFO: PRINCIPLES, APPLICATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
219 MECHANICAL POWER TRANSMISSION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
221 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
222 WAREHOUSING & DISTRIBUTION MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
223 WATER TREATING AND CHEMICALS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
224 WELL COMPLETION AND WORK OVER 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
225 INVETIGASI KECELAKAAN 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
226 OPERATION AND MAINTENANCE KUBIKAL LOW 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
40 PIPING / PIPA
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
2 FLANGE AND JOINT INTEGRITY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 PIPING SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 VALVE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 PROCESS PIPING & PIPELINE SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 PIPELINE : DESIGN, TESTING, INSPECTION AND MAINTENANCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
8 VALVE (CHOKE & CONTROL VALVE) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
41 PLAT
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 MANUFACTURING PLANNING & CONTROL 2 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 4.500.000
2 ELECTROPLATING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
5 PRINCIPLE OF MANUFACTURING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
6 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
42 PROCUREMENT / PENGADAAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINNER) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
2 BASIC PROCUREMENT & PURCHASING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 E-PROCUREMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
6 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 LOGISTIC MANAGEMENT 2 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 4.500.000
8 LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
9 MATERIAL SELECTION MACHINE COMPONENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
11 PRACTICAL SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 PROCUREMENT AND CONTRACT MONITORING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
13 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY
14 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
CHAIN
43 PRODUCTION / PRODUKSI
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
2 ADVANCED OIL AND GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
3 HEAT EXCHANGER : OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
6 CENTRIFUGAL PUMP AND SEAL 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
8 ELECTRICITY POWER SUBSTATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
11 INDUSTRIAL COMBUSTION AND BURNER 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
12 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
14 OPERATION MANAGEMENT PRODUCTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
15 OIL & GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
18 OPTIMIZATION FOR PRODUCTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
20 PRODUCED WATER TREATMENT FOR RE-INJECTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
21 PRODUCTION AND OPERATION MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
22 PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
23 PRODUCTION HANDLING SEPARATION AND MEASUREMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
24 PRODUCTION OF HELICAL GEAR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
25 PRODUCTION OPERATION MANAGEMENT FOR MANAGERS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
26 PRODUCTION SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
27 RECIPROCATING COMPRESSOR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
28 REFRACTORY AND HEAT INSULATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
29 SIMULATION PROCESS CHEMICAL TECHNIC USING HYSYS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
31 SURFACE PRODUCTION OPERATION & EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
32 SYSTEM AND COST PRODUCTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
33 WELL COMPLETION AND WORK OVER 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
34 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
35 TOTAL PRODUCTIVE MAINTENANCE (TPM) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
44 PROJECT / PROJEK
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 PROJECT MANAGEMENT (PM) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
2 ADVANCED PROJECT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 ESSENTIALS OF PROJECT MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 IT PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
5 PROJECT COST MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 PROJECT LEADERSHIP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
8 PROJECT MANAGEMENT based on PRINCE2 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 PROJECT MANAGEMENT FUNDAMENTALS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 PROJECT MANAGEMENT USING MICROSOFT PROJECT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
11 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 PROJECT RISK MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
14 SOFTWARE PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
45 PUBLIC RELATIONS / HUMAS
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 4.500.000
4 EFFECTIVE MASTER OF CEREMONY (MC) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
6 vLEADERSHIP DEVELOPMENT PROGRAM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 LEADERSHIP FOR FOREMAN 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 POSITIVE FIGHTER FOR SALES PEOPLE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 POWERFUL COMMUNICATION SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
10 POWERFUL PUBLIC SPEAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
11 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
12 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
13 SERVICE WITH DELIGHT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
14 BUILDING A TEAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
15 CAREER PLANNING SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
16 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
19 EFFECTIVE PRESENTATION SKILLS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
20 NEGOTIATION SKILL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
21 SUPERVISORY SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
22 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
23 LEADERSHIP FOR QUALITY MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
24 MC (MASTER OF CEREMONY) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
25 MEDIA RELATION AND COMMUNICATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
26 MEDIA RELATIONS STRATEGY AND EXECUTIONS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
27 MEDIA RELATIONS STRATEGY FOR EFFECTIVE PROMOTION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
28 IMPLEMENTATION AND PROBLEM IN LAND ACCUSATIONS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
29 DECISION MAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
