Documente Academic
Documente Profesional
Documente Cultură
OPERATIONAL
PERFORMANCE TEST
CONTENTS
Group 1 Introduction Dig Function Drift Check.........................T4-3-12
Operational Performance Tests ................T4-1-1 Control Lever Operating Force ...............T4-3-14
Preparation for Performance Tests ...........T4-1-2 Control Lever Stroke ..............................T4-3-15
Combined Boom Raise/Swing
Group 2 Engine Test
Function Check.....................................T4-3-16
Engine Speed...........................................T4-2-1
Engine Compression Pressure .................T4-2-3 Group 4 Component Test
Valve Clearance Adjustment.....................T4-2-4 Primary Pilot Pressure ..............................T4-4-1
Nozzle Check ...........................................T4-2-6 Secondary Pilot Pressure .........................T4-4-3
Injection Timing ......................................T4-2-10 Solenoid Valve Set Pressure ....................T4-4-4
Main Pump Deliuery Pressure ..................T4-4-6
Group 3 Excavator Test
Main Relief Valve Set Pressure.................T4-4-8
Travel Speed ............................................T4-3-1
Overload Relief Valve Set Pressure ........T4-4-12
Track Revolution Speed ...........................T4-3-2
Main Pump Flow Rate Measurement ......T4-4-14
Mistrack Check ........................................T4-3-3
Swing Motor Drainage ............................T4-4-20
Travel Parking Function Check .................T4-3-4
Travel Motor Drainage ............................T4-4-22
Swing Speed ............................................T4-3-5
Swing Function Drift Check ......................T4-3-6 Group 5 Standard
Swing Motor Leakage ...............................T4-3-7 Operational Performance
Maximum Swingable Slant Angle..............T4-3-8 Standard Table .......................................T4-5-1
Swing Bearing Play ..................................T4-3-9 Main Pump P-Q Curve..............................T4-5-4
Hydraulic Cylinder Cycle Time ................T4-3-10 Dr.EX Monitor Indicating Values................T4-5-6
1HHT-4-1
(Blank)
1HHT-4-2
OPERATIONAL PERFORMANCE TEST / Introduction
OPERATIONAL PERFORMANCE TESTS
1. To comprehensively evaluate each operational 1. To evaluate not only that the test data are correct,
function by comparing the performance test data but also in what range the test data are.
with the standard values.
2. Be sure to evaluate the test data based on the
2. According to the evaluation results, repair, adjust, machine operation hours, kinds and state of work
or replace parts or components as necessary to loads, and machine maintenance conditions.
restore the machine's performance to the desired
standard. The machine performance does not always
deteriorate as the working hours increase. However,
3. To economically operate the machine under the machine performance is normally considered to
optimal conditions. reduce in proportion to the increase of the operation
hours.
Kinds of Tests Accordingly, restoring the machine performance by
repair, adjustment, or replacement shall consider the
1. Base machine performance test is to check the number of the machine's working hours.
operational performance of each system such as
engine, travel, swing, and hydraulic cylinders. Definition of “Performance Standards”
2. Hydraulic component unit test is to check the 1. Operation speed values and dimensions of the
operational performance of each component such new machine.
as hydraulic pump, motor, and various kinds of
valves. 2. Operational performance of new components
adjusted to specification. Allowable errors will be
Performance Standards indicated as necessary.
T4-1-1
OPERATIONAL PERFORMANCE TEST / Introduction
PREPARATION FOR PERFORMANCE
TESTS
1. THE MACHINE
Repair any defects and damage found, such as oil
or water leaks, loose bolts, cracks and so on,
before starting to test.
2. TEST AREA
(1) Select a hard, flat surface.
(2) Secure enough space to allow the machine
to run straight more than 20 m (65 ft 7 inch),
and to make a full swing with the front
attachment extended.
(3) If required, rope off the test area and provide
signboards to keep unauthorized personnel
away.
3. PRECAUTIONS
(1) Before starting to test, agree upon the
signals to be employed for communication
among coworkers. Once the test is started,
be sure to communicate with each other T105-06-01-003
using these signals, and to follow them
without fail.
(2) Operate the machine carefully and always
give first priority to safety.
(3) While testing, always take care to avoid
accidents due to landslides or contact with
high-voltage power lines. Always confirm
that there is sufficient space for full swings.
(4) Avoid polluting the machine and the ground
with leaking oil. Use oil pans to catch
escaping oil. Pay special attention to this
when removing hydraulic pipings.
T4-1-2
OPERATIONAL PERFORMANCE TEST / Engine Test
ENGINE SPEED
Summary:
1. Measure the engine speed using the built-in diag- 1
nosing system (refer to TROUBLESHOOT-
ING/General group.) or Dr. EX. If the built-in diag- 2
nosing system or Dr. EX is not available, use an
engine speed meter.
Preparation:
1. Select the monitor function of the built-in diagnos-
ing system (or Dr.EX). When using an engine
speed meter, install speed pickup (1) to injection
pipe (2).
T4-2-1
OPERATIONAL PERFORMANCE TEST / Engine Test
Measurement: Evaluation:
1. Check engine speeds for auto-warm up (when Refer to T4-5 Operational Performance Standard.
starting the engine), auto-idle, slow idle, fast idle
(when normal), fast idle (when the ECO is deacti- Remedy:
vated), fast idle (in the E mode), and fast idle (in Refer to T5-4 Troubleshooting B.
the HP mode).
2. Select the switch positions and the test conditions
corresponding to the engine speed to be meas- NOTE: ECO stands for the auto engine speed re-
-1
ured as shown in the table below. duction system by 100 min .
Engine Power Ӹ Auto-Idle/ Auto- Work
Control Ӹ Mode Ӹ Acceleration Mode Test Conditions
Dial Switch Selector Switch
Digging
Slow Idle Min. Speed P OFF
Mode
Fast Idle Digging
Max. Speed P OFF
(Normal) Mode
Fast Idle Check in the Dr. EX special
Digging
(With ECO deac- Max. Speed P OFF functions with ECO deacti-
Mode
tivated) vated.
Fast Idle (Relief Digging Check the engine speed while
Max. Speed P OFF
operation) Mode relieving the boom raise circuit.
Fast Idle Digging
Max. Speed E Mode OFF
(E mode) Mode
Fast Idle Digging Check the engine speed while
Max. Speed HP Mode OFF
(HP mode) Mode relieving the boom raise circuit.
