Sunteți pe pagina 1din 81

SERVICE EXPRES : 0822 1666 9919

Kami siap mengadakan training pada saat weekend (By Request)

KITA MELANGKAH TERUS UNTUK MEMBUAT PELANGGAN PUAS PADA SETIAP PERMINTAAN. KITA TAHU KEBUTUHAN MEREKA DAN
MENYEDIAKAN SOLUSI YANG BERKUALITAS DAN PELAYANAN PROFESIONAL, PROAKTIF, TEPAT GUNA DAN TEPAT WAKTU.
NO TOPIC NO TOPIC NO TOPIC
1 ACOMODATION 21 FINANCIAL 41 PLAT
2 ADMINISTRATOR / ADMINISTRASI 22 GAS 42 PROCUREMENT
3 BOILER 23 GENERAL AFFAIRS 43 PRODUCTION
4 BUILDING 24 GENERATOR 44 PROJECT
5 CALIBRATION 25 HEALTH 45 PUBLIC
6 CHEMICHAL 26 HEATING 46 PUMP
7 COAL 27 HUMAN RESOURCE / SUMBER DAYA MANUSIA 47 SAFETY
8 COMMUNICATION 28 INSPECTION 48 SUPPLY CHAIN
9 COMPRESSOR 29 INSTRUMENTATION 49 SYSTEM/SISTEM
10 CONTRACT 30 LEGAL 50 TECHNIC/TEHNIK
11 CONTROL 31 LOGISTIC 51 TURBIN
12 COOLING 32 MAINTENANCE 52 VECHILE
13 CORROSION 33 MANAGEMENT / MANAJEMEN 53 VIBRATION
14 DESIGN 34 MARKETING 54 WAREHOUSE
15 DRILLING 35 MATERIAL 55 WATER
16 ELECTRICAL 36 MEASURENMENT 56 WELDING
17 ENVIRONMENT 37 MECHANICAL 57 OIL REFINERY
18 EQUIPMENT 38 MINING
19 EXPLORATION 39 OPERATION / OPERASI
20 FAMILIARIZATION 40 PIPING
JUDUL - JUDUL DI BAWAH KAMI SELENGGARAKAN DI BANDUNG, JAKARTA, JOGYA, SURABAYA. BATAM DAN BALI
BOOKING KHUSUS TANGGAL DAN KOTA MINIMAL 4 PESERTA HUB MARKETING KHUSUS KAMI DI 0822 1449 2424 / training@iforbit.co.id

1 ACOMODATION / AKOMODASI

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 CATERING & ACCOMMODATION IN OIL & MINE INDUSTRY 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

2 CATERING SERVICE, HYGIENE & SANITATION 3 2-4 12-14 13-14 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 26-28 6.500.000

3 FINANCING CONDOTEL/HOTEL OPERATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

MANAGEMENT OF OUTSOURCE STAFF HOUSING AND


4 4 8.500.000
CATERING SERVICES 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20

5 SAY NO!!! TO GIVE UP 3 6.500.000


22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5

2 ADMINISTRATOR / ADMINISTRASI

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 EFFECTIVE COMPETENCY MODELLING & REPORTING 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

2 EFFECTIVE LINE BALANCING 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 EFFECTIVE MASTER OF CEREMONY (MC) 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

4 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

5 EFFECTIVE PRESENTATION SKILLS 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

6 ENGLISH REPORT WRITING 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATION 10-12


7 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 6.500.000
PROFESSIONAL

8 EXCELLENT COMMUNICATION AT WORK 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
9 FAILURE ANALYSIS METHODS AND CASES 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

10 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

FILING MANAGEMENT FOR SECRETARY AND ADMINISTRATION


11 STAFF (USING MICROSOFT WORD, MICROSOFT EXCEL, & 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 8-10 6.500.000
MICROSOFT ACCESS)

12 FILLING SYSTEM FOR SECRETARY 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

13 GOOD CORPORATE GOVERNANCE 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

14 HOW TO IMPROVE BUSINESS PERFORMANCE 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

HYPNO-PRESENTATION SKILL: UNLOCKING YOUR POTENTIAL


15 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
POWER

16 ICE BREAKING AND ENERGIZERS 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

IMPROVING PERSONAL SKILL FOR SECRETARY & 10-12


17 3 6.500.000
ADMINISTRATIVE ASSISTANT 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23

18 INFLUENTIAL LEADERSHIP EXCELLENCE 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

19 INTERPERSONAL COMMUNICATION SKILL 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

20 COMMUNICATION SKILL AND INTERACTION 3 8-10 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

21 NEGOTIATION SKILL 3 22-24 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

22 SUPERVISORY SKILL 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

23 LEADER AS A C.O.A.C.H 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000

24 LEADERSHIP FOR QUALITY MANAGEMENT 3 22-24 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

25 MANAGING STRESS FOR PRACTICAL PURPOSE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

26 ENVIROMENTAL MANAGEMENT 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
27 LIBRARY MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

28 MC (MASTER OF CEREMONY) 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000

29 MEDIA RELATION AND COMMUNICATION 3 22-24 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

30 MEDIA RELATIONS STRATEGY AND EXECUTIONS 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000

31 MEDIA RELATIONS STRATEGY FOR EFFECTIVE PROMOTION 3 22-24 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

32 PROFESSIONAL SECRETARY COMPETENSI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

33 TEAM WORK DEVELOPMENT 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000

34 SUPERVISORY IMPROVEMENT FUNCTION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

35 BASIC MENTAL 3 22-24 5-7 26-18 16-18 2-4 5-7 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

36 NEGOTIATION SKILL FOR PURCHASING STAFF 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

37 OFFICE AUTOMATION 3 8-10 12-14 12-14 16-18 2-4 5-7 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000

38 DECISION MAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

39 PERSONAL EXCELLENCE: WINNER ATTITUDE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

PERSONALITY DEVELOPMENT BASED ON EMOTIONAL AND


40 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
SPRITUAL QUETIENTS

41 PLAN LAY OUT OFFICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

42 POWERFUL PRESENTATION EXCELLENCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING


43 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
STAFF (USING MICROSOFT POWER POINT)

44 PRESENTATION SKILL FOR THE BEGINNERS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

45 PROBLEM SOLVING & DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
46 SERVICE EXCELLENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

47 SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FOR LIFE 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

48 SPARE PARTS MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

SPEAKING FOR BUSINESS (PRESENTATION, NEGOTIATION AND


49 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
LOBBYING)

STRATEGIC HUMAN RESOURCE MANAGEMENT AND


50 ORGANIZATION DEVELOPMENT 3 6.500.000
2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12

51 STRATEGIC PERFORMANCE MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

52 STRATEGIC PLANNING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

53 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

54 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

55 WORKING AS A TEAM EXCELLENCE 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

56 WORKLOAD ANALYSIS 3 2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

57 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

58 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

59 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 10-12 6.500.000


2-4 12-14 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23

EXCELLENT MOTIVATION AND TEAM WORK OUTBOUND


60 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
TRAINING

61 vLEADERSHIP DEVELOPMENT PROGRAM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

62 LEADERSHIP FOR FOREMAN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

63 POSITIVE FIGHTER FOR SALES PEOPLE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
64 POWERFUL COMMUNICATION SKILL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

65 POWERFUL PUBLIC SPEAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

66 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

67 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

68 SERVICE WITH DELIGHT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

69 BUILDING A TEAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

70 CAREER PLANNING SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

71 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

72 EFFECTIVE PERFORMANCE APPRAISAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

73 EFFECTIVE TRAINING MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

74 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
8-10
3

75 JOB COMPETENCY PROFILING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

76 MEASURING TRAINING IMPACT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

77 PERFORMANCE BASED PAY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

78 SELF-EFFECTIVENESS & DEVELOPMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

79 STRATEGIC HUMAN RESOURCES MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

COMMUNICATION STRATEGY WITH GOFERNMENT


80 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
INSTITUTION 8-10
3

81 ASPECTS OF CONTRACT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
82 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 8-10 12-14 12-15 16-18 7-9 25-27 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000

83 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

84 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

85 ADMINISTRASI PERKANTORAN 3 8-10 12-14 12-15 16-18 7-9 25-27 9-11 13-15 17-19 8-10 12-14 10-12 6.500.000

86 ACCOUNT PAYABLE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

3 BOILER

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

BOILER AND TURBIN UAP: OPERATION, MAINTENANCE DAN


1 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
TROUBLESHOOTING

2 BOILER WATER TREATMENT 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

BOILER, TURBIN (STEAM) : OPERATION MAINTENANCE AND


3 4 2-5 19-22 12-15 23-26 25-28 9-12 13-16 17-20 8-11 26-29 17-20 8.500.000
TROUBLESHOOTING 14-17

4 BOILER: OPERATION & MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

5 BOILER: OPERATION, MAINTENANCE & TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

6 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

4 BUILDING / BANGUNAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 ENERGY CONSERVATION TECHNIC ON BUILDING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

2 BUILDING A TEAM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

3 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
CORPORATE BUILDING FOR INTERNAL ORGANISATION CULTUR
4 4 8.500.000
AND ETIC DEVELOPEMENT 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20

TECHNIC FOR ENERGY CONSERVATION THRU ENERGY AUDIT


5 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
IN BUILDING

5 CALLIBRATION / CALIBRA SI

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 CALLIBRATION OF MEASURING TOOL 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

2 INSTRUMENTATION AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

3 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

4 SYSTEM MEASUREMENT AND CALIBRATION 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

6 CHEMICAL / KIMIA

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 CHEMICAL ENGINEERING FUNDAMENTALS FOR NON ENGINEER 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR OIL


2 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
AND GAS REFINERY AND PETROCHEMICAL INSTALLATION

3 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7-9 25-27

4 SIMULATION PROCESS CHEMICAL TECHNIC USING HYSYS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

5 WATER TREATING AND CHEMICALS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

7 COAL

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 COAL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
2 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

3 COATING SYSTEM AND PROTECTION CORROSION 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

END WORK PROCESS WITH METAL COATING


4 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
(ELECTROPLATING)

5 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

8 COMMUNICATION / KOMUNIKASI

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

EFFECTIVE COMMUNICATION IN COMPAIGN PILLEG 3


1 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
LEGISLATION AND PILKADA

2 INTERPERSONAL COMMUNICATION SKILL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

3 MEDIA RELATION AND COMMUNICATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

4 EXCELLENT COMMUNICATION AT WORK 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

5 POWERFUL COMMUNICATION SKILL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

COMMUNICATION, ASSERTIVENESS AND CONFLICT 3


6 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
MANAGEMENT 8-10

7 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

9 COMPRESSOR

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

COMPRESSOR : OPERATION, MAINTENANCE AND 3 6.500.000


1 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12
TROUBLESHOOTING

2 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
CENTRIFUGAL COMPRESSOR PERFORMANCE & CONDITION
3 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
EVALUATION

COMPRESSOR OPERATION, MAINTENANCE &


4 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
TROUBLESHOOTING

5 SAY NO!!! TO GIVE UP 3 10-12 6.500.000


2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23

10 CONTRACT / KONTRAK

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 CONTRACT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

