COSTO DIRECTO (S/.) S/. 94,269,209.51 16,611,170.68 17.62% 1,365,754.20 1.45% 17,976,924.88 19.07% 76,292,284.63 80.93%
GASTOS GENERALES S/. 7,030,255.19 S/. 1,238,800.77 17.62% S/. 101,852.99 1.45% S/. 1,340,653.76 19.07% S/5,689,601.43 80.93%
GASTOS DE SUPERVISION S/. 6,489,624.19 S/. 1,143,536.22 17.62% S/. 94,020.43 1.45% S/. 1,237,556.65 19.07% S/5,252,067.54 80.93%
GASTOS DE GESTION DE PROYECTOS S/. 645,575.55 S/. 113,756.82 17.62% S/. 9,352.97 1.45% S/. 123,109.79 19.07% S/522,465.76 80.93%
GASTOS DE SEGUIMIENTO Y MONITOREO S/. 608,219.64 S/. 107,174.34 17.62% S/. 8,811.77 1.45% S/. 115,986.11 19.07% S/492,233.53 80.93%
GASTOS DE LIQUIDACION DE OBRA S/. 130,661.35 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% S/130,661.35 100.00%
GASTOS DE EXPEDIENTE TECNICO S/. 684,663.08 S/. 120,644.43 17.62% S/. 9,919.27 1.45% S/. 130,563.70 19.07% S/554,099.38 80.93%
PRESUPUESTO TOTAL PARA LA CONSTRUCCION DEL MATERNO INFANT S/. 109,858,208.51 S/. 19,335,083.26 17.60% S/. 1,589,711.63 1.45% S/20,924,794.89 19.05% S/88,933,413.62 80.95%
OBRAS COMPLEMENTARIAS S/. 3,189,009.34 S/. 3,189,009.34 100.00% S/. 0.00 0.00% S/. 3,189,009.34 100.00% 0.00 0.00%
COSTO TOTAL DE INVERSION S/. 113,047,217.85 22,524,092.60 1,589,711.63 24,113,804.23 88,933,413.62
PORCENTAJE DE AVANCE 19.92% 1.41% 21.33% 78.67%
CUADRO DE RESUMEN DE AVANCE FISICO AL COSTO TOTAL CUADRO DE RESUMEN DE AVANCE FISICO AL COSTO DIRECTO
COSTO DEL EXPEDIENTE AL COSTO TOTAL (A) S/. 113,047,217.85 COSTO DEL EXPEDIENTE AL COSTO DIRECTO (CD) S/. 94,269,209.51
AVANCE AL COSTO TOTAL (C) S/. 24,113,804.23 AVANCE AL COSTO DIRECTO (C) S/. 17,976,924.88
% AVANCE FISICO ACTUAL ACUMULADO AL COSTO DIRECTO (C)/(A)*100
% AVANCE FISICO ACTUAL ACUMULADO AL COSTO TOTAL (C)/(A)*100 21.33% 19.07%
METAS FISICAS PROGR
INFORME MENSUAL DE OBRA
ITEM PARTIDAS
07.06.01 DETECCION_x000D_
07.10.01 FIREWALL
07.11 Instalación y puesta en marcha_x000D_
07.30.01 GESTION
METAS FISICAS PROGR
INFORME MENSUAL DE OBRA
ITEM PARTIDAS
07.31 ARMARIO RACK_x000D_
07.33.01 Equipamiento HF
07.33.01.01 EQUIPAMIENTO HF
07.34 Equipamiento VHF_x000D_
07.37.01 SOFTWARE_x000D_
- -
glb 1.00 0.84 0.84 0.16
glb 1.00 1.00 1.00 -
- -
glb 1.00 1.00 1.00 -
BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO
02.04.04.02 MONTAJE
02.04.04.02.01 MONTAJE DE TIGERALES TIPO 1 und
586.27 - - - - - - -
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
MAYORES METRADOS PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: ESTRUCTURAS EJECUTADO
RESPONSABLE: ING. ROGELIO ALBERTO AROHUANCA SOSA S/ -
Especialista Estructuras
Lunes, 05 de Agosto de 2019 Martes, 06 de Agosto de 2019 Miércoles, 07 de Agosto de 2019 Jueves, 08 de Agosto de 2019 Viernes, 09 de Agosto de 2019 Sábado, 10 de Agosto de 2019
BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
PARTIDAS NUEVAS PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: ESTRUCTURAS EJECUTADO
RESPONSABLE: ING. ROGELIO ALBERTO AROHUANCA SOSA S/ -