Check engine speed 4 seconds
Digging
Auto-Idle Max. Speed P Auto-Idle after returning all control levers
Mode
to neutral.
Check reduced engine speed
Auto- Digging
Max. Speed P Auto-Acceleration within 3 seconds after returning
Acceleration Mode
all control levers to neutral.
Digging Check only when oil tempera-
Warming Up Max. Speed P OFF
Mode ture is lower than 0 °C (32 °F).
Monitor Panel Switch Panel
Engine Con-
trol Dial
Auto-Idle/
Acceleration Selector
Power Mode
Switch
Work Mode
Switch
T178-01-01-003 T178-01-01-004
T4-2-2
OPERATIONAL PERFORMANCE TEST / Engine Test
ENGINE COMPRESSION PRESSURE
Summary:
1. Measure compression pressure in the cylinders to
check for a decline in engine power.
Preparation:
1. Confirm that valve clearances are correct.
Measurement:
1. Turn the starter to crank the engine. Record the
compression pressure of each cylinder.
Evaluation:
Refer to Group-5 in this section.
RemedyȚ Ț
Refer to engine shop manual.
T4-2-3
OPERATIONAL PERFORMANCE TEST / Engine Test
VALVE CLEARANCE ADJUSTMENT
Summary:
Perform the measurement when the engine is cool.
Pointer
Before starting work, clean the head cover mounting
area to avoid contaminating the engine.
Preparation:
1. Locate top dead center (TDC) in the compression
stroke.
While turning the crank shaft clockwise, align the
matching mark on the crank pulley with the pointer
located on the flywheel housing as illustrated.
When the S mark on the driving side flange of the
injection pump coupling aligns with the pointer,
piston No.1 (or piston No.6) is positioned at TDC
in the compression stroke.
Measurement:
1. Insert a feeler gauge into the clearance between
the rocker arm and the valve stem end to meas-
ure the valve clearance.
T173-04-02-007
NOTE: Cylinder Nos. are designated from No.1 to
No.6 as viewed from the fan side.
T4-2-4
OPERATIONAL PERFORMANCE TEST / Engine Test
2. When the measurement is started from cylinder
No.1, perform the same measurement to all
valves indicated with the mark “{” in the table be-
low. (When the measurement is started from cyl-
inder No.6, perform the measurement on the
valves shown with the mark “×”.)
T4-2-5
OPERATIONAL PERFORMANCE TEST / Engine Test
NOZZLE CHECK
Summary:
1. Check the injection pressures and the spray pat-
terns at the first and second stages with a nozzle
tester.
Nozzle Nozzle
Holder
2. Before starting work, clean the nozzle holder
Retaining
mounting area to avoid contaminating the engine Nut
system.
Preparation:
1. Injection Pressure at First Stage:
1-1. Remove the nozzle holder, the fuel injection Injection Pressures T1HH-04-02-007
at First and Second
pipings and so on. Stages:
Retaining
1-2. Remove the retaining nut from the nozzle Nut (Tool) Nozzle
holder. Install the gasket (tool) and retaining
nut (tool) on the nozzle.
Gasket
Gasket (Tool) :157892-1500 (Bosch Automo- (Tool)
tive)
Retaining Nut (Tool) :157892-4000 (Bosch
Automotive)
Nozzle Holder
T1HH-04-02-010
T4-2-6
OPERATIONAL PERFORMANCE TEST / Engine Test
2-4. Install the nut (tool) to the holder (tool).
Nut (Tool): 157892-1000 (Bosch Automotive) Nut (Tool)
Holder (Tool)
2-5. Install the pin (tool) to the dial gauge (tool).
Dial Gauge (Tool): 157892-3800 (Bosch
Automotive)
Pin (Tool) (Length: 60 mm): 157892-5300
(Bosch Automotive)
T1HH-04-02-012
Retaining Nozzle
Nut Tester
Plug
T1HH-04-02-013
T4-2-7
OPERATIONAL PERFORMANCE TEST / Engine Test
Measurement
CAUTION: Never allow skin to contact the Injection Pressure at First Stage:
spray directly. The fuel spray from the nozzle
may penetrate the skin,
resulting in serious injury. If the fuel pene-
trates into the blood stream, it may cause
blood toxication. Nozzle Tester
IMPORTANT: Be sure to use clean diesel oil for the
test.
2-3. Read needle valve stroke (M) from the dial Stroke of Needle Valve
gauge indication (once the needle valve has
descended). Refer to the set value as below. L
2
Set Value :18.1+1 MPa (185+10 kgf/cm ,
2630+142 psi)
T4-2-8
OPERATIONAL PERFORMANCE TEST / Engine Test
3. Spray Pattern
Attach the nozzle holder to the nozzle tester.
Make several strong strokes of the tester and
check the fuel spray pattern. Be sure not to oper-
ate the pressure gauge.
4. Leak Condition
Be sure to keep the pressure as that just before Normal
the injection. Then, check for any oil leakage
around the nozzle.
Evaluation
1. Standard Injection Pressure:
Refer to T4-5 Operational Performance Standard
Table.
T1HH-04-02-007
T4-2-9
OPERATIONAL PERFORMANCE TEST / Engine Test
INJECTION TIMING
Pointer
Inspection/Adjustment:
1. Position piston No.1 at TDC. Turn the crank shaft
clockwise to align the matching mark on the crank
pulley with the pointer on the housing.
T1HH-04-02-017
Coupling
Adjusting
Bolt
T1HH-04-02-018
T4-2-10
OPERATIONAL PERFORMANCE TEST / Excavator Test
TRAVEL SPEED
Summary:
Measure the time required for the excavator to travel
a 20 m (65.6 ft) test track.
Preparation:
1. Adjust the track sag on both side tracks equally.
2. Prepare a flat and solid test track 20 m (65.6 ft) in
length with extra length of 3 to 5 m (9.8 to 16 ft) on
Arm Rolled-In, Bucket Rolled-In
both ends for machine acceleration and decelera- End
tion. Bucket Height: 0.3 to 0.5 m
3. Hold the bucket 0.3 to 0.5 m (12 to 20 in) above
the ground with the arm and bucket rolled in. Start
20 m Deceleration
4. Maintain hydraulic oil temperature at 50±5 °C Zone
(122±9 °F). 3 to 5 m
Acceleration
Measurement: Zone
3 to 5 m
1. Measure both the slow and fast speeds of the
machine. T105-06-03-001
2. Select the following switch positions:
Travel Engine Power Work Auto-Idle/
Mode Control Mode Mode Acceleration
Switch Dial Switch Switch Selector
Slow Digging
Fast Idle P Mode OFF
Mode Mode
Fast Digging
Fast Idle P Mode OFF
Mode Mode
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
Remedy:
Refer to the Troubleshooting B in Group T5-4.