2 ASPECTS OF CONTRACT 3 22-24 5-7 26-18 16-18 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7-9 25-27

3 PROCUREMENT AND CONTRACT MONITORING 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

11 CONTROL

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

2 BASIC TECHNICAL CONTROL FOR INDUSTRY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

CONTROL VALVE: OPERATION, MAINTENANCE, AND


3 4 15-18 6-9 19-22 23-26 21-24 26-29 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
TROUBLESHOOTING

4 FLOW MEASUREMENT AND CONTROL ELEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

5 HYDRAULIC CONTROL SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

6 HYDRAULIC/PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

7 INDUSTRIAL AUTOMATION & CONTROL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
8 MANUFACTURING PLANNING & CONTROL 3 22-24 5-7 26-18 16-18 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
7-9 25-27

9 MICRO CONTROLLER APPLICATION IN INDUSTRIAL PLANTS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

PRESSURE VESSELS : CALCULATION, CODES, PRODUCTION,


10 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
OPERATION, CONTROLS AND SAFETIES

11 PROCESS CONTROL INSTRUMENTATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

12 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

13 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

12 COOLIN G

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

2 AC CONTROLLING SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 AIR CONDITIONING AND HVAC 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

4 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

5 BASIC REFRIGERATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

6 CHILLER AND COOLING TOWER: DESIGN AND OPERATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

DESIGN OF HEATING, VENTILATION AND AIR CONDITIONING


7 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
SYSTEM

PETROLEUM INDUSTRIAL REFRIGERATION: OPERATION AND


8 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
MAINTENANCE

9 PRACTICAL AND ADVANCED COURSE ON HVAC SYSTEMS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

REFRIGERATION : OPERATION, MAINTENANCE AND 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
10 5 9.500.000
TROUBLESHOOTING
11 RELIABILITAS SISTEM : TO EVALUATE MAINTENANCE RESULT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

12 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

13 CORROSION / KOROSI

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

2 COATING SYSTEM AND PROTECTION CORROSION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

3 CORROSION AND CATHODIC PROTECTION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

4 CORROSION MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

END WORK PROCESS WITH METAL COATING


5 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
(ELECTROPLATING)

6 INSPECTION AND CORROTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

7 NON DESTRUCTIVE TEST (NDT) 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

8 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

14 DESIGN / DESAIN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 BELT CONVEYOR : TECHNOLOGY, DESIGN CALCULATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

DESIGN OF JIGS AND FIXTURES ( ALAT BANTU CEKAM DAN 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13
2 4 8.500.000
PEGANG)

DESIGN OF MACHINE CONSTRUCTION AND INDUSTRIAL


3 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
EQUIPMENT (KONSTRUKSI MESIN DAN PERALATAN INDUSTRI)
DESIGN OF PRESS AND FORMING TOOL (ALAT PENEKAN DAN
4 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
PEMBENTUK)

5 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

6 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

15 DRILLING/PENGEBORAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

BASIC DRILLING ENGINEERING AND HEALTH, SAFETY & 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
1 5 9.500.000
ENVIRONMENTAL CONSIDERATION

2 DRILLING AND EXPLOSIVE IN MINING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

3 DRILLING ENGINEERING AND WELL PLANING 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

16 ELECTRICAL / LISTRIK

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

ADVANCE COURSE ON LIGHTNING PROTECTION AND 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
1 5 9.500.000
GROUNDING SYSTEM

2 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

3 ARC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

4 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

5 AUDIT ENERGY AND POWER SYSTEM MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

6 BASIC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

ELECTRIC SUBMERSIBLE PUMP : PRINCIPLES, INSTALLATION,


7 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
OPERATION, MAINTENANCE AND TROUBLESHOOTING
ELECTRICAL MACHINES, DRIVES, TRANSFORMER AND POWER
8 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
SYSTEM

9 ELECTRICAL POWER SYSTEM ANALYSIS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

10 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

11 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

12 ELECTRICITY POWER SUBSTATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR


13 POWER PLANT, TRANSMISSION, DISTRIBUTION AND LARGE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
INDUSTRY

14 MANUAL METAL ARC WELDING (LAS LISTRIK) 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

15 POWER PLANT ELECTRICAL DISTRIBUTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

16 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

17 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

PROGRAMMABLE LOGIC CONTROLLER (PLC): ADVANCED AND


18 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
APPLICATED

PROGRAMMABLE LOGIC CONTROLLER (PLC): PRINCIPLES,


19 HARDWARE AND SOFTWARE, DIAGNOSTICS AND 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
TROUBLESHOOTING

20 ELECTRICAL MOTOR CONTROL SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

21 TECHNIC INSTALATION AND ELECTRICAL PROTECTION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

TECHNIC FOR ENERGY CONSERVATION THRU ENERGY AUDIT


22 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
IN BUILDING

23 MECHANICAL POWER TRANSMISSION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
24 SAY NO!!! TO GIVE UP 3 10-12 6.500.000
2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23

25 MECHANIC TRANMISION VOLT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

26 MEDIUM VOLTAGE PANEL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

17 ENVIRONMENT / LINGKUNGAN HIDUP

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR


1 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
EXECUTIVES

2 EARTH MOVEMENT MECHANICAL 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

3 EFFLUENT PRODUCED WASTE WATER 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

4 ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

5 H2S AWARENESS 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

6 HSE AUDIT TECHNIQUES 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL IN


7 3 6.500.000
THE OIL & GAS INDUSTRY 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5

8 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

WATER SURFACE FLOW AS OIL FENCE IN OIL SPILL GATHERING


9 (PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL OIL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK)

10 WATER TREATING AND CHEMICALS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

18 EQUIPMENT / PERALATA N

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 BELT CONVEYOR : OPERATION & MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

2 BASIC GAS ENGINE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

3 BASIC MACHINERY VIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

4 BASIC PRINCIP LUBRICATION AND APLICATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

5 BEARING AND OIL LUBRICATION FOR MACHINERY 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

6 BELT CONVEYOR : TECHNOLOGY, DESIGN CALCULATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

7 BELT CONVEYOR MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

CENTRIFUGAL COMPRESSOR PERFORMANCE & CONDITION 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
8 4 8.500.000
EVALUATION

9 CONVEYOR: OPERASI DAN PERAWATAN 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

10 CONVEYOR: OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

DESIGN OF JIGS AND FIXTURES ( ALAT BANTU CEKAM DAN 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13
11 4 8.500.000
PEGANG)

DESIGN OF MACHINE CONSTRUCTION AND INDUSTRIAL


12 4 8.500.000
EQUIPMENT (KONSTRUKSI MESIN DAN PERALATAN INDUSTRI) 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7

DESIGN OF PRESS AND FORMING TOOL (ALAT PENEKAN DAN 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
13 4 8.500.000
PEMBENTUK)

14 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

15 DYNAMIC OF MACHINE TOOLS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

16 EARTH MOVEMENT MECHANICAL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

17 FLANGE AND JOINT INTEGRITY 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

18 HAND TOOL UTILIZATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
19 HEAVY DUTY EQUIPMENT 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

20 HEAVY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

21 HEAVY EQUIPMENT MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

22 HYDRAULICS AND PNEUMATICS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

23 KINEMATICS AND DYNAMICS OF MACHINERIES 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

24 LUBRICATION AND BEARING TECHNOLOGY 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

25 MACHINERY NOISE AND PROBLEM SOLVING 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

26 MACHINERY VIBRATION ANALYSIS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

27 MAINTENANCE OF MACHINE TOOLS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

28 MATERIAL SELECTION MACHINE COMPONENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

29 OFFSHORE WELLHEAD PLATFORM OPERATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

30 OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

31 PIGGING OPERATIONS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

32 PREVENTIVE MAINTENANCE GENERATOR 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

33 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

34 PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

35 ROOT CAUSE ANALYSIS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

ROTATING EQUIPMENTS: OPERATION, MAINTENANCE, 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
36 4 8.500.000
TROUBLE SHOOTING AND ANALYSIS

37 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
38 SURFACE PRODUCTION OPERATION & EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

39 SYSTEM MEASUREMENT AND CALIBRATION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

40 TESTING OF MACHINE TOOLS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

41 THEORY AND APPLICATION BELT CONVEYOR 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

TROUBLE SHOOTING, INSPECTION, AND MONITORING OF


42 3 6.500.000
MACHINERY 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5

19 EXPLORATION / EKSPLORASI

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 FORMATION DAMAGE AND WELL STIMULATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

2 COAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

4 COATING SYSTEM AND PROTECTION CORROSION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

5 DRILLING AND EXPLOSIVE IN MINING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

END WORK PROCESS WITH METAL COATING


6 4 8.500.000
(ELECTROPLATING) 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7

7 MINING VENTILATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

8 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

20 FAMILIARIZATION / PENGENALAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

BASIC RESERVOIR ENGINEERING FOR NON PETROLEUM 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
1 5 9.500.000
ENGINEER
2 CHEMICAL ENGINEERING FUNDAMENTALS FOR NON ENGINEER 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

3 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

4 GEOLOGY FOR NON GEOLOGIST 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

5 HUMAN RESOURCES MANAGEMENT FOR NON-HR MANAGER 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

6 PETROLEUM ENGINEERING FOR NON PETROLEUM ENGINEERS 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

7 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

21 FINANCIAL / KEUANGAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

ADVANCE MAINTENANCE PLANNING, SCHEDULLING, 22-24 5-7 26-18 16-18 16-18 6-8 17-19 1-3 5-7 17-19
1 3 6.500.000
AUDITING, BENCHMARKING & IMPROVEMENT 7-9 25-27

2 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINNER) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 BASIC PROCUREMENT & PURCHASING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

4 COST MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

5 BASIC TREASURY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

6 E-PROCUREMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

INVENTORY MANAGEMENT AND COST INVESTMENT


7 4 8.500.000
RECOVERY 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7

8 INVENTORY AND WAREHOUSE MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

9 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

10 MAINTENANCE: SYSTEM AND COST 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
NATURAL GAS RESERVOIR, PROCESSING AND ECONOMICS 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
11 5 9.500.000
ASPECTS

12 TAX AND IMPLEMANTATION PROCEDURE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

13 PROCUREMENT AND CONTRACT MONITORING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

14 RISK MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

15 SUPPLY CHAIN MANAGEMENT (SCM) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

16 TAX AND FINANCIAL CONTROL 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

17 SYSTEM AND COST PRODUCTION 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

18 TOTAL COST OF OWNERSHIP ANALYSIS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

19 WORKLOAD ANALYSIS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

20 PRODUCTION PLAN & INVENTORY CONTROL (PPIC) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

21 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

22 IT RISK MANAGEMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

23 PROJECT COST MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

24 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 6.500.000


8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5

22 GAS

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

2 BASIC GAS ENGINE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

FLUID FLOW MEASUREMENT AND METER PROVING IN OIL AND 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
3 4 8.500.000
GAS INDUSTRY
GAS AND STEAM TURBINE : OPERATION, MAINTENANCE AND 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
4 5 9.500.000
TROUBLESHOOTING

