OTAKIKPO FIELD

4” x 3KM ONSHO TERMINAL PRODUCE WATER PIPELINE PROJECT

FEED DESIGN PACKAGE

01 01/09/2019 Issued for RFQ A. Johnson A. Adekunle A. Bunu


Revision Date Reason for Issue By Checked Approved

© Design Rights Green Energy Int’l Ltd. This document and the
DOCUMENT REFERENCE
information it contains is confidential and the property of GEIL and is not to
be reproduced, communicated to a third party or used in any manner
Document Number Revision
whatsoever without the prior written consent of the GEIL.

OTKP-PPL-PJM-RFQ-06000 01

Schlumberger-Private
4” x 3KM ONSHORE TERMINAL PRODUCE WATER PIPELINE
PROJECT

FEED DESIGN PACKAGE

Table of Contents
LIST OF ABBREVATIONS .............................................................................................................................. 3

1 INTRODUCTION .................................................................................................................................... 4

2 APPENDICES ....................................................................................................................................... 5

2.1 APPENDIX 1 – LIST OF FEED DOCUMENTS ...............................................................................................5

Exhibit E – FEED Design Package Page 2 of 6


4” x 3KM ONSHORE TERMINAL PRODUCE WATER PIPELINE
PROJECT

FEED DESIGN PACKAGE

LIST OF ABBREVATIONS

TF Tank Farm
BPD Barrels Per Day
SDV Shut Down Valve
API American Petroleum Institute
BOD Basis of Design
ST Storage Tank
CCR Central Control Room
TER Telecommunication Equipment Room
HV High Voltage
LV Low Voltage
HVAC Heating Ventilation Air Conditioning system
ESD Emergency Shut Down
CCTV Closed Circuit Television
PAGA Public Address and General Alarm

Exhibit E – FEED Design Package Page 3 of 6


4” x 3KM ONSHORE TERMINAL PRODUCE WATER PIPELINE
PROJECT

FEED DESIGN PACKAGE

1 INTRODUCTION

The purpose of this Exhibits E - PROJECT Description and DESIGN DOSSIER is to identify the minimum
documents applicable for the performance of the WORK. International Standards and Nigerian Laws & DPR
requirements are not listed herein: but must however be used whenever and wherever applicable.

EXHIBIT E - PROJECT Description and DESIGN DOSSIER should be read in conjunction with other elements
of the CONTRACT DOCUMENTS, with particular attention to the EXHIBIT A – Scope of WORK and Services
to COMPANY.

Exhibit E – FEED Design Package Page 4 of 6


4” x 3KM ONSHORE TERMINAL PRODUCE WATER PIPELINE
PROJECT

FEED DESIGN PACKAGE

2 APPENDICES
2.1 APPENDIX 1 – LIST OF FEED DOCUMENTS
Latest
EWR Syst./Unit Latest
S/N Reference number TITLE Issue Latest status
Nbr. rev.
date

01 -> PROJECT MANAGEMENT

1 GEIL-OTAK4-PJM-REG-01001 Master Document Register FEED Issued for Approval


2 GEIL-OTAK4-PJM-BOD-01002 Pipeline Basis of Design FEED Issued for Approval

ENGINEERING PHASE

02 -> PROCESS

1 GEIL-OTAK4-PRO-PFD-02001 Pipeline Process Flow Diagram FEED Issued for Approval

2 GEIL-OTAK4-PRO-RPT-02002 Pipeline HYSYS Model FEED Issued for Approval

3 GEIL-OTAK4-PRO-LST-02003 Legend Sheets FEED Issued for Approval

4 GEIL-OTAK4-PRO-RPT-02004 Heat and Material Balance FEED Issued for Approval

5 GEIL-OTAK4-PRO-PID-02005-01 Pig Launcher Manifold P&ID FEED Issued for Approval

6 GEIL-OTAK4-PRO-PID-02005-02 Pig Receiver Manifold P&ID FEED Issued for Approval

7 GEIL-OTAK4-PRO-LST-02006 Equipment List FEED Issued for Approval

03 -> PIPELINE

1 GEIL-OTAK4-PPL-RPT-03001 Pipeline Stability Analysis Report FEED Issued for Approval


2 GEIL-OTAK4-PPL-RPT-03002 Wall Thickness Calculation Report FEED Issued for Approval
Pipeline Upheaval Buckling
3 GEIL-OTAK4-PPL-DWG-03004 FEED Issued for Approval
Analysis
4 GEIL-OTAK4-PPL-RPT-03005 Hydraulics Calculation Report FEED Issued for Approval
5 GEIL-OTAK4-PPL-DWG-03008 Typical R.O.W. Dimensions FEED Issued for Approval
6 GEIL-OTAK4-PPL-DWG-03010 Typical Warning Sign FEED Issued for Approval
7 GEIL-OTAK4-PPL-DWG-03011 Typical Pipeline Marker FEED Issued for Approval
8 GEIL-OTAK4-PPL-DWG-03013 Typical Minor River Crossing FEED Issued for Approval
9 GEIL-OTAK4-PPL-DWG-03014 Typical Major River Crossing FEED Issued for Approval
10 GEIL-OTAK4-PPL-DWG-03015 Typical Pipeline Crossing FEED Issued for Approval
11 GEIL-OTAK4-PPL-DWG-03016 Typical Trench Dimensions FEED Issued for Approval

Exhibit E – FEED Design Package Page 5 of 6


4” x 3KM ONSHORE TERMINAL PRODUCE WATER PIPELINE
PROJECT

FEED DESIGN PACKAGE

04 -> MECHANICAL

05 -> INSTRUMENTATION

06 -> ELECTRICAL

07 -> CIVIL/STRUCTURAL

08 -> PAINTING

09 -> PROCESS SAFETY

Exhibit E – FEED Design Package Page 6 of 6