31 POWERFUL PRESENTATION EXCELLENCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
32 PRACTICAL CUSTOMER SERVICE 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
34 PRESENTATION SKILL FOR THE BEGINNERS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 4.500.000
35 PROBLEM SOLVING & DECISION MAKING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
36 SERVICE EXCELLENT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
37 SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FOR LIFE 2 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 4.500.000
38 SPARE PARTS MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
40 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
41 TECHNIC FOR HUMAN RELATIONS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
42 WORKING AS A TEAM EXCELLENCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
43 WORKLOAD ANALYSIS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
46 PUMP
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 CENTRIFUGAL PUMP AND SEAL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 PIPELINE : DESIGN, TESTING, INSPECTION AND MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 4.500.000
6 PUMP OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
4 BASIC SURFACE SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
5 CORROSION AND CATHODIC PROTECTION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
6 DANGEROUS GOODS 2 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 4.500.000
7 EFFLUENT PRODUCED WASTE WATER 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
8 EMERGENCY PREPAREDNESS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
9 ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
10 FAILURE ANALYSIS METHODS AND CASES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
11 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 H2S AWARENESS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
13 HAND TOOL UTILIZATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
14 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
15 HAZARDOUS MATERIAL HANDLING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
18 LIGTNING PROTECTION & GROUNDING SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
21 DRILLING AND EXPLOSIVE IN MINING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
22 HAZARD ANALYSIS CRITICAL CONTROL POINT (HACCP) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
24 PRODUCTION SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
26 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
SAFETY RELIEF VALVE: FUNDAMENTAL CONCEPTS, SIZING 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
27 5 9.500.000
AND SELECTION
28 TECHNIC INSTALATION AND ELECTRICAL PROTECTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
29 TRAINING OF TRAINERS SAFETY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
31 WATER TREATING AND CHEMICALS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
32 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
33 ISO 27001: INFORMATION SECURITY MANAGEMENT SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
34 NON DESTRUCTIVE TEST (NDT) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
35 BIO SAFETY AND BIO SECURITY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINNER) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
2 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 PRACTICAL SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
49 SYSTEM / SISTEM
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
2 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
3 AC CONTROLLING SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 ADVANCED OIL AND GAS PRODUCTION SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
6 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
7 AUDIT ENERGY AND POWER SYSTEM MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
8 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
9 BASIC SURFACE SAFETY SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
10 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
11 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
17 ELECTRICAL POWER SYSTEM ANALYSIS 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
18 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
19 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
22 GROUNDING SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
23 HVAC SYSTEM: OPERATION AND MAINTENANCE 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
24 HYDRAULIC CONTROL SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
25 HYDRAULIC/PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
28 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
29 ISO 27001: INFORMATION SECURITY MANAGEMENT SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
30 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
31 ISO/IEC 9000 : 2008 QUALITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
33 MAINTENANCE SYSTEM AND DOCUMENTATION 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
34 MAINTENANCE: SYSTEM AND COST 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
35 OIL & GAS PRODUCTION SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
36 OPTIMIZATION FOR PRODUCTION SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
37 PIPING SYSTEM 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
39 POWER DISTRIBUTION SYSTEM: PROTECTION AND RELAYING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
40 POWER MANAGEMENT SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
41 PRACTICAL AND ADVANCED COURSE ON HVAC SYSTEMS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
42 PRINCIPLE OF OPERATION PLANNING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
43 PROCESS PIPING & PIPELINE SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
44 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
45 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
47 STRUCTURE CABLING SYSTEM BY SYSTIMAX 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
49 SYSTEM AND COST PRODUCTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
50 SYSTEM MEASUREMENT AND CALIBRATION 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
51 SYSTEMS ANALYSIS AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
50 TECHNIC / TEKNIK
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
BASIC DRILLING ENGINEERING AND HEALTH, SAFETY & 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
2 5 9.500.000
ENVIRONMENTAL CONSIDERATION
3 BASIC PETROLEUM ENGINEERING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
BASIC RESERVOIR ENGINEERING FOR NON PETROLEUM
4 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
ENGINEER
6 BASIC TECHNICAL CONTROL FOR INDUSTRY 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
7 GEOLOGY FOR NON GEOLOGIST 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
9 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
10 IT AUDIT PRACTICES 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
11 IT HELPDESK 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
12 WAREHOUSE COMPUTERISATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
13 LUBRICATION AND BEARING TECHNOLOGY 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
14 BASIC PRINCIP LUBRICATION AND APLICATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