5 GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

6 GAS METAL ARC WELDING (LAS MIG/MAG) 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

7 GAS TUNGSTEN ARC WELDING (LAS TIG) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

GAS TURBINE : PRINCIPLES, INSPECTION, OPERATION, 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
8 5 9.500.000
MAINTENANCE AND TROUBLESHOOTING

GAS TURBINE: OPERATION, MAINTENANCE AND


9 4 8.500.000
TROUBLESHOOTING 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7

10 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

23 GENERAL AFFAIRS / UMUM

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 BUILDING A TEAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

2 BASIC MENTAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

3 DECISION MAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

4 ENGLISH REPORT WRITING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

5 ENVIROMENTAL MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

6 EXCELLENT COMMUNICATION AT WORK 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

FILING MANAGEMENT FOR SECRETARY AND ADMINISTRATION


7 STAFF (USING MICROSOFT WORD, MICROSOFT EXCEL, & 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
MICROSOFT ACCESS)

8 FILLING SYSTEM FOR SECRETARY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
9 HOW TO IMPROVE BUSINESS PERFORMANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

HYPNO-PRESENTATION SKILL: UNLOCKING YOUR POTENTIAL


10 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
POWER

11 ICE BREAKING AND ENERGIZERS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

IMPROVING PERSONAL SKILL FOR SECRETARY &


12 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
ADMINISTRATIVE ASSISTANT

13 INFLUENTIAL LEADERSHIP EXCELLENCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

14 INTERPERSONAL COMMUNICATION SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

15 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

16 LEADERSHIP FOR QUALITY MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

17 LIBRARY MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

18 MANAGING STRESS FOR PRACTICAL PURPOSE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

19 MC (MASTER OF CEREMONY) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

20 MEDIA RELATION AND COMMUNICATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

21 MEDIA RELATIONS STRATEGY AND EXECUTIONS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

22 MEDIA RELATIONS STRATEGY FOR EFFECTIVE PROMOTION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

23 NEGOTIATION SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

24 NEGOTIATION SKILL FOR PURCHASING STAFF 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

25 OFFICE AUTOMATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

26 POWERFUL PRESENTATION EXCELLENCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

27 PRACTICAL CUSTOMER SERVICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING
28 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
STAFF (USING MICROSOFT POWER POINT)

29 PRESENTATION SKILL FOR THE BEGINNERS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

30 PROBLEM SOLVING & DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

31 PROFESSIONAL SECRETARY COMPETENSI 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

32 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

33 SUPERVISORY IMPROVEMENT FUNCTION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

34 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

35 SUPERVISORY SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

36 TEAM WORK DEVELOPMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

37 TECHNIC FOR HUMAN RELATIONS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

38 WORKING AS A TEAM EXCELLENCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

39 WORKLOAD ANALYSIS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

40 CUSTOMER SATIS FACTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

41 HANDLING CUSTOMER COMPLANT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

24 GENERATOR

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

2 GENERATOR: TEKNOLOGY, OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

3 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
4 PREVENTIVE MAINTENANCE GENERATOR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

5 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

STEAM GENERATOR AND TURBINE: OPERATION AND


6 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
MAINTENANCE

25 HEALTH / KESEHATAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 CATERING SERVICE, HYGIENE & SANITATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &


2 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
ENVIRONMENTAL CONSIDERATION

OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL IN


3 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
THE OIL & GAS INDUSTRY

4 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

5 STRATEGIC HEALTH INFORMATION SYSTEM IN HOSPITAL 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

26 HEATING / PEMANASAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

DESIGN OF HEATING, VENTILATION AND AIR CONDITIONING


1 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
SYSTEM

2 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 MINING VENTILATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

27 HUMAN RESOURCE / SUMBER DAYA MANUSIA

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 ACHIEVEMENT MOTIVATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
2 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

4 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

EXCELLENT MOTIVATION AND TEAM WORK OUTBOUND


5 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 2-4 6.500.000
TRAINING

6 ADVANCE SUPERVISORY MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

7 LEADERSHIP DEVELOPMENT PROGRAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

8 LEADERSHIP FOR FOREMAN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

9 POSITIVE FIGHTER FOR SALES PEOPLE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

10 POWERFUL COMMUNICATION SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

11 POWERFUL PUBLIC SPEAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 2-4 6.500.000

12 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

13 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

14 SERVICE WITH DELIGHT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

15 PRACTICAL BALANCED SCORECARD 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

16 ENJOYMENT AND PRODUCTIFE AFTER RETIREMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 17-20 8.500.000

17 BOOST YOUR CREATIVITY IN THINKING: MIND MAP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

18 COACHING AND COUNSELING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

19 COACHING AND COUNSELING (MONITORING) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

20 BUILDING A TEAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
COMMUNICATION, ASSERTIVENESS AND CONFLICT
21 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
MANAGEMENT

22 CAREER PLANNING SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

CHANGE & CONFLICT MANAGEMENT AND DEALING WITH


23 3 6.500.000
DIFFICULT PEOPLE 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5

24 COMPENSATION SYSTEM DEVELOPMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

25 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

26 EFFECTIVE PERFORMANCE APPRAISAL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

27 EFFECTIVE TRAINING MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

28 JOB COMPETENCY PROFILING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

29 MEASURING TRAINING IMPACT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

CORPORATE BUILDING FOR INTERNAL ORGANISATION CULTUR


30 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
AND ETIC DEVELOPEMENT

31 PERFORMANCE BASED PAY 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

32 SELF-EFFECTIVENESS & DEVELOPMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

33 STRATEGIC HUMAN RESOURCES MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

34 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

35 WORKLOAD ANALYSIS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

36 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

37 BASIC MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

38 DEVELOPING EXCELLENT INTERNAL TRAINER 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
39 DEVELOPING HIGH PERFORMANCE TEAMS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

COMMUNICATION STRATEGY WITH GOFERNMENT


40 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
INSTITUTION

41 EFFECTIVE COMMUNICATION SKILL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

42 EFFECTIVE COMPETENCY MODELLING & REPORTING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

43 EFFECTIVE LINE BALANCING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

44 EFFECTIVE MASTER OF CEREMONY (MC) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

45 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

46 EFFECTIVE PRESENTATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

47 EMOTIONAL QUETIENTS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

48 HUMAN RESOURCE PLANNING AND PRODUCTIVITY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

49 ENTREPRENEURSHIP 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

50 JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATION


51 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
PROFESSIONAL

52 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

53 EXCELLENT COMMUNICATION AT WORK 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

FILING MANAGEMENT FOR SECRETARY AND ADMINISTRATION


54 STAFF (USING MICROSOFT WORD, MICROSOFT EXCEL, & 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
MICROSOFT ACCESS)

55 FILLING SYSTEM FOR SECRETARY 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

56 GOOD CORPORATE GOVERNANCE 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000
57 HR MANAGEMENT OF CHANGE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

58 ICE BREAKING AND ENERGIZERS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

IMPROVING PERSONAL SKILL FOR SECRETARY & 10-12


59 3 6.500.000
ADMINISTRATIVE ASSISTANT 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23

60 INFLUENTIAL LEADERSHIP EXCELLENCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

61 INTERPERSONAL COMMUNICATION SKILL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

62 LEADERSHIP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

63 COMMUNICATION SKILL AND INTERACTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

64 NEGOTIATION SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

65 SUPERVISORY SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

66 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

67 LEADERSHIP FOR QUALITY MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

68 MAN POWER PLANNING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

MANAGEMENT OF OUTSOURCE STAFF HOUSING AND 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
69 4 8.500.000
CATERING SERVICES

70 MANAGING STRESS FOR PRACTICAL PURPOSE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

71 ENVIROMENTAL MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

72 PROFESSIONAL SECRETARY COMPETENSI 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

73 TEAM WORK DEVELOPMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

74 SUPERVISORY IMPROVEMENT FUNCTION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

75 BASIC MENTAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
76 NEGOTIATION SKILL FOR PURCHASING STAFF 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

77 OFFICE AUTOMATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

78 TRAINING FOR SENIOR MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

79 DECISION MAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

80 PERFORMANCE MANAGEMENT 4 22-25 5-8 12-15 2-5 22-25 5-8 23-26 6-9 3-6 8-11 5-8 10-13 8.500.000

81 PERSONAL EXCELLENCE: WINNER ATTITUDE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

PERSONALITY DEVELOPMENT BASED ON EMOTIONAL AND


82 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
SPRITUAL QUETIENTS

83 PLAN LAY OUT OFFICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

84 PLANNING AND ORGANIZE TRAINING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

85 POWERFUL PRESENTATION EXCELLENCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

86 PROBLEM SOLVING & DECISION MAKING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

87 SERVICE EXCELLENT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

88 SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FOR LIFE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

89 SEVEN HABITS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

90 SPARE PARTS MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

SPEAKING FOR BUSINESS (PRESENTATION, NEGOTIATION AND


91 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
LOBBYING)

STRATEGIC HUMAN RESOURCE MANAGEMENT AND 22-24 5-7 26-18 16-18 16-18 6-8 17-19 1-3 5-7 17-19
92 3 6.500.000
ORGANIZATION DEVELOPMENT 7-9 25-27

93 STRATEGIC PERFORMANCE MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
94 STRATEGIC PLANNING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

95 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

96 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

97 TECHNIC FOR HUMAN RELATIONS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

98 TRAINING DEVELOPMENT MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

99 TRAINING OF TRAINER (TOT) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

100 TRAINING OF TRAINERS SAFETY 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

101 TRAINING OF TRAINER (TOT) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

102 WORKING AS A TEAM EXCELLENCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

28 INSPECTION / INSPEKSI

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

2 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

3 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

4 INSPECTION AND CORROTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

RELIABILITY CENTERED MAINTENANCE & RISK BASED


5 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
INSPECTION

6 RELIABILITY CENTERED MAINTENANCE (RCM) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

7 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

TROUBLE SHOOTING, INSPECTION, AND MONITORING OF


8 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
MACHINERY
29 INSTRUMENTATION / INSTRUMENTASI

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

ADVANCE PROCESS CONTROL, INSTRUMENTATION AND


1 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
METERING

2 ADVANCE INSTRUMENTATION MEASUREMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

3 CALLIBRATION OF MEASURING TOOL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR,


POTENSI
4 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
INSTRUMENTATION

5 FLOW MEASUREMENT AND CONTROL ELEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

FLUID FLOW MEASUREMENT AND METER PROVING IN OIL AND 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
6 4 8.500.000
GAS INDUSTRY

7 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

MEASUREMENT TECHNIQUE FOR MAINTENANCE AND


8 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
OPERATION LATHE MACHINE

9 OIL & GAS: MEASUREMENT AND CALCULATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

10 PROCESS CONTROL AND INSTRUMENTATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

11 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

12 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

13 VIBRATION ANALYSIS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
30 LEGAL / HUKUM

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 ASPECTS OF CONTRACT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 2-4 6.500.000