T4-3-1
OPERATIONAL PERFORMANCE TEST / Excavator Test
TRACK REVOLUTION SPEED
Summary: Evaluation:
Measure the track revolution cycle time with the track Refer to the Performance Standard Table in Group
raised off ground. T4-5.
T4-3-2
OPERATIONAL PERFORMANCE TEST / Excavator Test
MISTRACK CHECK
Summary:
1. Allow the machine to travel 20 m (65.6 ft). Meas-
ure the maximum tread deviation from the tread
chord line drawn between the travel start and end Maximum Distance
points to check the performance equilibrium be-
tween both sides of the travel device systems
(from the main pump to the travel motor). Acceleration
2. If measured on a concrete surface, the tread de- Zone:
viation has a trend to decrease. 3 to 5 m
20 m
Preparation:
1. Adjust the track sag of both tracks to be equal.
2. Provide a flat, solid test yard 20 m (65.6 ft) in
length, with extra length of 3 to 5 m (9.8 to 16 ft)
on both ends for machine acceleration and decel- T105-06-03-022
eration.
3. Hold the bucket 0.3 to 0.5 m (12 to 20 in) above
the ground with the arm and bucket rolled in.
4. Maintain the hydraulic oil temperature at 50±5 °C
(122±9 °F).
Measurement:
1. Measure the amount of mistracking in both fast,
and slow travel speeds.
2. Select the following switch positions:
Travel Engine Power Work Auto-Idle/
Mode Control Mode Mode Acceleration
Switch Dial Switch Switch Selector
Slow Digging
Fast Idle P Mode OFF
Mode Mode
Fast Digging
Fast Idle P Mode OFF
Mode Mode
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
Remedy:
Refer to the Troubleshooting B in Group T5-4.
T4-3-3
OPERATIONAL PERFORMANCE TEST / Excavator Test
TRAVEL PARKING FUNCTION CHECK
Summary:
To measure the parking brake function on a specified
slope.
Preparation:
1. The surface of the test slope shall be even with a
gradient of 20 % (11.31°).
0.2 to 0.3 m
2. Hold the bucket 0.2 to 0.3 m (8 to 12 in) above the
ground with the arm and bucket fully rolled in.
3. Maintain the hydraulic oil temperature at 50±5 °C
(122±9 °F).
Measurement: T105-06-03-004
1. Measure the travel parking brake slip amount
while parked.
1-1. Climb the slope and place the travel levers in
neutral.
1-2. Stop the engine.
1-3. After the machine stops, put matching marks
on a track link or shoe, and the track side
frame.
1-4. After 5 minutes, measure the distance between
the marks on the track link or shoe and the
track side frame.
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
Matching marks on the track
side frame and shoe when the
machine comes to a stop.
Displacement measured
after 5 minutes.
T105-06-03-006
T4-3-4
OPERATIONAL PERFORMANCE TEST / Excavator Test
SWING SPEED
Summary:
Measure the time required to swing three complete
turns.
Preparation:
1. Check the lubrication of the swing gear and swing
bearing.
2. Place the machine on flat, solid ground with ample
space for swinging. Do not conduct this test on
slopes.
3. With the arm rolled out and bucket rolled in, hold The same height as the
the bucket so that the height of the bucket pin is boom foot pin height
the same as the boom foot pin. The bucket must
be empty. T105-06-03-013
Measurement:
1. Select the following switch positions:
Auto-Idle/
Engine Con- Power Mode Work Mode T178-04-03-001
Acceleration
trol Dial Switch Switch
Selector
Digging
Fast Idle P Mode OFF
Mode
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
Remedy:
Refer to the Troubleshooting B in Group T5-4.
T4-3-5
OPERATIONAL PERFORMANCE TEST / Excavator Test
SWING FUNCTION DRIFT CHECK
Summary:
Measure the swing drift on the bearing outer circum-
ference when stopping after a 180° full-speed swing.
Preparation:
1. Check the lubrication of the swing gear and swing
bearing.
2. Place the machine on flat, solid ground with ample
space for swinging. Do not conduct this test on a
slope. Two Check Marks
3. With the arm rolled out and bucket rolled in, hold
T105-06-03-008
the bucket so that the height of the bucket pin is
the same as the boom foot pin. The bucket must
be empty.
4. Make two chalk marks: one on the swing bearing
and one directly below it on the track frame.
5. Swing the upperstructure 180°.
6. Maintain the hydraulic oil temperature at 50±5 °C
(122±9 °F).
2. Operate the swing control lever fully and return it Marking on the Swing Bearing
to the neutral position when the mark on the up-
perstructure aligns with that on the track frame af- T105-06-03-010
ter swinging 180° .
3. Measure the distance between the two marks.
4. Align the marks again, swing 180°, then test in the
opposite direction.
5. Repeat steps 3. to 5. three times each and calcu-
late the average values.
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
Remedy:
Refer to the Troubleshooting B in Group T5-4.
T4-3-6
OPERATIONAL PERFORMANCE TEST / Excavator Test
SWING MOTOR LEAKAGE
Summary:
Check for upperstructure drift while suspending a
load on a slope.
Preparation:
1. Check the lubrication of the swing gear and swing
bearing.
2. Park the machine on a smooth slope with a gradi-
ent of 26.8 % (15°).
3. Load bucket fully. In lieu of loading the bucket,
weight (W) of the following specification can be
used.
W=1800 kg (3970 lb)
4. With the arm rolled out, and bucket rolled in, posi- T105-06-03-011
tion the arm top pin height to be level with the
boom foot pin.
5. Swing the upperstructure to position it 90° to the
slope. Make aligning marks on the swing bearing
periphery and track frame using tape, as illus-
trated.
6. Maintain the hydraulic oil temperature at 50±5 °C
(122±9 °F).