Especialista Estructuras Lunes, 05 de Agosto de 2019 Martes, 06 de Agosto de 2019 Miércoles, 07 de Agosto de 2019 Jueves, 08 de Agosto de 2019 Viernes, 09 de Agosto de 2019 Sábado, 10 de Agosto de 2019
SEMANA 21
VERIFICAR
AGO - (19
Planificado Planificado Planificado Planificado Planificado Planificado
-24)
BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO
-
- - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - - -
- - - - - - -
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
PRESUPUESTO BASE PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: ARQUITECTURA EJECUTADO
RESPONSABLE: ARQ. DARWIN RAUL CHAHUARA ÑAUPA S/ -
Especialista Arquitectura Lunes, 19 de Agosto de 2019 Martes, 20 de Agosto de 2019 Miércoles, 21 de Agosto de 2019 Jueves, 22 de Agosto de 2019 Viernes, 23 de Agosto de 2019 Sábado, 24 de Agosto de 2019
AGO - (19-24)
SEMANA 21
Planificado Planificado Planificado Planificado Planificado Planificado
VERIFICAR
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado BLOQUE/ EJE/ Metrado Valorizado BLOQUE/ EJE/ Metrado Valorizado BLOQUE/ EJE/ Metrado Valorizado BLOQUE/ EJE/ Metrado Valorizado BLOQUE/ EJE/ Metrado Valorizado BLOQUE/ EJE/
PISO PISO PISO PISO PISO PISO
03.16.14.02 CERRADURAS_x000D_
03.16.14.02.01 CERRADURA TIPO A, EXTERIOR - US-68/NPS pza
119.22 - - - - - - 0.00
03.16.16 PINTURA_x000D_
03.16.16.01 PINTURA DE CIELO RASOS, VIGAS, COLUMNAS Y
03.16.16.01.01 MUROS_x000D_
RESANE E IMPRIMANTE EN CIELO RASO_x000D_ m2
9.14 - - - - - - 0.00
03.16.16.01.02 PINTURA SATINADO 2 MANOS EN FALSO CIELO RASO m2
7.17 - - - - - - 0.00
03.16.18.02 TAPAJUNTAS_x000D_
03.16.18.02.01 TAPAJUNTA METALICA EN MUROS m
106.16 - - - - - - 0.00
03.16.18.03 PERGOLAS_x000D_
03.16.18.03.01 PERGOLA INGRESO PRINCIPAL. und
5078.17 - - - - - - 0.00
03.16.18.04 MARQUESINAS_x000D_
03.16.18.04.01 MARQUESINA EN NUTRICION und
19368.04 - - - - - - 0.00
03.16.18.05 FAROLA_x000D_
03.16.18.05.01 FAROLA N° 1 und
20430.74 - - - - - - 0.00
03.16.18.06 SEÑALIZACION_x000D_
03.16.18.06.01 SEÑALETICA EXTERIOR_x000D_
03.16.18.06.07 PINTURA_x000D_
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
MAYORES METRADOS PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: ARQUITECTURA EJECUTADO
RESPONSABLE: ARQ. DARWIN RAUL CHAHUARA ÑAUPA S/ -
Especialista Arquitectura Lunes, 19 de Agosto de 2019 Martes, 20 de Agosto de 2019 Miércoles, 21 de Agosto de 2019 Jueves, 22 de Agosto de 2019 Viernes, 23 de Agosto de 2019 Sábado, 24 de Agosto de 2019
AGO - (19-24)
SEMANA 21
VERIFICAR
Planificado Planificado Planificado Planificado Planificado Planificado
BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
MAYORES METRADOS PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: ARQUITECTURA EJECUTADO
RESPONSABLE: ARQ. DARWIN RAUL CHAHUARA ÑAUPA S/ -
Especialista Arquitectura Lunes, 19 de Agosto de 2019 Martes, 20 de Agosto de 2019 Miércoles, 21 de Agosto de 2019 Jueves, 22 de Agosto de 2019 Viernes, 23 de Agosto de 2019 Sábado, 24 de Agosto de 2019
SEMANA 21
AGO - (19-
VERIFICAR
Planificado Planificado Planificado Planificado Planificado Planificado
24)
BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO
3.02 PINTURA_x000D_
M2
03.02.02 PINTURA SATINADO EN CIELO RASO - - - - - - 0.00
03.02.02.01 SELLADOR EN CIELO RASO M2 4.33 - - - - - -
3.01 VEREDAS_x000D_ - - - - - -
03.01.01 PEDRAPLEN E= 0.30M FACTOR COMPACTACION = 1.25 M2 31.65 - - - - - -
03.01.01 PEDRAPLEN E= 0.30M FACTOR COMPACTACION = 1.25 M2 31.25 - - - - -
03.01.03 ENCOFRADO Y DESENCOFRADO EN VEREDAS M2 61.58 - - - - -
03.01.04 ACERO CORRUGADO FY= 4200 KG/ CM2 GRADO 60 KG 5.11 - - - - -
03.01.06 BRUÑAS EN VEREDAS M2 4.52 - - - - -
03.01.05 JUNTAS EN VEREDAS 15.94 - - - - - -
ML
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
PRESUPUESTO BASE PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: INSTALACIONES SANITARIAS EJECUTADO
RESPONSABLE: ING. VALENTIN TIMOTEO ENRIQUEZ PACHECO S/ -
Especialista Inst. Sanitarias Lunes, 19 de Agosto de 2019 Martes, 20 de Agosto de 2019 Miércoles, 21 de Agosto de 2019 Jueves, 22 de Agosto de 2019 Viernes, 23 de Agosto de 2019 Sábado, 24 de Agosto de 2019
AGO - (19-24)
SEMANA 21
VERIFICAR
Planificado Planificado Planificado Planificado Planificado Planificado
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
MAYORES METRADOS PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: INSTALACIONES SANITARIAS EJECUTADO
RESPONSABLE: ING. VALENTIN TIMOTEO ENRIQUEZ PACHECO S/ -
Especialista Inst. Sanitarias Lunes, 05 de Agosto de 2019 Martes, 06 de Agosto de 2019 Miércoles, 07 de Agosto de 2019 Jueves, 08 de Agosto de 2019 Viernes, 09 de Agosto de 2019 Sábado, 10 de Agosto de 2019
AGO - (19-24)
SEMANA 21
VERIFICAR
Planificado Planificado Planificado Planificado Planificado Planificado
AGO - (19-24)
SEMANA 21
VERIFICAR
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
PARTIDAS NUEVAS PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: INSTALACIONES SANITARIAS EJECUTADO
RESPONSABLE: ING. VALENTIN TIMOTEO ENRIQUEZ PACHECO S/ -
Especialista Inst. Sanitarias Lunes, 05 de Agosto de 2019 Martes, 06 de Agosto de 2019 Miércoles, 07 de Agosto de 2019 Jueves, 08 de Agosto de 2019 Viernes, 09 de Agosto de 2019 Sábado, 10 de Agosto de 2019
AGO - (19-24)
SEMANA 21
Planificado Planificado Planificado Planificado Planificado Planificado
VERIFICAR
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO
- - - - - - 0.00
- - - - - - 0.00
- - - - - - 0.00
- - - - - - 0.00
- - - - - - 0.00
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
PRESUPUESTO BASE PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: INSTALACIONES ELECTRICAS EJECUTADO
RESPONSABLE: ING. LIBORIO ANTONIO COYLA COLQUEHUANCA S/ -
Asistente Inst. Eléctricas
Lunes, 19 de Agosto de 2019 Martes, 20 de Agosto de 2019 Miércoles, 21 de Agosto de 2019 Jueves, 22 de Agosto de 2019 Viernes, 23 de Agosto de 2019 Sábado, 24 de Agosto de 2019
AGO - (19-24)
SEMANA 21
VERIFICAR
Planificado Planificado Planificado Planificado Planificado Planificado
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
MAYORES METRADOS PROGRAMADO
PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) S/ -