2 BUSINESS PROCESS MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

COMMUNICATION STRATEGY WITH GOFERNMENT


3 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
INSTITUTION

4 CONTRACT MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

5 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

6 ISO 31000 - RISK MANAGEMENT : PRINCIPLES AND GUIDELINES 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

7 ISO 9001 2015 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

8 IT RISK MANAGEMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

METHODE TO SET COMPANY HPS "TECHNIC AND PROCEDURE


9 PRICE CALCULATION IN THE AUCTION OF GOOD SERVICE OF 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
COMPANY"

10 PROCUREMENT AND CONTRACT MONITORING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

11 PROJECT RISK MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

12 RISK INVESTMENT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

13 RISK MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

14 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

15 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

16 STRATEGIC MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM ( 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
17 5 9.500.000
SCADA )

31 LOGISTI C

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 AIR AND SEA CARGO HANDLING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

2 FLIGHT OPERATION MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

3 HAZARDOUS MATERIAL HANDLING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

INVENTORY MANAGEMENT AND COST INVESTMENT


4 4 8.500.000
RECOVERY 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7

5 INVENTORY AND WAREHOUSE MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

6 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

7 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

8 LOGISTIC MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

9 LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

10 MATERIAL HANDLING & APLICATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

11 MATERIAL HANDLING & PACKAGING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

12 MATERIAL MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

13 MATERIAL MANAGEMENT FOR PROJECT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

METHODE TO SET COMPANY HPS "TECHNIC AND PROCEDURE


14 PRICE CARCULATION IN THE AUCTION OF GOOD SERVICE OF 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
COMPANY"

15 PLANNING AND MANAGING INVENTORIES IN A SUPPLY CHAIN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
16 PRACTICAL SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

17 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

18 SUPPLY CHAIN MANAGEMENT (SCM) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

19 SUPPLY MARKET ANALYSIS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY


20 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
CHAIN

21 TRANSPORTATION MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

22 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

23 WAREHOUSING & DISTRIBUTION MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

WASTE HANDLING & TREATMENT IN THE OIL & GAS


24 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
INDUSTRIES

WATER SURFACE FLOW AS OIL FENCE IN OIL SPILL


GATHERING
25 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
(PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL OIL
FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK)

32 MAINTENANCE / PERAWATAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

2 BASIC PRINCIP LUBRICATION AND APLICATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 BEARING AND OIL LUBRICATION FOR MACHINERY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

4 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

5 BELT CONVEYOR : OPERATION & MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
6 BELT CONVEYOR MAINTENANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

BOILER AND TURBIN UAP: OPERATION, MAINTENANCE DAN


7 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
TROUBLESHOOTING

BOILER, TURBIN (STEAM) : OPERATION MAINTENANCE AND


8 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
TROUBLESHOOTING

9 BOILER: OPERATION & MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

10 BOILER: OPERATION, MAINTENANCE & TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

11 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

COMPRESSOR : OPERATION, MAINTENANCE AND


12 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
TROUBLESHOOTING

13 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

CONTROL VALVE: OPERATION, MAINTENANCE, AND 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
14 4 8.500.000
TROUBLESHOOTING

15 CONVEYOR: OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

16 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

ELECTRIC SUBMERSIBLE PUMP : PRINCIPLES, INSTALLATION,


17 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
OPERATION, MAINTENANCE AND TROUBLESHOOTING

GAS AND STEAM TURBINE : OPERATION, MAINTENANCE AND


18 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
TROUBLESHOOTING

GAS TURBINE : PRINCIPLES, INSPECTION, OPERATION,


19 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
MAINTENANCE AND TROUBLESHOOTING

GAS TURBINE: OPERATION, MAINTENANCE AND 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
20 4 8.500.000
TROUBLESHOOTING

21 GENERATOR: TEKNOLOGY, OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
22 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

HEAT EXCHANGERS: OPERATION, MAINTENANCE AND


23 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
TROUBLESHOOTING

24 HEAVY EQUIPMENT MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

HIGH PRESSURE PUMP (HPP): OPERATION, MAINTENANCE AND 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
25 5 9.500.000
TROUBLESHOOTING

26 HVAC SYSTEM: OPERATION AND MAINTENANCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

INTEGRATED PIPELINE DESIGN, OPERATION DAN


27 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
MAINTENANCE

28 LUBRICATION AND BEARING TECHNOLOGY 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

29 MACHINERY VIBRATION ANALYSIS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

MAINTENANCE PLANNING, SCHEDULLING AND WORK


30 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
CONTROL

31 MAINTENANCE MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

32 MAINTENANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

MAINTENANCE MANAGEMENT (FOR MANUFACTURE AND OIL


33 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
& GAS COMPANY

34 MAINTENANCE OF MACHINE COMPONENTS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

35 MAINTENANCE OF MACHINE TOOLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

36 MAINTENANCE PLANNING AND SCHEDULING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

37 MAINTENANCE STRATEGIC PLANNING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

38 MAINTENANCE SYSTEM AND DOCUMENTATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
39 MAINTENANCE: SYSTEM AND COST 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

40 MANAGING MAINTENANCE RESOURCES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

MEASUREMENT TECHNIQUE FOR MAINTENANCE AND


41 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
OPERATION LATHE MACHINE

42 MECHANICAL MAINTENANCE TECHNIC 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

43 MODERN MAINTENANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

44 OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

45 PREDICTIVE MAINTENANCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVE


46 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
MAINTENANCE)

47 PREVENTIVE MAINTENANCE GENERATOR 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

48 PREVENTIVE MAINTENANCE OF ELECTRICAL EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

49 PUMP : OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

PUMP AND COMPRESOR: OPERATION, COMPRESSOR AND


50 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
MAINTENANCE TROUBLESHOOTING

PUMP AND COMPRESSOR : OPERATION, MAINTENANCE AND


51 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
TROUBLESHOOTING

52 PUMP OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

PUMP SELECTION, DESIGN AND OPERATION FOR OIL AND GAS 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
53 5 9.500.000
SURFACE PRODUCTION FACILITIES

REFRIGERATION : OPERATION, MAINTENANCE AND 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
54 5 9.500.000
TROUBLESHOOTING

55 RELIABILITAS SISTEM : TO EVALUATE MAINTENANCE RESULT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
RELIABILITY CENTERED MAINTENANCE & RISK BASED
56 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
INSPECTION

57 RELIABILITY CENTERED MAINTENANCE (RCM) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

58 RISK MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

59 ROOT CAUSE ANALYSIS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

ROTATING EQUIPMENTS: OPERATION, MAINTENANCE,


60 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
TROUBLE SHOOTING AND ANALYSIS

61 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

62 SIX SIGMA CHAMPIONS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

STEAM TURBINE: OPERATION, MAINTENANCE AND


63 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
TROUBLESHOOTING

64 TECHNIC MACHANICAL MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

65 TECHNIC VECHILES MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

66 TECHNOLOGY ENGINE MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

67 TOTAL PRODUCTIVE MAINTENANCE (TPM) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

68 TRAFO: PRINCIPLES, APPLICATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

VECHICLE MAINTENANCE TECHNIC (PREVENTIVE


69 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
MAINTENANCE)

70 VIBRATION ANALISIS IN ROTARY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

33 MANAGEMENT / MANAJEMEN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 ADVANCE SUPERVISORY MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR
2 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
EXECUTIVES

3 ASPECTS OF CONTRACT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

4 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

COMMUNICATION, ASSERTIVENESS AND CONFLICT


5 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
MANAGEMENT

6 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

7 CONTRACT MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

CORPORATE BUILDING FOR INTERNAL ORGANISATION


8 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
CULTUR AND ETIC DEVELOPEMENT

9 COST MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

10 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

11 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

12 BASIC MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

13 EFFECTIVE EXECUTIVE SECRETARY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

14 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

15 ENGLISH REPORT WRITING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATION


16 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
PROFESSIONAL

FILING MANAGEMENT FOR SECRETARY AND


ADMINISTRATION
17 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
STAFF (USING MICROSOFT WORD, MICROSOFT EXCEL, &
MICROSOFT ACCESS)
18 FILLING SYSTEM FOR SECRETARY 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

19 FLOW MEASUREMENT AND CONTROL ELEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

20 GOOD CORPORATE GOVERNANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

21 HEAVY EQUIPMENT MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

22 HOW TO IMPROVE BUSINESS PERFORMANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

23 HR MANAGEMENT OF CHANGE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

HYPNO-PRESENTATION SKILL: UNLOCKING YOUR POTENTIAL


24 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
POWER

25 ICE BREAKING AND ENERGIZERS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

IMPROVING PERSONAL SKILL FOR SECRETARY &


26 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
ADMINISTRATIVE ASSISTANT

27 INFLUENTIAL LEADERSHIP EXCELLENCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

INFORMATION SYSTEMS AND INFORMATION TECHNOLOGIES


28 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
FOR SUPPLY CHAIN MANAGEMENT

INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (I T I 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
29 4 8.500.000
L) VERSION 3.1

30 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

INVENTORY MANAGEMENT AND COST INVESTMENT


31 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
RECOVERY

32 INVENTORY AND WAREHOUSE MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

33 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

34 NEGOTIATION SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
35 SUPERVISORY SKILL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

36 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

37 LEADERSHIP FOR QUALITY MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

38 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

39 LOGISTIC MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

40 LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

MANAGEMENT OF OUTSOURCE STAFF HOUSING AND


41 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
CATERING SERVICES

42 MANAGEMENT PROJECT : STRATEGI DAN IMPLEMENTASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

43 TIME MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

44 LIBRARY MANAGEMENT 4 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 8.500.000

45 RISK INVESTMENT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

46 STRATEGIC MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

47 MARKETING MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

48 MODERN MAINTENANCE MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

NATURAL GAS RESERVOIR, PROCESSING AND ECONOMICS


49 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
ASPECTS

50 TRAINING FOR SENIOR MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

51 PERFORMANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

52 PLAN LAY OUT OFFICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

53 POWER MANAGEMENT SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
54 STRATEGIC HUMAN RESOURCE MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

STRATEGIC HUMAN RESOURCE MANAGEMENT AND


55 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
ORGANIZATION DEVELOPMENT

56 STRATEGIC PERFORMANCE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

57 STRATEGIC PLANNING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

58 STRATEGIC PLANNING FOR INFORMATION SYSTEMS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

59 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

60 SUPPLY CHAIN MANAGEMENT (SCM) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

61 TRAINING DEVELOPMENT MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

62 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

63 PRINCIPLE OF MANUFACTURING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

64 PRINCIPLE OF OPERATION PLANNING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

65 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

66 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

67 CUSTOMER SERVICE EXCELLENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

68 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

69 LEADERSHIP FOR FOREMAN 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

70 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

71 ADVANCED PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

72 ESSENTIALS OF PROJECT MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
73 PROJECT COST MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

