Smartfren LTE Hardware Installation

Standard installation

Approve By :
Indoor installation standard
• BBU B8200 installation
• Cable connection
• DC Power connection
• Laying cable and Labelling indoor
OVERVIEW BBU B8200
FAN

PM3

197mm
88.4mm

482.6mm

SA

CR0

3
Placement BBU B8200

Installed at
H002 Cabinet

Installed at
W201 Cabinet

Installed at
Bali Tower

© ZTE Corporation. All rights reserved


4
Installing B8200
Put and fasten the B8200, cable tray and DCPD6 ( applicable for H002 cabinet ) one by one in their corresponding positions in the cabinet.
BBU shall be equipped with
SA Connector is one anti-static wrist strap
installed firmly & its
grounding cable is
connected with BBU B8200
cabinet.
SA Cable BPN 2
PM 2
CR0 FAN
BPN 2 ESD Cable
PM 1 there is at least 3U free space
Connect to Eguard CCE1B (2U for B8200 and 1U for GPS
SA
installation panel), the B8200
can be installed in this rack.
BBU8200 shall be firmly installed with
all screws in cabinet specified in the
Engineering Design Pack Space 2U = 6 hole
Space 1 U = 3 Hole
SMA Cable
Top view Aresster Gps

Front view Connect the grounding terminal of B8200 to the grounding busbar in the cabinet with a short
GPS Installation panel grounding cable.
Connect the grounding busbar in the cabinet to the outdoor grounding busbar with the
grounding bus, If the B8200 is installed in a standard 19” cabinet of another vendor, the
Antenna GPS GPS Cable connections of its grounding cables are similar.

© ZTE Corporation. All rights reserved


5
Cable connection BBU B8200 FDD

FDD(S3)
Optical cable connect as per design R8862A (S3) R8862A (S2) R8862A (S1)
FDD(S2)
FDD FDD(S1)
A A A
N N N
T T T
TDD(S3)
TDD(S2)
TDD(S1)
TDD

RF Cable

TDD(S3)
TDD(S2)
TDD(S1)
FDD +TDD

DCPD
GPS
Optic cable

All Optical cable label must be clear Spiral for optic cable
FDD(S1) Cable power BBU
and neat and printed
FDD(S2)
B8200
FDD(S3)
Warp cable
IN CH
2
CH
1 Optical port
DB44 Electrical Port
Optical cable laying Aresster DB25
RS23
RS232

EGUARD
Indoor Optical Cables are wrapped in spiral wrap/ conduit © ZTE Corporation. All rights reserved
6
Power connection BBU B8200 4mm 6mm
10mm
2 0.5~1mm
2 2
2.5mm2

Select a proper tube terminal based on the cross Peel off the insulation layer of the
Insert the power cable into the power port on the PM The power cable cannot be directly connected to the power sectional area of the power cable. Too large a tube power cable, leaving 0.5 - 1 mm of the
board of B8200 and fasten it with screws. terminal of the DCPD. It must be crimped into a tube terminal may lead to poor connection, while too wires outside the tube terminal after the
terminal first. small a tube terminal may make the connection be cable is inserted into the terminal, as
In crimping the power cable, crimping pliers must be used. difficult. shown in the right figure.
Insert the power cable into the power port on the PM Otherwise, poor connection may be resulted Power RRU TDD Power RRU FDD
board of B8200 and fasten it with screws. in. Power BBU 1 2 1 23 1 2 3
All cable ties use as
per standard
installation

All Power cable label


must be clear and
After the cable is inserted into the tube terminal,
neat and printed at
use the crimping pliers to crimp the tube terminal.
both end
DC Power cable plugs are securely seated

LLVD1 BLVD
Radio Remote Unit connected to LLVD1

DC Power cable as
Verify that all power cable wiring and heat shrinkable per design / BOM
uses correct colors

© ZTE Corporation. All rights reserved


7
Cable connection BBU B8200
Power connection ZXDU68 W201 Power connection ZXDU48 H002 with DCPD6 Power connection Bali Tower

Power connection ZXDU48 H002 Without DCPD6

ZXDU48 H002 ACPDB ZXDU68 W201 ACPDB

© ZTE Corporation. All rights reserved


8
• Optic and power cable laying

installation
Outdoor
• GPS antenna installation
• RRU and Filter installation
• Antenna installation
Laying cable optic and power cable RRU
Horizontal laying cable Vertical laying cable Preparation cable

Labeling

SEC 1 SEC 2 SEC 3


Spare optic cable

less then 10m


More then 10m

© ZTE Corporation. All rights reserved


10
GPS installation position standard GPS ¼” jumper connector made-up
method

Antena gps pada tampilan


antena gps harus
ke atas 90
dipasang dalam 45.
derajat,seharusnya ada
area jangkauan
tidak ada bangunan atau
penangkal petir
bebas dari rintangan

Routing GPS jumper cable

After GPS feeder and Cable


power rru is grounded, the SMA cable connected to
grounding clip should be CH-1 port of GPS Surge
GPS antenna fixed SMA cable arrester
sealed by the way of GPS Jumper from
reliably, Antenna distance connected to CH-1
"1+3+3": First wrap 1 layer outdoor GPS antenna,
from pole/tower above port of GPS Surge
of insulation tape, then 3 connected tight Have
300mm,Installed in open arrester
layers of waterproof tape insulation tape over
position connector
and finally 3 layers of UV-
proof tape.
© ZTE Corporation. All rights reserved
11
Antenna Installation position
• Antenna are installed within the 45° protection scope of the lightning rod.