Measurement:
1. Select the following switch position:
Auto-Idle/ Measure Difference Between Marks
Power Mode Work Mode
Acceleration
Switch Switch
Selector
P Mode Digging Mode OFF
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
Remedy:
Refer to the Troubleshooting B in Group T5-4.
T4-3-7
OPERATIONAL PERFORMANCE TEST / Excavator Test
MAXIMUM SWINGABLE SLANT ANGLE
Summary:
With the upperstructure swung 90° to the slope,
check the maximum slant angle on which the upper-
structure can swing to the uphill side.
Preparation:
1. Check that the swing gear and bearing are well
lubricated.
2. Load bucket fully. In lieu of loading the bucket,
weight (W) of the following specification can be
used.
W=1800 kg (3970 lb)
3. With the arm cylinder fully retracted and the
bucket cylinder fully extended, hold the arm top
pin to the position flush with the boom foot pin T105-06-03-011
height.
4. Climb a slope and swing the upperstructure 90° to
the slope.
5. Maintain the hydraulic oil temperature at 50±5 °C
(122±9 °F).
Measurement:
1. Select the following switch positions:
Engine Auto-Idle/
Power Mode Work Mode
Control Acceleration
Switch Switch
Dial Selector
Fast Idle P Mode Digging Mode OFF
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
Remedy:
Refer to the Troubleshooting B in Group T5-4.
T4-3-8
OPERATIONAL PERFORMANCE TEST / Excavator Test
SWING BEARING PLAY
Summary:
Measure the swing bearing play using a dial gauge to
check the wear of bearing races and balls.
Preparation:
1. Check swing bearing mounting bolts for loose-
ness.
2. Check the lubrication of the swing bearing. Con-
firm that bearing rotation is smooth and without
noise.
3. Install a dial gauge on the track frame as shown, Magnetic Dial
using a magnetic base. Base Gauge
T105-06-03-014
4. Position the upperstructure so that the boom
aligns with the tracks facing towards the front
idlers.
5. Position the dial gauge so that its needle point
comes into contact with the bottom face of the
bearing outer race.
6. Bucket should be empty.
Measurement:
1. With the arm rolled out and bucket rolled in, hold
the bucket so that the height of the bucket pin is
the same as the boom foot pin. Record the dial
gauge reading (h1).
2. Lower the bucket to the ground and use it to raise
the front idler 0.5 m (20 in). Record the dial gauge
reading (h2).
3. Calculate bearing play (H) from this data (h1 and
h2) as follows:
H=h2-h1
T105-06-03-007
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
T4-3-9
OPERATIONAL PERFORMANCE TEST / Excavator Test
HYDRAULIC CYLINDER CYCLE TIME
Preparation:
1. Keep the condition on measuring as below.
1-1. To measure the cycle time of the boom cylin-
ders: With the arm rolled out and the empty
bucket rolled in, lower the bucket to the ground,
as shown. T105-06-03-018
Measurement:
1. Select the following switch positions:
Engine Auto-Idle/
Power Mode Work Mode
Control Acceleration
Switch Switch
Dial Selector
Fast Idle P Mode Digging Mode OFF
T4-3-10
OPERATIONAL PERFORMANCE TEST / Excavator Test
(Blank)
T4-3-11
OPERATIONAL PERFORMANCE TEST / Excavator Test
DIG FUNCTION DRIFT CHECK
Summary:
1. Measure dig function drift, which can be caused
by oil leakage in the control valve and boom, arm,
and bucket cylinders, with the loaded bucket.
4. With the arm rolled out and the bucket rolled in,
hold the bucket so that the height of the bucket
pin is the same as the boom foot pin.
Boom and Bucket Cylinder Retraction
5. Maintain the hydraulic oil temperature at 50±5 °C
(122±9 °F). Mark Mark
Measurement:
1. Stop the engine.
2. Five minutes after the engine has been stopped,
measure the change in the position of the bottom
of the bucket, as well as the boom, arm and
bucket cylinders.
3. Repeat step 2. three times and calculate the av- T110-06-03-002
erage values.
Arm Cylinder Extension
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
Remedy:
Mark
Refer to the Troubleshooting B in Group T5-4.
T110-06-03-001
T4-3-12
OPERATIONAL PERFORMANCE TEST / Excavator Test
• Arm Roll-In Position
Summary:
1. Measure dig function drift, which can be caused
by oil leakage in the control valve and boom, arm,
and bucket cylinders.
Preparation:
1. The bucket must be empty.
2. Position the arm cylinder with the rod 50 mm (2 in)
retracted from the fully extended position.
3. Position the bucket cylinder with the rod 50 mm (2
in) retracted from the fully extended position.
4. With the arm rolled in and the bucket rolled in.
Lower the boom until the arm tip is 1 m (40 in)
above the ground. 1m
5. Maintain the hydraulic oil temperature at 50±5 °C
(122±9 °F). T173-04-03-001
Measurement:
1. Stop the engine.
2. Five minutes after the engine has been stopped,
measure the change in the position of the bottom
of the arm tip, as well as the boom, arm and
bucket cylinders.
3. Repeat step 2. three times and calculate the av- Cylinder Retraction
erage values.
Mark Mark
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
Remedy:
Refer to the Troubleshooting B in Group T5-4.
T110-06-03-002
T4-3-13
OPERATIONAL PERFORMANCE TEST / Excavator Test
CONTROL LEVER OPERATING FORCE
Summary:
1. Use a spring scale to measure the maximum re-
sistance of each control lever as illustrated.
2. Measure the maximum operating force of the front
attachment control lever.
3. Measure the operating force at the grip center of
each control lever.
Preparation:
Maintain the hydraulic oil temperature at 50±5 °C
(122±9 °F).
Measurement:
T107-06-03-003
1. Measure each control lever.
2. Select the following switch positions:
Engine Auto-Idle/
Power Mode Work Mode
Control Acceleration
Switch Switch
Dial Selector
Fast Idle P Mode Digging Mode OFF
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
T4-3-14
OPERATIONAL PERFORMANCE TEST / Excavator Test
CONTROL LEVER STROKE
Summary:
1. Measure each lever stroke at the lever top using a
ruler.
2. Measure the lever stroke at the grip center of
each control lever.
3. In case lever stroke play is present in the neutral
position, add half (1/2) the play present to both
side lever strokes.