74 PROJECT MANAGEMENT FUNDAMENTALS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

75 PROJECT RISK MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

76 SOFTWARE PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

77 BUSINESS PROCESS MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

78 ISO 31000 - RISK MANAGEMENT : PRINCIPLES AND GUIDELINES 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

79 ISO/IEC 9000 : 2008 QUALITY MANAGEMENT SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

80 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

81 ISO/IEC 20000: IT SERVICE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

82 ISO/IEC 38500: IT-GOVERNANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

83 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

CHANGE & CONFLICT MANAGEMENT AND DEALING WITH


84 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
DIFFICULT PEOPLE

85 COMPETENCY-BASED HUMAN RESOURCES MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

86 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

87 EFFECTIVE PERFORMANCE APPRAISAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

88 EFFECTIVE TRAINING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

89 PROJECT MANAGEMENT (PM) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

34 MARKETING / PEMASARA N

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga
1 CUSTOMER RELATIONSHIP MANAGEMENT (CRM) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

2 CUSTOMER SERVICE EXCELLENCE STRATEGY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

3 CUSTOMER SERVICE EXCELLENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

4 MARKETING MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

5 PLANT LAYOUT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

6 POSITIVE FIGHTER FOR SALES PEOPLE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

7 PRACTICAL CUSTOMER SERVICE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING


8 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
STAFF (USING MICROSOFT POWER POINT)

9 PRESENTATION SKILL FOR THE BEGINNERS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

10 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

11 SERVICE WITH DELIGHT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

12 SUPPLY MARKET ANALYSIS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

35 MATERIAL / BAHAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 PRODUCTION PLAN & INVENTORY CONTROL (PPIC) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

2 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 HAZARDOUS MATERIAL HANDLING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

4 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

5 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR,
POTENSI
6 4 8.500.000
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13
INSTRUMENTATION

36 MEASURENMENT / PENGUKURAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR,


POTENSI
1 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
INSTRUMENTATION

2 ADVANCE INSTRUMENTATION MEASUREMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

CALCULATION UNDEFINITE MEASUREMENT RESULT AND


3 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
TESTING

4 FLOW MEASUREMENT AND CONTROL ELEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

FLUID FLOW MEASUREMENT AND METER PROVING IN OIL


5 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
AND GAS INDUSTRY

6 OIL & GAS: MEASUREMENT AND CALCULATION 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

7 PRODUCTION HANDLING SEPARATION AND MEASUREMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

8 SYSTEM MEASUREMENT AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

9 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

37 MECHANICAL / MEKANI K

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

ADVANCE PROCESS CONTROL, INSTRUMENTATION AND


1 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
METERING
2 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

3 BASIC MECHANICAL 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

4 BEARING AND OIL LUBRICATION FOR MACHINERY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

5 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

6 CAD FOR MECHANICAL: AUTOCAD OR CATIA 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

7 MECHANIC TRANMISION VOLT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

8 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

38 MINING

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 COAL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

2 COAL EXPLORATION (EKSPLORASI BATUBARA) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

3 COATING SYSTEM AND PROTECTION CORROSION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

4 DRILLING AND EXPLOSIVE IN MINING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

END WORK PROCESS WITH METAL COATING


5 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
(ELECTROPLATING)

GPS (GLOBAL POSITIONING SYSTEM) FOR MINING AND


6 PETROLEUM: PRINCIPLES, EQUIPMENT, DATA COLLECTING, 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
DATA PROCESSING, AND APPLICATION

7 MINING VENTILATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

8 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

39 OPERATION / OPERASI
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

2 MANUFACTURING PLANNING & CONTROL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

3 AC CONTROLLING SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

4 PRINCIPLE OF MANUFACTURING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

5 PRINCIPLE OF OPERATION PLANNING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

6 PRODUCTION PLAN & INVENTORY CONTROL (PPIC) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

ADVANCE COURSE ON LIGHTNING PROTECTION AND


7 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
GROUNDING SYSTEM

ADVANCE MAINTENANCE PLANNING, SCHEDULLING,


8 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
AUDITING, BENCHMARKING & IMPROVEMENT

ADVANCE PROCESS CONTROL, INSTRUMENTATION AND


9 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
METERING

10 ADVANCED OIL AND GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

11 LEADERSHIP FOR FOREMAN 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

12 ADVANCED PLC PROGRAMMING AND IMPLEMENTATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

13 AIR AND SEA CARGO HANDLING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

14 AIR CONDITIONING AND HVAC 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

15 HEAT EXCHANGER : OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

16 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

17 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR
18 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
EXECUTIVES

19 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

20 ADVANCED PROJECT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

21 VIBRATION ANALISIS IN ROTARY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

22 ESSENTIALS OF PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

23 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

24 AUDIT DAN MANAJEMEN ENERGI LISTRIK 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &


25 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
ENVIRONMENTAL CONSIDERATION

26 BASIC GAS COMPRESSOR: OPERATION & MAINTENANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

27 PROJECT LEADERSHIP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

28 PROJECT RISK MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

29 BASIC REFRIGERATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

BASIC RESERVOIR ENGINEERING FOR NON PETROLEUM


30 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
ENGINEER

31 BASIC SURFACE SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

32 BEARING AND OIL LUBRICATION FOR MACHINERY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

33 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

34 BELT CONVEYOR : OPERATION & MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

BOILER AND TURBIN UAP: OPERATION, MAINTENANCE DAN


35 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
TROUBLESHOOTING
36 BOILER WATER TREATMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

37 BOILER: OPERATION, MAINTENANCE & TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

38 RISK MANAGEMENT ON OPERATIONAL BUSINESS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

39 BOOST YOUR CREATIVITY IN THINKING: MIND MAP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

40 NON DESTRUCTIVE TEST (NDT) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

41 CAD FOR MECHANICAL: AUTOCAD OR CATIA 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

CALCULATION UNDEFINITE MEASUREMENT RESULT AND


42 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
TESTING

STEAM GENERATOR AND TURBINE: OPERATION AND


43 4 8.500.000
MAINTENANCE 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13

44 CATERING & ACCOMMODATION IN OIL & MINE INDUSTRY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

45 CATERING SERVICE, HYGIENE & SANITATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

46 BASIC GAS ENGINE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

47 BELT CONVEYOR : TECHNOLOGY, DESIGN CALCULATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

CENTRIFUGAL COMPRESSOR & STEAM TURBINE


48 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
PERFORMANCE

49 BOILER: OPERATION & MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

50 CENTRIFUGAL PUMP AND SEAL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

51 DIESEL ENGINE: OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

52 CHILLER AND COOLING TOWER: DESIGN AND OPERATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

53 BELT CONVEYOR MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
54 TOTAL PRODUCTIVE MAINTENANCE (TPM) 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

55 MECHANIC TRANMISION VOLT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

56 CAREER PLANNING SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

57 COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

COMPRESSOR : OPERATION, MAINTENANCE AND


58 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
TROUBLESHOOTING

59 CONDITIONS BASE INSPECTION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

60 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

CONTROL VALVE: OPERATION, MAINTENANCE, AND


61 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
TROUBLESHOOTING

62 CONVEYOR: OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

63 CORROSION AND CATHODIC PROTECTION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

64 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

65 DANGEROUS GOODS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

66 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

67 BASIC TECHNICAL CONTROL FOR INDUSTRY 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

BOILER, TURBIN (STEAM) : OPERATION MAINTENANCE AND


68 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
TROUBLESHOOTING

69 GENERATOR: TEKNOLOGY, OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVE


70 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
MAINTENANCE)
DESIGN OF HEATING, VENTILATION AND AIR CONDITIONING
71 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
SYSTEM

VECHICLE MAINTENANCE TECHNIC (PREVENTIVE


72 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
MAINTENANCE)

73 MECHANICAL MAINTENANCE TECHNIC 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

DESIGN OF JIGS AND FIXTURES ( ALAT BANTU CEKAM DAN 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
74 4 8.500.000
PEGANG)

DESIGN OF PRESS AND FORMING TOOL (ALAT PENEKAN DAN


75 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
PEMBENTUK)

DESIGN OF MACHINE CONSTRUCTION AND INDUSTRIAL


76 4 8.500.000
EQUIPMENT (KONSTRUKSI MESIN DAN PERALATAN INDUSTRI) 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13

77 OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

DISTRIBUTED CONTROL SYSTEM (DCS): PRINCIPLES AND 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
78 5 9.500.000
APPLICATION

79 ALIGNMENT, LEVELLING AND ROTOR BALANCING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

DISTRIBUTION SYSTEM: FUZZY LOGIC & METERING LOAD


80 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
CONTROL

81 DRILLING ENGINEERING AND WELL PLANING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

82 ALARM AND PROTECTIVE DEVICES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

83 BASIC MACHINERY VIBRATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

84 BASIC VIBRATION ANALYSIS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

CENTRIFUGAL COMPRESSOR PERFORMANCE & CONDITION


85 4 8.500.000
EVALUATION 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7
COMPRESSOR OPERATION, MAINTENANCE &
86 4 8.500.000
TROUBLESHOOTING 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13

87 CORROSION MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

88 FLANGE AND JOINT INTEGRITY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

89 INDUSTRIAL AUTOMATION & CONTROL 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

90 ADVANCE INSTRUMENTATION MEASUREMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

91 MACHINERY VIBRATION ANALYSIS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

92 MAINTENANCE MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR,


POTENSI 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20
93 4 8.500.000
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
INSTRUMENTATION

94 PROCESS CONTROL INSTRUMENTATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

95 SCADA FOR ENGINEER 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

96 SCADA FOR OPERATOR & TEKNICIAN 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

97 ELECTROPLATING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

98 SYSTEM MEASUREMENT AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

99 THEORY AND APPLICATION BELT CONVEYOR 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

100 ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

101 FAILURE ANALYSIS METHODS AND CASES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

102 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

103 FLIGHT OPERATION MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
104 FINANCING CONDOTEL/HOTEL OPERATION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

105 FLOW MEASUREMENT AND CONTROL ELEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

FLUID FLOW MEASUREMENT AND METER PROVING IN OIL


106 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
AND GAS INDUSTRY

107 FORMATION DAMAGE AND WELL STIMULATION 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

GAS AND STEAM TURBINE : OPERATION, MAINTENANCE AND


108 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
TROUBLESHOOTING

109 GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

110 GAS METAL ARC WELDING (LAS MIG/MAG) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

111 GEOLOGY FOR NON GEOLOGIST 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

GPS (GLOBAL POSITIONING SYSTEM) FOR MINING AND


112 PETROLEUM: PRINCIPLES, EQUIPMENT, DATA COLLECTING, 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
DATA PROCESSING, AND APPLICATION

113 H2S AWARENESS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

114 HAND TOOL UTILIZATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

115 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

116 HAZARDOUS MATERIAL HANDLING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

HEAT EXCHANGERS: OPERATION, MAINTENANCE AND


117 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
TROUBLESHOOTING

118 HEAVY DUTY EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

119 HEAVY EQUIPMENT MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

HIGH PRESSURE PUMP (HPP): OPERATION, MAINTENANCE AND


120 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
TROUBLESHOOTING
121 HSE AUDIT TECHNIQUES 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