45° 45°

© ZTE Corporation. All rights reserved


12
Antenna fixing Upper bracket
Nut 2
Nut 1
Ring Washer
Flat Washer

Antenna bracket fixing is correct & reliable with


flat, spring washers, double nuts & bolt. Lower Bracket

© ZTE Corporation. All rights reserved


13
Antenna type, Installation position compliance

• Antenna type as per design pack

• Height as per design pack

• Azimuth as per design pack

• Mechanical tilt as per design pack

• Electrical tilt as per design pack

© ZTE Corporation. All rights reserved


14
Antenna Jumper installation
• Jumpers of each antenna connected at correct ports
• Waterproofing at antenna ports is as per standard, (1 layer +3
Laying Jumper
cable dibawah layers + 3 layers mode)
bracing
• At the antenna connectors, the jumper shall keep 300mm straight.
• Labeling of each jumper at both ends (200mm away from
connectors)
• Make RF jumper temporary labeling before installation.
• Use yellow color insulation tape ring for TDD and Red color tape
Temporary labeling ring for FDD labeling
before install
jumper

© ZTE Corporation. All rights reserved


15
Weatherproofing at RRU connectors
Step-1 Warp one layer Step- 2 Warp 3 layer Step 3 Wrap 3 layer
of insulation tape of waterproofing of insulation tape
End End
tie End

3 3

2 2

1 1

Start
tie
Start Start

© ZTE Corporation. All rights reserved


16
Weatherproofing at RF connectors
Step-1 Warp one layer Step- 2 1 layer of Step 3 cover
of insulation tape waterproofing and 2 layer installation of
insulation waterprofing

Start
Start Start

End End

End

© ZTE Corporation. All rights reserved


17
Color Labeling Jumper Antenna and RRU
Antenna 12 Port Antenna 8 Port

Color Labeling TDD

TDD
Port 1 Yellow ring 1
Port 2 Yellow ring 2
Port 3 Yellow ring 3
Port 4 Yellow ring 4
Port 5 blue ring 1 Yellow ring 1
Port 6 blue ring 1 Yellow ring 2 FDD TDD
Port 7 blue ring 1 Yellow ring 3
Port 8 blue ring 1 Yellow ring 4
FDD
Port 1 Red 1
Port 2 Red 2
Port 3 Red 3
Port 4 Red 4
© ZTE Corporation. All rights reserved
18
Jumper Connection

© ZTE Corporation. All rights reserved


19
Jumper
Connection

© ZTE Corporation. All rights reserved


20
Jumper Connection antenna LDXX

21
Jumper Connection antenna 4 port rosenberg

© ZTE Corporation. All rights reserved


22 22
Separated antenna TDD + FDD RET Connection

© ZTE Corporation. All rights reserved


23 23
RET Special request end to end connector
Installation Aisg cable need waterproofing
25
RRU installation

ZXSDR R8862A
FDD RRU 4 Port

ANT1
ANT8
TX/RX
TX/RX

PWR
OPT 1
OPT 2

CAL
PE
FDD RRU installation

27
TDD RRU installation

28
29
Power connection at RRU
Scale for making
Tube terminal diameter according to
power connector
the cross-section area of the power
cable.

Tube terminals -48VRTN

crimping of terminal
-48V
perfect

30
Standard for RRU power cable

31
Filter Installation

1. Number filter unit should as per design


pack

2. FDD filter unit are installed as per


standard installation

3. Jumper connected to FDD Filter unit as


per design pack.

4. Jumper cable to FDD Filter unit labeled


correctly, waterproof and easy to read
Grounding RRU and Filter Installation
Grounding cable connected to each of Radio Remote TDD
FDD
Unit (FDD & TDD) and Filter and integrated to the
Grounding bar
Kabel ground terhubung ke masing-masing Radio
Remote Unit (FDD & TDD) dan Filter dan terintegrasi ke
grounding bar

Critical 1 x Grounding cable from each equipment to


bus bar
Critical 1 x kabel grounding dari masing-masing Filte
perangkat ke bus bar Busbar
r

All grounding connection must be terminated with


cable
Lugs
Semua koneksi grounding harus diakhiri dengan kabel
lugs

Is terminated using heat-shrink/ sealant tape.


Diakhiri dengan menggunakan tape heat-shrink /
sealant
Label standards
• Printed labeling must be done GND Label Optic Label -48 VRTN Label

• Labels should be pasted at the both ends of all cables


(power cable, grounding cable, transmission cable, RF
Jumper, Optical fiber cable)
• All labels should be arranged nicely and orderly, in
same direction.
• Indoor labels should be pasted from Left to Right
direction
• All indoor labels must adopt a designated paper label. Power PM Label
-48 V Label

The outdoor labels should be the outdoor plastic tags;


• All indoor labels on power grounding, signal, optical
fiber cables are installed at 20mm distance from its
connector, MCB labeling is also required. -48 V Enclosure Label
GPS Label
• The specifications of the content of Label regulation for
power cables:
– Front display - Remote information
Labeling
Outdoor
• ZTE plastic tags should be fixed flowing the instructions as
below depending on the exact locations: Antenna jumper Label

- On the RF jumper cable 200mm away from antenna interface


port both end, keeping away from the water-proof tape; 13 cm
Waterproofing
- On the RRU power cable and optic cable 200 mm away from
20 cm
its cable entry in maintenance window.
ZTE outdoor plastic label
- On the GPS cable 200 mm away from GPS interface port.
Color Label
- On Filter use Red Insulation tape ring for labeling 200mm
distance from connector, (For Ant1- 1 ring of 5 layers, Ant 2- 2
Ring of 5 layers)
TDD Jumper Label FDD Jumper Label

GND Label

Filter Label
GPS Label

TDD Jumper Label