Documente Academic
Documente Profesional
Documente Cultură
A. Course Design
UNIT OF NOMINAL
MODULE TITLE LEARNING OUTCOME
COMPETENCY DURATION
1. Participate in 1.1 1.1.1 Obtain and convey 4 Hours
workplace Participating in workplace information.
communicatio workplace 1.1.2 Complete relevant work
communication. related documents.
n
1.1.3 Participate in workplace
meeting and discussion.
2. Work in 2.1 Working in 2.1.1 Describe and identify 4 Hours
team team team
environment environment. role and responsibility
in a
team.
2.1.2 Describe work as a team
member.
3. Practice 3.1 Practicing 3.1.1 Integrate personal 4hours
career career objectives with
professionalis professionalism. organizational goals.
3.1.2 Set and meet work
m
priorities.
3.1.3 Maintain professional
growth and development.
4. Practice 4.1 Practicing 4.1.1 Evaluate hazard and 6 hours
occupational risks.
health and occupational 4.1.2 Control hazards and
health and risks.
safety
safety 4.1.3 Maintain occupational
procedures procedures health and safety
. awareness.
COMMON COMPETENCIES
80 Hours
UNIT OF MODULE TITLE LEARNING OUTCOME NOMINAL
COMPETENCY DURATION
1.Develop and 1.1 Developing 1.1.1 Identify and access key 4 hours
update and updating sources of information on
industry industry the industry
1.1.2 Access, apply and share
knowledge knowledge
industry information
1.1.3 Update continuously
relevant industry
knowledge
2. Observe 2.1 Observing 2.1.1 Practice personal 2 hours
workplace workplace grooming and hygiene
hygiene hygiene 2.1.2 Practice safe and
hygienic handling storage and
procedures procedures
disposal of food and materials
3. Perform 3.1 Performing 1.1.1 Identify and explain the 4 hours
computer computer functions, general
operations operations features and capabilities
of both hardware and
software
1.1.2 Prepare and use
appropriate hardware
and software according to
task requirement
1.1.3 Use appropriate devices
and procedures to transfer
files/data
1.1.4 Produce accurate and
complete data according to the
requirements
1.1.5 Maintain computer
System
4. Perform 4.1 Performing 4.1.1 Practice workplace 4 hours
workplace workplace procedures for health,
and safety and safety and security
safety practices
practices
practices 4.1.2 Respond appropriately to
faults, problems and
emergency situations in
line with enterprise
guidelines
4.1.3 Maintain safe personal
presentation standards
5. Provide 5.1 Providing 5.1.1 Apply effective verbal and 4 hours
effective effective non-verbal
customer customer communication skills to
service respond to customer
service
needs
5.1.2 Provide prompt and
quality service to
customer
5.1.3 Handle queries promptly
and correctly in line with
enterprise procedures
5.1.4 Handle customer
complaints, evaluation
and recommendations
CORE COMPETENCIES
160 HOURS
RESOURCES:
List of recommended tools, equipment and materials for the training of 25
trainees for COMPUTER SYSTEM SERVICING NCII
BASED ON TR
QUANTITY * TOOLS
10 pieces Screwdriver (standard)
10 pieces Screwdriver (Philips)
10 pieces Long nose pliers
10 pieces Mechanical pliers
10 sets Allen wrench
10 pieces Crimping tools
10 pieces Soldering iron
10 pieces Solder sucker
5 pieces Wire stripper
1 unit Portable electric hand drill
1 set Drill bit
5 sets Precision screw drivers
10 pcs Anti-static devices
5 pcs Flash light/Head mounted light
QUANTITY * EQUIPMENT
26 units Desktop Computer
10 Laptop computer/Netbook
10 Computers for server
10 Server cabinet/Frame
20 pcs Patch panel (48-ports)
10 sets Working tables
1 unit Internet subscription (at least 2 MBPS)
10 units Uninterruptible Power Supply (UPS)
10 unit Hub / Switch
2 units Managed switch
1 Network controller
11 ADSL Router with Wi-Fi
10 Wireless Access Point
1 unit PC Video camera
2 units External optical drive
1 unit USB External HD
1 unit Network External HD
1 unit scanner
1 unit USB printer
1 unit Network printer
11 pieces Flash disk / Memory stick
10 units Electronic tester VOM
5 units LAN Cable tester
QUANTITY MATERIALS
400 pcs. RJ 45
25 pcs. Modular box (RJ45)
20 pcs. Raceway or Slotted PVC 1.5” x 1.5” x 48”
1 box UTP cable
1 can Contact cleaner
1 piece Whiteboard
1 lot Fastener
1 spool Filler (lead-free)
8 pcs Fiber optic cable 2 meters (terminated)
laboratory
6x8 48 48
and/or lecture
area
storage area 2x2 4 4
learning
4x5 20 20
resource
center
equipment
20 20
circulation
area
Total Workshop Area: 92
A. Modules of Instruction
Assessment Assessment
Contents Conditions Methodologies
Criteria Methods
Plan and Anti-static Lecture/Disc Hands-on
Unit prepare unit wrist strap ussion Direct
assembly is assembly Set of screw Self-paced observation
planned Identify and driver instruction Demonstration
and obtain the Cutter Group
prepared to materials, Allen Discussion
ensure tools and wrench (.05-
OH&S equipment in .25 inch)
policies and accordance Flashlight
procedures with job Sharp
are followed requirements pointed
in Follow the tweezers
accordance O&H policies Cable tie
with and Manual
systems procedure to Personal
requiremen ensure protective
ts operation equipment
Materials safety (PPE)
necessary requirements
to complete Assemble
the work computer
are hardware in
identified accordance
and with job and
obtained in system
accordance requirements
with Configuratio
established n of BIOS in
procedures accordance
and with
checked hardware
against requirements
systems
requiremen
ts
Tools,
equipment
and testing
devices
needed to
carry out
the
installation
work are
obtained in
accordance
with
established
procedures
and
checked for
correct
operation
and safety
Computer
hardware is
assembled
in
accordance
with
established
procedures
and
systems
requiremen
ts
Basic-
input-
output-
system
(BIOS)
configuratio
n is
performed
in
accordance
with
hardware
requiremen
ts
LO2 PREPARE INSTALLER
Assessment
Assessment
Criteria Contents Conditions Methodologies
Methods
Assessment
Methodologi Assessment
Criteria Contents Conditions
es Methods
Assessment
Methodologi Assessment
Criteria Contents Conditions
es Methods
Assessment
Methodologi Assessment
Criteria Contents Conditions
es Methods