15 MASTERING MICROSOFT EXCEL 2007 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
16 MICRO CONTROLLER APPLICATION IN INDUSTRIAL PLANTS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
17 NON DESTRUCTIVE TEST (NDT) 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
18 NON DESTRUCTIVE TESTING (NDT) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
19 NUMERICAL CONTROL AND ROBOTIC 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
23 SITUS WEB DEVELOPMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
24 TEKNOLOGI DEVELOPMENT AND STANDARD MATERIAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
25 HEAT TREATMENT FOR METAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
27 PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
28 PROCESS CONTROL AND LOOP 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
29 PROCESS PIPING & PIPELINE SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
30 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
34 PROCES MACHINING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
35 PUMP : OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
39 ELECTRICAL MOTOR CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
40 STRATEGIC HEALTH INFORMATION SYSTEM IN HOSPITAL 5 8-12 5-9 5-9 2-6 21-25 25-29 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
41 STRUCTURE CABLING SYSTEM BY SYSTIMAX 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM ( 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
43 5 9.500.000
SCADA )
44 TECHNIC FOR OWN CALCULATION (HPS) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
46 TECHNOLOGY CAD/CAM 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
47 TECHNOLOGY ENGINE MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
48 TESTING OF MACHINE TOOLS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
49 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
50 IT BALANCED SCORECARD 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
51 IT PROJECT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
52 IT RISK MANAGEMENT 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
53 ITIL V.3 FOUNDATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
54 MANAGING SOFTWARE REQUIREMENTS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
55 PRIMAVERA P6 PROFESSIONAL FUNDAMENTAL 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
56 PROJECT MANAGEMENT based on PRINCE2 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
57 PROJECT MANAGEMENT USING MICROSOFT PROJECT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
58 SOFTWARE PROJECT MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
59 SOFTWARE QUALITY ASSURANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
60 SOFTWARE TESTING FOUNDATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
61 SYSTEMS ANALYSIS AND DESIGN WITH UML 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
62 SYSTEMS ANALYSIS AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
63 ISO 27001: INFORMATION SECURITY MANAGEMENT SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
64 ISO 31000 - RISK MANAGEMENT : PRINCIPLES AND GUIDELINES 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
65 ISO/IEC 9000 : 2008 QUALITY MANAGEMENT SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
66 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
67 ISO/IEC 20000: IT SERVICE MANAGEMENT 3 22-24 5-7 26-18 16-18 14-16 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
68 ISO/IEC 38500: IT-GOVERNANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
69 ASME PTC 4 – 1 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
70 BASIC GAS ENGINE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
71 ENERGY CONSERVATION TECHNIC ON BUILDING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
72 MAINTENANCE OF MACHINE TOOLS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
73 SCADA FOR ENGINEER 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
74 SCADA FOR OPERATOR & TEKNICIAN 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
76 ISO 9001 : 2015 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
51 TURBIN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 14-16 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
9 TURBIN & GENERATOR OPERATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
11 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
52 VECHICLE / ENDARAAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
2 TRANSPORTATION MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
53 VIBRATION / GETARAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000
2 BASIC MACHINERY VIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
3 BASIC VIBRATION ANALYSIS 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
5 VIBRATION ANALISIS IN ROTARY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
54 WAREHOUSE / GUDANG
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 AIR AND SEA CARGO HANDLING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
2 DANGEROUS GOODS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
3 INVENTORY AND WAREHOUSE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
4 MATERIAL HANDLING & APLICATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
6 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
7 WAREHOUSE COMPUTERISATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8 WAREHOUSING & DISTRIBUTION MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
55 WATER / AIR
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BOILER WATER TREATMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
2 EFFLUENT PRODUCED WASTE WATER 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
3 PRODUCED WATER TREATMENT FOR RE-INJECTION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
4 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
6 WATER TREATING AND CHEMICALS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
56 WELDING / ENGELASAN
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BASIC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
2 METALLURGY IN WELDING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 OXY ACETYLENE WELDING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
4 OXY ACETYLENE WELDING (LAS ASETILIN) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
6 TIG AND MIG WELDING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000
7 WELDING INSPECTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
8 WELDING METALLURGY 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
9 ARC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
10 MANUAL METAL ARC WELDING (LAS LISTRIK) 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
11 GAS METAL ARC WELDING (LAS MIG/MAG) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
12 GAS TUNGSTEN ARC WELDING (LAS TIG) 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
57 OIL REFINERY
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 RESEVOIR ENGINEERING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
2 PRODUCTION AND STIMULATION 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
3 DRILLING DAN WELL CONTROL 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000
4 COMPLETION, WORKOVER DAN KERJA ULANG SUMUR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000