Preparation:
Maintain the hydraulic oil temperature at 50±5 °C
(122±9 °F).
Measurement:
1. Stop the engine.
2. Measure each lever stroke at the lever top from
neutral to the stroke end using a ruler.
3. Repeat step 2. Three times and calculate the av-
erage values.
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
T4-3-15
OPERATIONAL PERFORMANCE TEST / Excavator Test
COMBINED BOOM RAISE/SWING FUNC-
TION CHECK
Summary:
Check boom raise and swing movement and speeds
while operating both functions simultaneously.
Preparation:
1. Start the engine and run it at fast idle. Operate the
boom raise function and check to be sure that the
cylinder movement is smooth, with out sticking.
T107-06-03-009
2. With the arm fully rolled out and bucket fully rolled
in, lower the bucket to the ground. The bucket
must be empty.
3. Maintain the hydraulic oil temperature at 50±5 °C
(122±9 °F).
Measurement:
1. Select the following switch positions:
Engine Auto-Idle/ T107-06-03-010
Power Mode Work Mode
Control Acceleration
Switch Switch
Dial Selector
Fast Idle P Mode Digging Mode OFF
Evaluation: T107-06-03-011
Remedy:
Refer to the Troubleshooting B in Group T5-4.
T4-3-16
OPERATIONL PERFORMANCE TEST / Component Test
PRIMARY PILOT PRESSURE
Preparation:
1. Properly shut down the engine.
2. Press the air release valve on top of the hydraulic
oil tank to release any remaining pressure.
3. Remove the plug from the pilot pump delivery port.
Install adapter (ST 6069) and pressure gauge (ST
6942) on the port.
: 6 mm
(122±9 °F).
Measurement:
1. Select the following switch positions:
Auto-Idle/
Engine Con- Power Mode Work Mode
Acceleration
trol Dial Switch Switch
Selector
General
Fast Idle P Mode Purpose OFF
Mode
General
Slow Idle P Mode Purpose OFF
Mode
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
T4-4-1
OPERATIONL PERFORMANCE TEST / Component Test
Primary Pilot Pressure Adjustment
1
Adjustment:
Adjust the set pressure of relief valve (1) as neces-
sary.
: 22 mm
T1HH-04-04-002
2 3
1. Remove plug (3).
2. Install the estimated necessary number of shims
(2).
3. Tighten plug (3).
T4-4-2
OPERATIONL PERFORMANCE TEST / Component Test
SECONDARY PILOT PRESSURE
1
Preparation:
1. Properly shut down the engine.
2. Press the air release valve on top of the hydraulic
oil tank to release any remaining pressure.
3. Install pressure gauge (ST 6942) and tee (ST
6450) to the end of pilot line (1) at the respective
control valve spool end, as illustrated.
: 14 mm, 17 mm
Measurement:
1. Select the following switch positions:
T1HH-04-04-003
Auto-Idle/
Engine Con- Power Mode Work Mode
Acceleration
trol Dial Switch Switch
Selector
Digging
Fast Idle P Mode OFF
Mode
Digging
Slow Idle P Mode OFF
Mode
Evaluation:
Refer to Performance Standard Table in Group T4-5.
T157-05-04-011
Remedy:
Refer to Troubleshooting B in Group T5-4.
T4-4-3
OPERATIONL PERFORMANCE TEST / Component Test
SOLENOID VALVE SET PRESSURE
Preparation:
1. Properly shut down the engine.
2. Press the air release valve on top of the hydraulic
oil tank to release any remaining pressure.
3. Disconnect line (1) from the solenoid valve to be
measured. Install hose (Parts Number: 4216453),
tee (ST 6451), adapter (ST 6461), and pressure
gauge (ST 6942) to the disconnected end at the
solenoid valve side, as illustrated.
: 17 mm, 19 mm, 22 mm SC
(122±9 °F).
Measurement:
1. Select the following switch positions:
Auto-Idle/ Pressure Gauge
Engine Con- Power Mode Work Mode
Acceleration
trol Dial Switch Switch
Selector
Hose Piping
Digging
Fast Idle P Mode OFF
Mode
Evaluation:
The average value read on the pressure gauge shall
be within ±0.2 MPa (±2 kgf/cm2, ±28 psi) of the value
indicated on Dr.EX.
T4-4-4
OPERATIONL PERFORMANCE TEST / Component Test
Solenoid Valve Set Pressure Adjustment Proce-
dure
7
IMPORTANT: Do not loosen the adjusting screw
excessively. 8
The O-ring on the threads may come
off the sealing surface, causing oil
leakage.
Be sure to turn the adjusting screw
less than 2 turns to loosen. T107-06-04-020
The distance between the
lock nut end and screw end
should be 2.0 mm (0.079 in)
1. Mark the end of the adjusting screw with a white or less.
marker for the record of the original position.
(Take care not to touch any part of the screw
threads with the white marker.)
2. Loosen lock nut (7). Turn adjusting screw (8) to
adjust the set pressure of the solenoid valve. 8
3. Retighten lock nut (7).
: 10 mm
: 3 mm 7
: 5 N⋅m (0.5 kgf⋅m, 3.6 lbf⋅ft)
T107-06-05-001
W107-02-05-129
T4-4-5
OPERATIONL PERFORMANCE TEST / Component Test
MAIN PUMP DELIVERY PRESSURE
: 6 mm
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
Remedy:
Refer to the Troubleshooting B in Group T5-4.
T4-4-6
OPERATIONL PERFORMANCE TEST / Component Test
(Blank)
T4-4-7
OPERATIONL PERFORMANCE TEST / Component Test
MAIN RELIEF VALVE SET PRESSURE
Summary:
Measure the main relief valve setting pressure at the
main pump delivery part. Pressure Check Ports
The main relief pressure can also be measured with
the built-in diagnosing system or Dr.EX.
Preparation:
1. Properly shut down the engine.
2. Press the air release valve on top of the hydraulic
oil tank to release any remaining pressure.
3. Remove the plug from the main pump delivery
port. Install adapter (ST 6069), hose (ST 6943)
and pressure gauge (ST 6941) on the port.
: 6 mm
Measurement:
1. Select the following switch positions:
Power Work Auto-Idle /
Engine Con-
Mode Mode Acceleration
trol Dial
Switch Switch Selector
Dipping
Fast Idle P Mode Mode OFF
Evaluation:
Refer to the Performance Standard Table in Group
T4-5.
