Sunteți pe pagina 1din 4

PT.

PERKASA HEAVYNDO ENGINEERING


PLANT & PROCESS EQUIPMENT DIVISION
PERKASA
REPORT NO.: QC/F-6/11/2018

CATATAN PEMERIKSAAN UKURAN


DIMENSIONAL INSPECTION REPORT
Pemesan No. Komponen/Rakitan
PT. MITRA MAHAJAY MANDIRI 9B
Customer Part/Assy. No.
Proyek Nama Produk
Rolling RING
Project Name of Equipment
No. Pekerjaan No. Gambar
FK. 18.078
Work Order No. Drawing No.
Alat yang digunakan / Used Measuring Equipment Jenis Pemeriksaan / Kind of Inspection
Measuring Tape, Stell Ruller, Wire & Tapper Gauge Dimensional Inspection ROLLING Only

Satuan / Unit : mm
1 2 3 4 5 B
C

A B

C
ACTUAL DIMENSION
SL.No. REMARKS
A = 4417 B = 2500 ( R ) C = 5341 (Cr)

9B-1 4418 2500 5342

9B-2 4419 2500 5342

9B-3 4417 2500 5343

NOTE :

CHECKED BY TAMPLATE PT Hitachi Contruction Machinery Indonesia

3
Result : ACC REPAIR REJECT

CUSTOMER PT. PERKASA HEAVYNDO ENGINEERING


Disetujui dan disaksikan oleh Disetujui oleh Dicek Oleh Disiapkan Oleh
Approved and witnessed by Approved by Checked by Prepared by
Bambang S.
(date) Surveyor (date) HOD QA / QC (date) Insp. Spv. ( Date ) Inspector
PT. PERKASA HEAVYNDO ENGINEERING
PLANT & PROCESS EQUIPMENT DIVISION
PERKASA
REPORT NO.: QC/F-7/11/2018

CATATAN PEMERIKSAAN UKURAN


DIMENSIONAL INSPECTION REPORT
Pemesan No. Komponen/Rakitan
PT. MITRA MAHAJAY MANDIRI 9A 1-2
Customer Part/Assy. No.
Proyek Nama Produk
Rolling RING
Project Name of Equipment
No. Pekerjaan No. Gambar
FK. 18.078
Work Order No. Drawing No.
Alat yang digunakan / Used Measuring Equipment Jenis Pemeriksaan / Kind of Inspection
Measuring Tape, Stell Ruller, Wire & Tapper Gauge Dimensional Inspection ROLLING Only

Satuan / Unit : mm
1 2 3 4 5 B

C
A
B

DD

C
ACTUAL DIMENSION
SL.No. REMARKS
A = 2550 B = 3100 D = R 2500 / R 3100 C = 550

9A-1 2550 3100 R. 2500 ; 3100 550

9A-2 2550 3100 R. 2500 ; 3100 550

NOTE :

CHECKED BY TAMPLATE PT Hitachi Contruction Machinery Indonesia

3
Result : ACC REPAIR REJECT

CUSTOMER PT. PERKASA HEAVYNDO ENGINEERING


Disetujui dan disaksikan oleh Disetujui oleh Dicek Oleh Disiapkan Oleh
Approved and witnessed by Approved by Checked by Prepared by
Bambang S.
(date) Surveyor (date) HOD QA / QC (date) Insp. Spv. ( Date ) Inspector

S-ar putea să vă placă și