122 HVAC SYSTEM: OPERATION AND MAINTENANCE 5 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 9.500.000

123 HYDRAULIC/PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

124 HYDRAULICS AND PNEUMATICS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

125 INDUSTRIAL COMBUSTION AND BURNER 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

126 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

127 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

128 INFORMATION TECHNOLOGY PROJECT MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

129 INSTRUMENTATION AND CALIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

INTEGRATED PIPELINE DESIGN, OPERATION DAN


130 4 8.500.000
MAINTENANCE 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13

INVENTORY MANAGEMENT AND COST INVESTMENT


131 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
RECOVERY

132 INVENTORY AND WAREHOUSE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

133 INVENTORY MANAGEMENT FOR RAW MATERIAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

134 KINEMATICS AND DYNAMICS OF MACHINERIES 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR OIL


135 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
AND GAS REFINERY AND PETROCHEMICAL INSTALLATION

LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR


136 POWER PLANT, TRANSMISSION, DISTRIBUTION AND LARGE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
INDUSTRY

137 LIGTNING PROTECTION & GROUNDING SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
138 LUBRICATION AND BEARING TECHNOLOGY 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

139 BASIC PRINCIP LUBRICATION AND APLICATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

140 MACHINERY NOISE AND PROBLEM SOLVING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

MAINTENANCE PLANNING, SCHEDULLING AND WORK


141 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
CONTROL

142 MAINTENANCE MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

MAINTENANCE MANAGEMENT (FOR MANUFACTURE AND OIL


143 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
& GAS COMPANY

144 MAN POWER PLANNING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

145 OPERATION MANAGEMENT PRODUCTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

146 MATERIAL MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

147 SERVICE REPAIR MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

148 MANUFACTURING PROCESS TO USE CNC MACHINING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

149 MANUFACTURING PROCESSES TO USE CASTING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

150 MANUFACTURING PROCESSES TO USE METAL FORMING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

151 NEGOTIATION SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

152 NEGOTIATION SKILL FOR PURCHASING STAFF 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL IN


153 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
THE OIL & GAS INDUSTRY

154 OFFSHORE WELLHEAD PLATFORM OPERATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

155 OIL & GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
156 OIL & GAS: MEASUREMENT AND CALCULATION 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

157 OIL AND GAS HANDLING FACILITIES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

OIL AND GAS WELLS STIMULATION BY ACIDIZING AND


158 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
HYDRAULIC FRACTURING

OIL FIELD AND 100 METHODS TO MAINTAIN AND INCREASE


159 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
PRODUCTION

OIL FILM BEARING (JOURNAL DAN THRUST BEARING /


160 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
HYDRODYNAMIC BEARINGS)

161 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

OPERATING SYSTEMS TECHNOLOGIES AND INSTALLATION


162 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
PROCEDURES

163 OPTIMIZATION FOR PRODUCTION SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

164 IMPLEMENTATION AND PROBLEM IN LAND ACCUSATIONS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

165 POWER PLANT ELECTRICAL DISTRIBUTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

WATER SURFACE FLOW AS OIL FENCE IN OIL SPILL


GATHERING
166 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
(PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL OIL
FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK)

167 DRILLING AND EXPLOSIVE IN MINING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

168 MATERIAL HANDLING & APLICATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

169 DESTRUCTIVE TEST SERTIFICATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

170 PLANT LAYOUT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

171 MAINTENANCE PLANNING AND SCHEDULING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
172 PETROLEUM ENGINEERING FOR NON PETROLEUM ENGINEERS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

PETROLEUM INDUSTRIAL REFRIGERATION: OPERATION AND


173 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
MAINTENANCE

174 PIGGING OPERATIONS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

175 PNEUMATIC CONTROL SYSTEM 5 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 9.500.000

PUMP AND COMPRESOR: OPERATION, COMPRESSOR AND


176 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
MAINTENANCE TROUBLESHOOTING

177 PUMP OPERATION AND MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

POWER DISTRIBUTION SYSTEM: OPERATION AND


178 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
CHARACTERISTIC

179 POWER DISTRIBUTION SYSTEM: PROTECTION AND RELAYING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

180 POWER MANAGEMENT SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

181 PREDICTIVE MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

PRESSURE VESSELS : CALCULATION, CODES, PRODUCTION,


182 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
OPERATION, CONTROLS AND SAFETIES

183 PROCESS CONTROL AND INSTRUMENTATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

184 PROCESS CONTROL AND LOOP 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

185 PRODUCED WATER TREATMENT FOR RE-INJECTION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

186 PRODUCTION AND OPERATION MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

187 PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

188 PRODUCTION HANDLING SEPARATION AND MEASUREMENT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

189 PRODUCTION OF HELICAL GEAR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
190 PRODUCTION OPERATION MANAGEMENT FOR MANAGERS 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

191 PRODUCTION SAFETY SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

KOMPETENSI TRAINING FOR SENIOR SAFETY (IN LIMITED


192 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
SPACE)

193 PROJECT MANAGEMENT (PM) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

PROJECT MANAGEMENT (USING WIN QSB & MICROSOFT


194 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
PROJECT)

195 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

END WORK PROCESS WITH METAL COATING


196 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
(ELECTROPLATING)

197 PUMP : OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

PUMP AND COMPRESSOR : OPERATION, MAINTENANCE AND


198 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
TROUBLESHOOTING

PUMP SELECTION, DESIGN AND OPERATION FOR OIL AND GAS


199 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
SURFACE PRODUCTION FACILITIES

200 RECIPROCATING COMPRESSOR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

201 REFRACTORY AND HEAT INSULATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

REFRIGERATION : OPERATION, MAINTENANCE AND


202 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
TROUBLESHOOTING

203 RELIABILITAS SISTEM : TO EVALUATE MAINTENANCE RESULT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

RELIABILITY CENTERED MAINTENANCE & RISK BASED


204 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
INSPECTION

205 RELIABILITY CENTERED MAINTENANCE (RCM) 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
SAFETY RELIEF VALVE: FUNDAMENTAL CONCEPTS, SIZING 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
206 5 9.500.000
AND SELECTION

SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION): 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
207 PRINCIPLES, HARDWARE SYSTEM, OPERATION & 5 9.500.000
PROGRAMMING

208 SIX SIGMA CHAMPIONS 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

STEAM TURBINE: OPERATION, MAINTENANCE AND


209 3 6.500.000
TROUBLESHOOTING 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5

SUCKER ROD PUMP: DESIGN, OPERATION AND


210 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
TROUBLESHOOTING

211 TECHNIC FOR HUMAN RELATIONS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

212 TECHNIC INSTALATION AND ELECTRICAL PROTECTION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

213 TECHNIC VECHILES MAINTENANCE 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

214 TECHNIC MACHANICAL MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

215 TECHNOLOGY ENGINE MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

216 TESTING OF MACHINE TOOLS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

217 TIG AND MIG WELDING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

218 TRAFO: PRINCIPLES, APPLICATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

219 MECHANICAL POWER TRANSMISSION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

TROUBLE SHOOTING, INSPECTION, AND MONITORING OF


220 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
MACHINERY

221 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

222 WAREHOUSING & DISTRIBUTION MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
223 WATER TREATING AND CHEMICALS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

224 WELL COMPLETION AND WORK OVER 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

225 INVETIGASI KECELAKAAN 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

226 OPERATION AND MAINTENANCE KUBIKAL LOW 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

40 PIPING / PIPA

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

INTEGRATED PIPELINE DESIGN, OPERATION DAN


1 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
MAINTENANCE

2 FLANGE AND JOINT INTEGRITY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

3 PIPING SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

5 VALVE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

6 PROCESS PIPING & PIPELINE SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

7 PIPELINE : DESIGN, TESTING, INSPECTION AND MAINTENANCE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

8 VALVE (CHOKE & CONTROL VALVE) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

41 PLAT

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 MANUFACTURING PLANNING & CONTROL 2 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 4.500.000

2 ELECTROPLATING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

END WORK PROCESS WITH METAL COATING


3 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
(ELECTROPLATING)
4 OFFSHORE WELLHEAD PLATFORM OPERATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

5 PRINCIPLE OF MANUFACTURING MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

6 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

42 PROCUREMENT / PENGADAAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINNER) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

2 BASIC PROCUREMENT & PURCHASING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 E-PROCUREMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

INFORMATION SYSTEMS AND INFORMATION TECHNOLOGIES


4 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
FOR SUPPLY CHAIN MANAGEMENT

INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (I T I


5 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
L) VERSION 3.1

6 LOGISTIC AND SUPPLY CHAIN MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

7 LOGISTIC MANAGEMENT 2 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 4.500.000

8 LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

9 MATERIAL SELECTION MACHINE COMPONENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

METHODE TO SET COMPANY HPS "TECHNIC AND PROCEDURE


10 PRICE CALCULATION IN THE AUCTION OF GOOD SERVICE OF 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
COMPANY"

11 PRACTICAL SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

12 PROCUREMENT AND CONTRACT MONITORING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

13 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY
14 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
CHAIN

43 PRODUCTION / PRODUKSI

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

ADVANCE PROCESS CONTROL, INSTRUMENTATION AND


1 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
METERING

2 ADVANCED OIL AND GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

3 HEAT EXCHANGER : OPERATION AND MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

BASIC RESERVOIR ENGINEERING FOR NON PETROLEUM 5


4 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
ENGINEER

CENTRIFUGAL COMPRESSOR & STEAM TURBINE


5 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
PERFORMANCE

6 CENTRIFUGAL PUMP AND SEAL 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

FLUID FLOW MEASUREMENT AND METER PROVING IN OIL


7 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
AND GAS INDUSTRY

8 ELECTRICITY POWER SUBSTATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

9 GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

HIGH PRESSURE PUMP (HPP): OPERATION, MAINTENANCE AND


10 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
TROUBLESHOOTING

11 INDUSTRIAL COMBUSTION AND BURNER 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

12 INDUSTRIAL HYGIENE (HIGIENE INDUSTRI) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

13 INDUSTRIAL PROCESS CONTROL & INSTRUMENTATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

14 OPERATION MANAGEMENT PRODUCTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
15 OIL & GAS PRODUCTION SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

OIL AND GAS WELLS STIMULATION BY ACIDIZING AND


16 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
HYDRAULIC FRACTURING

OIL FIELD AND 100 METHODS TO MAINTAIN AND INCREASE


17 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
PRODUCTION

18 OPTIMIZATION FOR PRODUCTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

PRESSURE VESSELS : CALCULATION, CODES, PRODUCTION,


19 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
OPERATION, CONTROLS AND SAFETIES

20 PRODUCED WATER TREATMENT FOR RE-INJECTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

21 PRODUCTION AND OPERATION MANAGEMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

22 PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

23 PRODUCTION HANDLING SEPARATION AND MEASUREMENT 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

24 PRODUCTION OF HELICAL GEAR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

25 PRODUCTION OPERATION MANAGEMENT FOR MANAGERS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

26 PRODUCTION SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

27 RECIPROCATING COMPRESSOR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

28 REFRACTORY AND HEAT INSULATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

29 SIMULATION PROCESS CHEMICAL TECHNIC USING HYSYS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

SUCKER ROD PUMP: DESIGN, OPERATION AND


30 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
TROUBLESHOOTING

31 SURFACE PRODUCTION OPERATION & EQUIPMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

32 SYSTEM AND COST PRODUCTION 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
33 WELL COMPLETION AND WORK OVER 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