T4-4-8
OPERATIONL PERFORMANCE TEST / Component Test
T4-4-9
OPERATIONL PERFORMANCE TEST / Component Test
Swing Relief Valve Set Pressure Adjustment
T1HH-01-02-004
T107-02-04-020
Adjusting Plug
Pressure Pressure
Increase Decrease
T157-05-04-023
T4-4-10
OPERATIONL PERFORMANCE TEST / Component Test
Travel Relief Valve Set Pressure Adjustment
ZAXIS330,ZAXIS350H:
1. Loosen the lock nut to adjust the adjusting plug.
ZAXIS370MTH:
Travel Relief
Valve
2 1
Adjusting Screw ZAXIS370MTH:
Pressure Pressure
Increase Decrease
T142-05-04-007
W107-02-05-129
T4-4-11
OPERATIONL PERFORMANCE TEST / Component Test
OVERLOAD RELIEF VALVE SET PRES-
SURE
Summary:
1. The circuit pressure must be increased by apply- 4. Select the monitoring function of the built-in diag-
ing an external force while blocking the return cir- nosing system (or Dr.EX). Start the engine. Con-
cuit from the control valve. This measuring firm that no oil leakage is observed at the pres-
method is hazardous and the results obtained with sure gauge connection.
this method are unreliable. 5. Maintain the hydraulic oil temperature at 50±5 °C
2. The oil flow rate used to set the overload relief (122±9 °F).
pressure is far less than that used to set the main
relief pressure. Therefore, measuring the over- Measurement:
load pressure in the main circuit by increasing the 1. Select the following switch positions:
main relief set-pressure more than the overload Auto-Idle /
Engine Power Mode Work Mode
valve set-pressure is not a proper method. In Acceleration
Control Dial Switch Switch
addition, in case a main relief valve designed to Selector
leak a small quantity of oil before reliving is used, Digging
its pre-leaking start pressure must be increased Fast Idle P Mode OFF
Mode
more than the overload relief valve set-pressure.
However, the pre-leaking start pressure is not al- 2. Slowly operate bucket, arm, and boom control
ways increased more than the overload relief levers to the stroke ends to relieve each function
valve set-pressure as the adjustable upper limit of one at a time.
the main relief valve set-pressure is provided. Ac- 3. Read the pressures on the pressure gauge while
cordingly, the overload relief valve assembly releasing the front functions.
should be removed from the machine and 4. Perform the measurement for the bucket, arm,
checked on a specified test stand at a correct oil and boom, in that order.
flow rate. Some overload relief valves come in 5. Repeat the measurement three times and calcu-
contact with the control valve body to block the oil late the average value for each front function.
passage. When this type of overload relief valve is
checked, the control valve body must be precisely Evaluation:
finished as the test unit. Provide one control valve 1. Performance of the overload relief valves are
other than that on the machine as a test kit. normal if the measured main relief pressures are
3. If the overload relief valve performance must be within the specified value range.
checked on the machine, however, measure the
main relief pressure while releasing each front Refer to the Performance Standard Table in
function respective to the measuring overload re- Group T4-5.
lief valve. And, assume that the overload relief Pressure
valve is functioning correctly if the obtained main Check Ports
relief pressure is within the specified value range.
Measure the main pressure of the front functions
with the built-in diagnosing system or Dr.EX as fol-
lows:
Preparation:
1. Shut down the engine properly.
2. Press the air relief valve on top of the hydraulic oil
tank to release any remaining pressure.
3. Remove the plug from the main pump delivery
port. Install adapter (ST 6069) and pressure
gauge (ST 6934) on the port.
: 6 mm
T1HH-04-04-005
T4-4-12
OPERATIONL PERFORMANCE TEST / Component Test
Overload Relief Valve Set Pressure Adjusting
Procedure
Adjustment:
Adjust the pressure setting of the overload relief valve
using adjusting screw (2) after loosening lock nut (1).
: 22 mm
: 22 mm
T4-4-13
OPERATIONL PERFORMANCE TEST / Component Test
MAIN PUMP FLOW RATE MEASUREMENT
• P-Q Control (Torque Control) 9. Start the engine. Check for any oil leaks at con-
Summary: nections to the pressure gauge. Connect Dr. EX
Main pump performance is checked by measuring and select the monitoring function.
the pump flow rate with a hydraulic tester installed at
the main pump delivery port (one side) to be meas-
ured. Use Dr. EX and a pressure gauge at the same Measurement:
time. 1. Maintain the hydraulic oil temperature at 50±5 °C
(122 ± 9°F)
IMPORTANT: This measurement procedure is a 2. Measure the maximum flow rate.°
simple method. The measured data 3. Select each switch position as follows:
will be lower by approx. 5 % than the Auto-Idle /
Engine Power Mode Work Mode
accurately measured value. To Acceleration
Control Dial Switch Switch
measure accurately, disconnect the Selector
return circuit from the control valve Digging
and connect it to the hydraulic oil Fast Idle P Mode OFF
Mode
tank.
3. Slowly close the loading valve of the hydraulic
Preparation: tester while relieving the pressure. Measure the
1. Stop the engine. Push the air bleed valve to bleed flow rates and engine speeds at the pressure
air. Connect a vacuum pump to the oil filler port. points specified in the P-Q curve.
NOTE: Operate the vacuum pump while connect- 4. Repeat each measurement three times and calcu-
ing the pump flow rate test line. late the average values.
2. Disconnect the delivery hose from the main pump
(one side) to be measured. Connect pipe (1 or 2)
to the pump delivery port using the split flanges
and bolts which were used to connect the discon-
nected delivery hose.
: 41 mm : 10 mm
3. Connect hose (1 or 2) to hydraulic tester (5) using
test hose (3) and adapter (4). Connect adapter (6),
joint (7), test hose (8) and flange (9) to hydraulic
tester (5).
: 41 mm : 10 mm
4. Connect the delivery hose to flange (9) with split
flanges (10) and bolts (11).
: 10 mm
5. Install a pressure gauge to the main pump to be
measured. (Refer to T4-4-8 Main Relief Pressure
Check.)
: 6 mm
6. Remove regulator pipe (14).
Install hose (ST 6339) (13) to the port for regulator
pipe (14) to be measured.
Install plug (ST 6212) to the port for regulator pipe
(14) not to be measured.