ESPECIALIDAD: INSTALACIONES ELECTRICAS EJECUTADO
RESPONSABLE: ING. LIBORIO ANTONIO COYLA COLQUEHUANCA S/ -
Asistente Inst. Eléctricas
Lunes, 19 de Agosto de 2019 Martes, 20 de Agosto de 2019 Miércoles, 21 de Agosto de 2019 Jueves, 22 de Agosto de 2019 Viernes, 23 de Agosto de 2019 Sábado, 24 de Agosto de 2019
AGO - (19-24)
SEMANA 21
VERIFICAR
Planificado Planificado Planificado Planificado Planificado Planificado
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO
- - - - - - 0.00
- - - - - - 0.00
- - - - - - 0.00
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
PARTIDAS NUEVAS PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: INSTALACIONES ELECTRICAS PROGRAMADO
RESPONSABLE: ING. LIBORIO ANTONIO COYLA COLQUEHUANCA S/ -
Asistente Inst. Eléctricas Lunes, 19 de Agosto de 2019 Martes, 20 de Agosto de 2019 Miércoles, 21 de Agosto de 2019 Jueves, 22 de Agosto de 2019 Viernes, 23 de Agosto de 2019 Sábado, 24 de Agosto de 2019
SEMANA 21
AGO - (19-
VERIFICAR
Planificado Planificado Planificado Planificado Planificado Planificado
24)
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO Metrado Valorizado BLOQUE/ EJE/ PISO
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
PRESUPUESTO BASE
PARCIAL / DIA
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
PARTIDAS NUEVAS
PARCIAL / DIA
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
PRESUPUESTO BASE PROGRAMADO SEMANA 3 DEL MES DE AGOSTO 2019 - (19 DE AGOSTO AL 24 DE AGOSTO) PROGRAMADO
S/ -
ESPECIALIDAD: INSTALACION DE COMUNICACIONES EJECUTADO
RESPONSABLE: ING. JIMMY QUISPE HUARAHUARA S/ -
Especialista Inst. de Comunicaciones
Lunes, 19 de Agosto de 2019 Martes, 20 de Agosto de 2019 Miércoles, 21 de Agosto de 2019 Jueves, 22 de Agosto de 2019 Viernes, 23 de Agosto de 2019 Sábado, 24 de Agosto de 2019
AGO - (19-24)
SEMANA 21
VERIFICAR
Planificado Planificado Planificado Planificado Planificado Planificado
BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/ BLOQUE/ EJE/
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO Metrado Valorizado PISO
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
AGO - (19-24)
SEMANA 21
VERIFICAR
Planificado Planificado Planificado Planificado Planificado Planificado
AGO - (19-24)
SEMANA 21
VERIFICAR
ITEM PARTIDA Und PRECIO UNITARIO Metrado Valorizado BLOQUE/ EJE/ Metrado Valorizado BLOQUE/ EJE/ Metrado Valorizado BLOQUE/ EJE/ Metrado Valorizado BLOQUE/ EJE/ Metrado Valorizado BLOQUE/ EJE/ Metrado Valorizado BLOQUE/ EJE/
PISO PISO PISO PISO PISO PISO
07.05 INFRAESTRUCTURA_x000D_
07.05.01 BANDEJAS PORTACABLES, TUBERIA Y ATERRAMIENTO
07.05.01.22 TUBERIA PVC-SAP 20MM m 14.62 - - - - - - 0.00
07.58 VARIOS - - - - - -
07.58.02 RELLENO DE ZANJAS TIPO I CON PROTECCION m 221.61 - - - - - -
PARCIAL / DIA - - - - - -
PLANIFICADO EJECUTADO
TOTAL / SEMANA -
PARTIDAS NUEVAS
16 de sept 2019 17 de sept 2019 18 de sept 2019 19 de sept 2019 20 de sept 2019 21 de s
Planificado Planificado Planificado Planificado Planificado Plani
BLOQUE/ EJE/
Valorizado PISO