34 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

35 TOTAL PRODUCTIVE MAINTENANCE (TPM) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

44 PROJECT / PROJEK

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 PROJECT MANAGEMENT (PM) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

2 ADVANCED PROJECT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 ESSENTIALS OF PROJECT MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

4 IT PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

5 PROJECT COST MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

6 PROJECT LEADERSHIP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

PROJECT MANAGEMENT (USING WIN QSB & MICROSOFT


7 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
PROJECT)

8 PROJECT MANAGEMENT based on PRINCE2 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

9 PROJECT MANAGEMENT FUNDAMENTALS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

10 PROJECT MANAGEMENT USING MICROSOFT PROJECT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

11 PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

12 PROJECT RISK MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

13 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

14 SOFTWARE PROJECT MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
45 PUBLIC RELATIONS / HUMAS

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 BUILDING POTENTIAL LEADER THROUGH POSITIVE HABITS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

2 CREATIVE PROBLEM SOLVING AND SHARP DECISION MAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

3 EFFECTIVE HANDLING COMPLAINT AND PROBLEM SOLVING 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 4.500.000

4 EFFECTIVE MASTER OF CEREMONY (MC) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

EXCELLENT MOTIVATION AND TEAM WORK OUTBOUND


5 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
TRAINING

6 vLEADERSHIP DEVELOPMENT PROGRAM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

7 LEADERSHIP FOR FOREMAN 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

8 POSITIVE FIGHTER FOR SALES PEOPLE 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

9 POWERFUL COMMUNICATION SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

10 POWERFUL PUBLIC SPEAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

11 POWERFUL SUPERVISOR DEVELOPMENT PROGRAM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

12 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

13 SERVICE WITH DELIGHT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

14 BUILDING A TEAM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

15 CAREER PLANNING SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

16 DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

COMMUNICATION STRATEGY WITH GOFERNMENT


17 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
INSTITUTION
18 EFFECTIVE PRESENTATION (PRESENTASI YANG EFEKTIF) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

19 EFFECTIVE PRESENTATION SKILLS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

20 NEGOTIATION SKILL 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

21 SUPERVISORY SKILL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

22 LEADER AS A C.O.A.C.H 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

23 LEADERSHIP FOR QUALITY MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

24 MC (MASTER OF CEREMONY) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

25 MEDIA RELATION AND COMMUNICATION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

26 MEDIA RELATIONS STRATEGY AND EXECUTIONS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

27 MEDIA RELATIONS STRATEGY FOR EFFECTIVE PROMOTION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

28 IMPLEMENTATION AND PROBLEM IN LAND ACCUSATIONS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

29 DECISION MAKING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

PERSONALITY DEVELOPMENT BASED ON EMOTIONAL AND


30 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
SPRITUAL QUETIENTS

31 POWERFUL PRESENTATION EXCELLENCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

32 PRACTICAL CUSTOMER SERVICE 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING


33 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
STAFF (USING MICROSOFT POWER POINT)

34 PRESENTATION SKILL FOR THE BEGINNERS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 4.500.000

35 PROBLEM SOLVING & DECISION MAKING 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

36 SERVICE EXCELLENT 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
37 SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FOR LIFE 2 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 4.500.000

38 SPARE PARTS MANAGEMENT 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

SPEAKING FOR BUSINESS (PRESENTATION, NEGOTIATION AND


39 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
LOBBYING)

40 SUPERVISORY LEADERSHIP AND DECISION MAKING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

41 TECHNIC FOR HUMAN RELATIONS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

42 WORKING AS A TEAM EXCELLENCE 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

43 WORKLOAD ANALYSIS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

46 PUMP

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 CENTRIFUGAL PUMP AND SEAL 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

ELECTRIC SUBMERSIBLE PUMP : PRINCIPLES, INSTALLATION,


2 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
OPERATION, MAINTENANCE AND TROUBLESHOOTING

HIGH PRESSURE PUMP (HPP): OPERATION, MAINTENANCE AND


3 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
TROUBLESHOOTING

4 PIPELINE : DESIGN, TESTING, INSPECTION AND MAINTENANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 4.500.000

PUMP AND COMPRESOR: OPERATION, COMPRESSOR AND


5 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
MAINTENANCE TROUBLESHOOTING

6 PUMP OPERATION AND MAINTENANCE 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

7 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

SUCKER ROD PUMP: DESIGN, OPERATION AND


8 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
TROUBLESHOOTING
47 SAFETY / KEAMANAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

ADVANCE COURSE ON LIGHTNING PROTECTION AND


2 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
GROUNDING SYSTEM

BASIC DRILLING ENGINEERING AND HEALTH, SAFETY &


3 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
ENVIRONMENTAL CONSIDERATION

4 BASIC SURFACE SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

5 CORROSION AND CATHODIC PROTECTION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

6 DANGEROUS GOODS 2 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 4.500.000

7 EFFLUENT PRODUCED WASTE WATER 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

8 EMERGENCY PREPAREDNESS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

9 ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

10 FAILURE ANALYSIS METHODS AND CASES 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

11 FAILURE MODE AND EFFECT ANALYSIS (FMEA) 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

12 H2S AWARENESS 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

13 HAND TOOL UTILIZATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

14 HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

15 HAZARDOUS MATERIAL HANDLING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR OIL


16 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
AND GAS REFINERY AND PETROCHEMICAL INSTALLATION
LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR
17 POWER PLANT, TRANSMISSION, DISTRIBUTION AND LARGE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
INDUSTRY

18 LIGTNING PROTECTION & GROUNDING SYSTEM 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL IN


19 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
THE OIL & GAS INDUSTRY

WATER SURFACE FLOW AS OIL FENCE IN OIL SPILL


GATHERING
20 3 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
(PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL OIL 8-10
FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK)

21 DRILLING AND EXPLOSIVE IN MINING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

22 HAZARD ANALYSIS CRITICAL CONTROL POINT (HACCP) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

PRESSURE VESSELS : CALCULATION, CODES, PRODUCTION,


23 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
OPERATION, CONTROLS AND SAFETIES

24 PRODUCTION SAFETY SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

KOMPETENSI TRAINING FOR SENIOR SAFETY (IN LIMITED


25 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
SPACE)

26 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

SAFETY RELIEF VALVE: FUNDAMENTAL CONCEPTS, SIZING 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
27 5 9.500.000
AND SELECTION

28 TECHNIC INSTALATION AND ELECTRICAL PROTECTION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

29 TRAINING OF TRAINERS SAFETY 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

WASTE HANDLING & TREATMENT IN THE OIL & GAS


30 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
INDUSTRIES

31 WATER TREATING AND CHEMICALS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000
32 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

33 ISO 27001: INFORMATION SECURITY MANAGEMENT SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

34 NON DESTRUCTIVE TEST (NDT) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

35 BIO SAFETY AND BIO SECURITY 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

48 SUPPLY CHAIN / PENYEDIAAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 BASIC OF SUPPLY CHAIN MANAGEMENT (FOR BEGINNER) 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

2 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

3 PRACTICAL SUPPLY CHAIN MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

4 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

49 SYSTEM / SISTEM

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 15-18 19-22 19-22 23-26 21-24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

2 AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

3 AC CONTROLLING SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

ADVANCE COURSE ON LIGHTNING PROTECTION AND


4 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
GROUNDING SYSTEM

5 ADVANCED OIL AND GAS PRODUCTION SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

6 ALIGNMENT AND VIBRATION INSPECTION SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

7 AUDIT ENERGY AND POWER SYSTEM MANAGEMENT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
8 AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

9 BASIC SURFACE SAFETY SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

10 BEARING TECHNOLOGY AND ENGINE LUBRICATION SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

11 CONTROL SYSTEM FOR NON CONTROL ENGINEER 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

DESIGN OF MACHINE CONSTRUCTION AND INDUSTRIAL


12 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
EQUIPMENT (KONSTRUKSI MESIN DAN PERALATAN INDUSTRI)

DISTRIBUTED CONTROL SYSTEM (DCS): PRINCIPLES AND


13 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
APPLICATION

DISTRIBUTION SYSTEM: FUZZY LOGIC & METERING LOAD


14 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
CONTROL

ELECTRIC MOTOR SYSTEM : PRINCIPLES, APPLICATIONS &


15 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
CONTROL

ELECTRICAL MACHINES, DRIVES, TRANSFORMER AND POWER


16 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
SYSTEM

17 ELECTRICAL POWER SYSTEM ANALYSIS 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

18 ELECTRICAL POWER SYSTEM ANALYSIS AND PROTECTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

19 ELECTRONIC FILLING SYSTEM MANAGEMENT 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

FAULT POTENSIAL IN MEASUREMENT SYSTEM, SENCOR,


POTENSI
20 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
KESALAHAN PADA SISTEM PENGUKURAN, SENSOR, AND
INSTRUMENTATION

GPS (GLOBAL POSITIONING SYSTEM) FOR MINING AND


21 PETROLEUM: PRINCIPLES, EQUIPMENT, DATA COLLECTING, 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
DATA PROCESSING, AND APPLICATION

22 GROUNDING SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
23 HVAC SYSTEM: OPERATION AND MAINTENANCE 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

24 HYDRAULIC CONTROL SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

25 HYDRAULIC/PNEUMATIC & ELECTRIC CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

INFORMATION SYSTEMS AND INFORMATION TECHNOLOGIES


26 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
FOR SUPPLY CHAIN MANAGEMENT

INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (I T


27 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
I L) VERSION 3.1

28 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

29 ISO 27001: INFORMATION SECURITY MANAGEMENT SYSTEM 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000

30 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

31 ISO/IEC 9000 : 2008 QUALITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR OIL


32 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
AND GAS REFINERY AND PETROCHEMICAL INSTALLATION

33 MAINTENANCE SYSTEM AND DOCUMENTATION 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

34 MAINTENANCE: SYSTEM AND COST 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

35 OIL & GAS PRODUCTION SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

36 OPTIMIZATION FOR PRODUCTION SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

37 PIPING SYSTEM 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

POWER DISTRIBUTION SYSTEM: OPERATION AND


38 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
CHARACTERISTIC

39 POWER DISTRIBUTION SYSTEM: PROTECTION AND RELAYING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

40 POWER MANAGEMENT SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
41 PRACTICAL AND ADVANCED COURSE ON HVAC SYSTEMS 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

42 PRINCIPLE OF OPERATION PLANNING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

43 PROCESS PIPING & PIPELINE SYSTEM 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

44 SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

45 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION):


46 PRINCIPLES, HARDWARE SYSTEM, OPERATION & 5 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21 9.500.000
PROGRAMMING

47 STRUCTURE CABLING SYSTEM BY SYSTIMAX 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (


48 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
SCADA )