7. Disconnect the vacuum pump. Loosen plug (12)
on the top of the pump casing to bleed the air
from the casing until oil comes out.
8. Fully open the loading valve located on the port-
able tester.
T4-4-14
OPERATIONL PERFORMANCE TEST / Component Test
Evaluation:
1. Convert the measured flow rates to those at the 2. Standard Flow Rate
specified pump speed using the following formu- Refer to T4-5 Operational Performance Standard.
las:
Qc = (Ns × Q) ⁄ Ne
1, 2 3 4 5 6 7 8 9 10 11
Delivery Hose
(To Control
Valve)
T173-04-04-002
13
14
T1HH-01-02-003
T1HH-04-04-010
1- Pipe E (ST 6144) 5- Hydraulic Tester (ST 6299) 9- Flange (ST 6118) 12 - Plug
2- Pipe B (ST 6143) 6- Adapter PF1 × UNF1-7/8 10- Split Flange (ST 6130) 13 - Hose (ST 6339)
(ST 6146)
3- Test Hose (ST 6145) 7- Joint (ST 6330) 11- Bolt (ST 6409) (4 Used) 14- Pipe (2 Used)
4- Adapter PF1 × UNF1-7/8 8- Test Hose (ST 6320)
(ST 6146)
T4-4-15
OPERATIONL PERFORMANCE TEST / Component Test
T4-4-16
OPERATIONAL PERFORMANCE TEST / Component Test
1, 2 3 4 5 6 7 8 9 10 11
Delivery Hose
(To Control
Valve)
Port Pi
M T173-04-04-002
12
T1HH-04-04-002
T1HH-04-04-009
15 17
To Port Pi on Regulator
14 17 15 13 To Port PC on
16 15 14 Pilot Filter T1HH-04-04-008
1 - Pipe E (ST 6144) 6 - Adapter PF1 × UNF1-7/ 8 11 - Bolt (ST 6409) (4 used) 16 - Reducing Valve (4325439)
(ST 6146)
2 - Pipe B (ST 6143) 7 - Joint (ST 6330) 12 - Plug M 17 - Tee UNF7 / 16 × UNF 7 / 16
3 - Test Hose (ST 6145) 8 - Test Hose (ST 6320) 13 - Adapter UNF 7 / 16 × 18 - Pressure Gauge (ST 6931)
PF 1 / 4 (ST 6069)
4 - Adapter PF1 × UNF1-7 / 8 9 - Flange (ST 6118) 14 - Hose UNF7 / 16 × 19 - Hose UNF 7 / 16 ×
(ST 6146) UNF7 / 16 (4334309) UNF 7 / 16 (4334309)
5 - Potable Tester (ST 6299) 10 - Split Flange (ST 6130) 15 - Adapter PF3 / 8 × 20 - Adapter PF3 / 8 ×
UNF 7 / 16 (4200465) UNF 7 / 16 (4200465)
T4-4-17
OPERATIONAL PERFORMANCE TEST / Component Test
Regulator Adjustment
6 5
1
3
2
4
10
T1HH-03-01-002
7 8
1 - Lock Nut (For Minimum 4 - Adjusting Screw(For Maxi- 7 - Lock Nut 9 - Lock Nut
Flow Adjustment) mum Flow Adjustment) (For P-Q Line Adjustment) For P-Q Line Adjustment)
2 - Adjusting Screw (For Mini- 5 - Lock Nut 8 - Adjusting Screw 10 - Adjusting Screw
mum Flow Adjustment) (For Pilot Pressure Char- (For P-Q Line Adjustment) (For P-Q Line Adjustment)
acteristic Adjustment)
3 - Lock Nut (For Maximum 6 - Adjusting Screw
Flow Adjustment) (For Pilot Pressure Char-
acteristic Adjustment)
T4-4-18
OPERATIONAL PERFORMANCE TEST / Component Test
Pi
2. Maximum Flow Rate After loosening lock nut (3), turn 1) Do not tighten adjusting screw
Q adjusting screw (4). Tightening ad- (2) more than two turns.
justing screw (4) 1/4 a turn de- 2) Do not attempt to increase the
creases the maximum pump flow maximum flow rate. (Do not turn
3
rate by 10.00 cm /rev. adjusting screw (4) counter-
clockwise.)
3) Securely retighten lock nut (3)
after adjustment.
Pd
3. Pilot Control Characteris- After loosening lock nut (5), turn 1) Do not tighten adjusting screw (6)
tics adjusting screw (6). Tightening ad- more than one turn.
(Pi-Q Line) justing screw (6) 1/4 a turn de- 2) When adjusting screw (6) is
creases the pump flow rate by tightened, the maximum flow rate
3
Q 17.11 cm /rev. decreases. Therefore, after tight-
ening adjusting screw (6), loosen
adjusting screw (4) by the ratio of
2 (adjusting screw (4) turn) to 1
(adjusting screw (6) turn) to main-
tain the maximum flow rate un-
changed. The loosening vs. tight-
ening ratio of 2 to 1 should always
Pi be kept constant.
3) Securely retighten lock nut (5)
after adjustment.
4. Pump Output Torque A. After loosening lock nut (7), turn 1) Do not tighten adjusting screw
(P-Q Line) adjusting screw (8). Tightening (8) more than one turn.
Q adjusting screw (8) 1/4 a turn in- 2) Increase or decrease the flow
creases the pump flow rate by rate. So that the engine is not
3
A 19.85 cm /rev. overloaded.
B. After loosening lock nut (9), turn 3) Securely retighten lock nut (3 or
Pd adjusting screw (10). Tightening 9) after adjustment.
Q adjusting screw (10) 1/4 a turn
increases the pump flow rate by
3
3.73 cm /rev.
B
Pd
T4-4-19
OPERATIONAL PERFORMANCE TEST / Component Test
SWING MOTOR DRAINAGE
Summary:
To check swing motor performance, measure the
amount of oil draining from the swing motor while
swinging the upperstructure.
Preparation:
1. Maintain hydraulic oil temperature at 50±5 °C
(122±9 °F). Rotate the swing motor to warm the T157-05-04-014
2
inside of the motor.
2. Properly shut down the engine. Press the air re-
lease valve (1) on top of the hydraulic oil tank to
release any remaining pressure.