49 SYSTEM AND COST PRODUCTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

50 SYSTEM MEASUREMENT AND CALIBRATION 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

51 SYSTEMS ANALYSIS AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

52 SYSTEMS ANALYSIS AND DESIGN WITH UML 3


22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

50 TECHNIC / TEKNIK

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 APPLICATION STATISTIC IN ENGINEERING INDUSTRY 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

BASIC DRILLING ENGINEERING AND HEALTH, SAFETY & 22-26 5-9 19-23 23-27 21-25 25-29 2-6 27-31 3-7 22-26 5-9 17-21
2 5 9.500.000
ENVIRONMENTAL CONSIDERATION

3 BASIC PETROLEUM ENGINEERING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
BASIC RESERVOIR ENGINEERING FOR NON PETROLEUM
4 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
ENGINEER

CHEMICAL ENGINEERING FUNDAMENTALS FOR NON


5 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
ENGINEER

6 BASIC TECHNICAL CONTROL FOR INDUSTRY 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

7 GEOLOGY FOR NON GEOLOGIST 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

GPS (GLOBAL POSITIONING SYSTEM) FOR MINING AND


8 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
PETROLEUM: PRINCIPLES, EQUIPMENT, DATA COLLECTING,
DATA PROCESSING, AND APPLICATION

9 INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

10 IT AUDIT PRACTICES 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

11 IT HELPDESK 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

12 WAREHOUSE COMPUTERISATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

13 LUBRICATION AND BEARING TECHNOLOGY 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

14 BASIC PRINCIP LUBRICATION AND APLICATION 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

15 MASTERING MICROSOFT EXCEL 2007 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

16 MICRO CONTROLLER APPLICATION IN INDUSTRIAL PLANTS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

17 NON DESTRUCTIVE TEST (NDT) 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

18 NON DESTRUCTIVE TESTING (NDT) 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

19 NUMERICAL CONTROL AND ROBOTIC 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

OIL FILM BEARING (JOURNAL DAN THRUST BEARING /


20 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
HYDRODYNAMIC BEARINGS)
OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTED
21 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
COMPONENT OBJECT MODEL (DCOM)

OPERATING SYSTEMS TECHNOLOGIES AND INSTALLATION


22 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
PROCEDURES

23 SITUS WEB DEVELOPMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

24 TEKNOLOGI DEVELOPMENT AND STANDARD MATERIAL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

25 HEAT TREATMENT FOR METAL 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

PLC (ROGRAMMABLE LOGIC CONTROLLER): PRINCIPLES,


26 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
OPERATION AND PROGRAMMING

27 PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

28 PROCESS CONTROL AND LOOP 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000

29 PROCESS PIPING & PIPELINE SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

30 PROGRAMMABLE LOGIC CONTROLLER (PLC) 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

PROGRAMMABLE LOGIC CONTROLLER (PLC): ADVANCED AND


31 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
APPLICATED

PROGRAMMABLE LOGIC CONTROLLER (PLC): PRINCIPLES,


32 HARDWARE AND SOFTWARE, DIAGNOSTICS AND 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
TROUBLESHOOTING

PROJECT MANAGEMENT (USING WIN QSB & MICROSOFT


33 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
PROJECT)

34 PROCES MACHINING 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

35 PUMP : OPERATION, MAINTENANCE AND TROUBLESHOOTING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

PUMP AND COMPRESSOR : OPERATION, MAINTENANCE AND


36 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
TROUBLESHOOTING
PUMP SELECTION, DESIGN AND OPERATION FOR OIL AND GAS
37 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
SURFACE PRODUCTION FACILITIES

SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION):


38 PRINCIPLES, HARDWARE SYSTEM, OPERATION & 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
PROGRAMMING

39 ELECTRICAL MOTOR CONTROL SYSTEM 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

40 STRATEGIC HEALTH INFORMATION SYSTEM IN HOSPITAL 5 8-12 5-9 5-9 2-6 21-25 25-29 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

41 STRUCTURE CABLING SYSTEM BY SYSTIMAX 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

FISIBILITY STUDY FOR INVESTMENT USING APLICATION


42 4 8.500.000
MICROSOFT EXCEL 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM ( 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14
43 5 9.500.000
SCADA )

44 TECHNIC FOR OWN CALCULATION (HPS) 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

TECHNIC FOR ENERGY CONSERVATION THRU ENERGY AUDIT


45 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000
IN BUILDING

46 TECHNOLOGY CAD/CAM 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

47 TECHNOLOGY ENGINE MAINTENANCE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

48 TESTING OF MACHINE TOOLS 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

49 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

50 IT BALANCED SCORECARD 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

51 IT PROJECT MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

52 IT RISK MANAGEMENT 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000

53 ITIL V.3 FOUNDATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
54 MANAGING SOFTWARE REQUIREMENTS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

55 PRIMAVERA P6 PROFESSIONAL FUNDAMENTAL 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

56 PROJECT MANAGEMENT based on PRINCE2 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

57 PROJECT MANAGEMENT USING MICROSOFT PROJECT 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

58 SOFTWARE PROJECT MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

59 SOFTWARE QUALITY ASSURANCE 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

60 SOFTWARE TESTING FOUNDATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

61 SYSTEMS ANALYSIS AND DESIGN WITH UML 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

62 SYSTEMS ANALYSIS AND DESIGN 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

63 ISO 27001: INFORMATION SECURITY MANAGEMENT SYSTEM 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

64 ISO 31000 - RISK MANAGEMENT : PRINCIPLES AND GUIDELINES 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

65 ISO/IEC 9000 : 2008 QUALITY MANAGEMENT SYSTEM 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

66 ISO 28000: SUPPLY CHAIN SECURITY MANAGEMENT SYSTEM 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

67 ISO/IEC 20000: IT SERVICE MANAGEMENT 3 22-24 5-7 26-18 16-18 14-16 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

68 ISO/IEC 38500: IT-GOVERNANCE 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

69 ASME PTC 4 – 1 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

70 BASIC GAS ENGINE 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

71 ENERGY CONSERVATION TECHNIC ON BUILDING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

72 MAINTENANCE OF MACHINE TOOLS 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

73 SCADA FOR ENGINEER 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
74 SCADA FOR OPERATOR & TEKNICIAN 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

VECHICLE MAINTENANCE TECHNIC (PREVENTIVE


75 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
MAINTENANCE)

76 ISO 9001 : 2015 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

51 TURBIN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 14-16 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

STEAM TURBINE: OPERATION, MAINTENANCE AND


2 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
TROUBLESHOOTING

BOILER AND TURBIN UAP: OPERATION, MAINTENANCE DAN


3 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
TROUBLESHOOTING

BOILER, TURBIN (STEAM) : OPERATION MAINTENANCE AND


4 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000
TROUBLESHOOTING

CENTRIFUGAL COMPRESSOR & STEAM TURBINE


5 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
PERFORMANCE

GAS TURBINE: OPERATION, MAINTENANCE AND


6 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000
TROUBLESHOOTING

7 GENSET: TEKNOLOGI, PERAWATAN DAN OPERASI 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000

STEAM GENERATOR AND TURBINE: OPERATION AND


8 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
MAINTENANCE

9 TURBIN & GENERATOR OPERATION 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

GAS AND STEAM TURBINE : OPERATION, MAINTENANCE AND


10 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000
TROUBLESHOOTING

11 OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000
52 VECHICLE / ENDARAAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

VECHICLE MAINTENANCE TECHNIC (PREVENTIVE


1 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000
MAINTENANCE)

2 TRANSPORTATION MANAGEMENT 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY


3 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000
CHAIN

53 VIBRATION / GETARAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 VIBRATION ANALISIS AND MECHANICAL MEASUREMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000

2 BASIC MACHINERY VIBRATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000

3 BASIC VIBRATION ANALYSIS 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

4 SAY NO!!! TO GIVE UP 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

5 VIBRATION ANALISIS IN ROTARY EQUIPMENT MAINTENANCE 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000

54 WAREHOUSE / GUDANG

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 AIR AND SEA CARGO HANDLING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

2 DANGEROUS GOODS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

3 INVENTORY AND WAREHOUSE MANAGEMENT 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

4 MATERIAL HANDLING & APLICATION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000
5 SAY NO!!! TO GIVE UP 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

6 WAREHOUSE MANAGEMENT : OPERATION AND CONTROL 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

7 WAREHOUSE COMPUTERISATION 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000

8 WAREHOUSING & DISTRIBUTION MANAGEMENT 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

WASTE HANDLING & TREATMENT IN THE OIL & GAS 10-12


9 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 6.500.000
INDUSTRIES

55 WATER / AIR

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 BOILER WATER TREATMENT 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

2 EFFLUENT PRODUCED WASTE WATER 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

3 PRODUCED WATER TREATMENT FOR RE-INJECTION 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

4 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

WATER SURFACE FLOW AS OIL FENCE IN OIL SPILL


GATHERING
5 3 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
(PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL OIL 8-10
FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK)

6 WATER TREATING AND CHEMICALS 3 22-24 5-7 26-18 16-18 7-9 25-27 16-18 6-8 17-19 1-3 5-7 17-19 6.500.000

56 WELDING / ENGELASAN

JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 BASIC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

2 METALLURGY IN WELDING 3 8-10 19-21 7-9 24-27 7-9 25-27 23-25 27-29 12-14 29-31 27-29 3-5 6.500.000
3 OXY ACETYLENE WELDING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 10-13 8.500.000

4 OXY ACETYLENE WELDING (LAS ASETILIN) 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 4-7 8.500.000

5 SAY NO!!! TO GIVE UP 3 2-4 19-21 13-15 2-4 14-16 20-22 2-4 13-15 3-5 15-17 21-23 10-12 6.500.000

6 TIG AND MIG WELDING 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000

7 WELDING INSPECTION 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000

8 WELDING METALLURGY 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

9 ARC WELDING 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

10 MANUAL METAL ARC WELDING (LAS LISTRIK) 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000

11 GAS METAL ARC WELDING (LAS MIG/MAG) 5 8-12 5-9 5-9 2-6 14-18 4-8 9-13 6-10 17-21 15-19 12-16 10-14 9.500.000

12 GAS TUNGSTEN ARC WELDING (LAS TIG) 5 22-26 5-9 19-23 2-6 21-25 25-29 9-13 27-31 17-21 22-26 12-16 17-21 9.500.000

57 OIL REFINERY
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No Topic Day Harga

1 RESEVOIR ENGINEERING 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000

2 PRODUCTION AND STIMULATION 4 15-18 19-22 19-22 23-26 21- 24 25-28 16-19 13-16 17-20 15-18 12-15 17-20 8.500.000

3 DRILLING DAN WELL CONTROL 4 23-26 19-22 5-8 17-20 22-25 25-29 24-27 7-10 24-27 8-11 26-29 23-26 8.500.000

4 COMPLETION, WORKOVER DAN KERJA ULANG SUMUR 4 2-5 19-22 12-15 2-5 14-17 4-7 9-12 28-31 24-27 8-11 26-29 2-5 8.500.000

S-ar putea să vă placă și