3. Disconnect the swing motor drain hose (2) at the
hydraulic oil tank end. Install plug (ST 6213) to the
disconnected end on the hydraulic oil tank.
: 22 mm
: 39 N⋅m (4 kgf⋅m, 29 lbf⋅ft)
T4-4-20
OPERATIONAL PERFORMANCE TEST / Component Test
Measurement:
1. Amount of Oil Drained While Swinging the Upper-
structure
(1) Fully retract the arm cylinder. Fully extend the
bucket cylinder. Raise the boom so that the
arm tip pin height is the same as the boom foot
pin height. Be sure that the bucket is empty.
(2) Start the engine. Operate and hold the swing
lever full stroke. Start draining oil measure- The same height as
boom foot pin height
ment after the swing speed reaches a constant
maximum speed. The measuring time should
T105-06-03-013
be more than 45 seconds.
(3) Repeat the measurement at least three times
in both clockwise and counterclockwise direc-
tions, and calculate the average values.
Evaluation:
Refer to the Performance Standard Table in group
T4-5.
Ȁ ∆Q = 60 × q / t
Where:
∆Q : Amount of drain oil per minute (L/min)
t : Time measured (seconds) T107-06-05-008
T4-4-21
OPERATIONAL PERFORMANCE TEST / Component Test
TRAVEL MOTOR DRAINAGE
Summary:
1
To check travel motor performance, measure the
amount of oil draining from the travel motor while ro-
tating the travel motor with the measuring side track
jacked up.
Preparation: T157-05-04-014
1. Main hydraulic oil temperature at 50±5 °C (122±9
°F). Rotate the travel motor to warm the inside of ZAXIS330, ZAXIS350H:
the motor.
2
2. Properly shut down the engine. Press the air re-
lease valve (1) on top of the hydraulic oil tank to
release any remaining pressure.
3. Disconnect the travel motor drain hose (2) at the
travel motor end. Install plug (ST 6637) to the dis-
connected end. Connect the drain hose (3/4-
16UN) to the travel motor.
: 22 mm, 27 mm
: 93 N⋅m (9.5 kgf⋅m, 69 lbf⋅ft)
M183-01-001
T4-4-22
OPERATIONAL PERFORMANCE TEST / Component Test
Measurement:
Amount of Oil Drained While Rotating Travel Motor
Evaluation:
Refer to Performance Standard Table in group T4-5.
The total performance of the travel motor should be
evaluated by referring to the test results of travel
speed and mistrack.
T157-05-04-019
∗ Conversion of the amount of drain oil measured into
the per-minute value
Ȁ ∆Q = 60 × q / t
Where:
∆Q : Amount of drain oil per minute (L/min)
t : Time measured (seconds)
q : Total amount of drain oil (L)
T4-4-23
OPERATIONAL PERFORMANCE TEST / Component Test
(Blank)
T4-4-24
OPERATIONAL PERFORMANCE TEST / Standard
OPERATIONAL PERFORMANCE STAN-
DARD TABLE
The standard performance values are listed in the ta- Engine Control Dial : Fast Idle
ble below. Refer to group T4-2 for performance test Power Mode Switch : P Mode
procedures. Values in parentheses are reference val- Auto-Idle / Acceleration Selector: OFF
ues. Work Mode Switch : Digging Mode
The following switch positions shall be selected and Hydraulic Oil Temperature
the hydraulic oil temperature shall be maintained as : 50±5 °C (122±9 °F)
indicated below when measuring performance unless
otherwise specified.
Performance
PERFORMANCE TEST DESIGNATION Remarks
Standard
ENGINE SPEED min -1
T4-5-1
OPERATIONAL PERFORMANCE TEST / Standard
Performance
PERFORMANCE TEST DESIGNATION Remarks
Standard
SWING BEARING PLAY mm 0.2 to 1.25 Allowable Limit: 2.0 to 3.05
HYDRAULIC CYLINDER CYCLE TIME sec 3.2 m Arm
3
1.4 m (PCSA heaped) Bucket
Boom Raise ZAXIS330: 3.4±0.3
ZAXIS350H, ZAXIS370MTH: 3.6±0.3
Boom Lower ZAXIS330: 2.4±0.3
ZAXIS350H, ZAXIS370MTH: 2.2±0.3
Arm Roll-In 4.4±0.3
Arm Roll-Out 3.2±0.3
Bucket Roll-In 4.0±0.3
Bucket Roll-Out 2.7±0.3
DIG FUNCTION DRIFT CHECK mm/5 min 3.2 m Arm
3
1.4 m (PCSA heaped) Bucket
Boom Cylinder (Maximum Reach Position) 20 or less
(Arm Roll-In Position) 5 or less
Arm Cylinder (Maximum Reach Position) 30 or less
(Arm Roll-In Position) 15 or less
Bucket Cylinder (Maximum Reach Position) 20 or less
(Arm Roll-In Position) 10 or less
Bucket Bottom (Maximum Reach Position) 150 or less
(Arm Roll-In Position) 110 or less
CONTROL LEVER OPERATING FORCE HITACHI Lever Pattern
N (kgf, lbf)
Boom Lever 18 (1.8, 13.0)
or less
Arm Lever (ISO Lever Pattern: Swing Lever) 15 (1.5, 10.8)
or less
Bucket Lever 15 (1.5, 10.8)
or less
Swing Lever (ISO Lever Pattern: Arm Lever) 18 (1.8, 13.0)
or less
Travel Lever 28 (2.8, 20.3)
or less
CONTROL LEVER STROKE mm HITACHI Lever Pattern
Boom Lever 105±10
Arm Lever (ISO Lever Pattern: Swing Lever) 84±10
Bucket Lever 84±10
Swing Lever (ISO Lever Pattern: Arm Lever) 105±10
Travel Lever 120±10
COMBINED BOOM RAISE/SWING FUNCTION 3.2 m Arm
3
Time to Swing 90° 1.4 m (PCSA heaped) Bucket
With bucket empty sec
ZAXIS330 : 4.0±0.4
ZAXIS350H, ZAXIS370MTH: 4.3±0.4
Bucket Teeth Height When Swinging 90° mm
ZAXIS330 : 7200 or more
ZAXIS350H, ZAXIS370MTH: 6500 or more
Boom Raise / Arm Roll-In sec 5.5±0.5 3.2 m Arm
3
1.4 m (PCSA heaped) Bucket
T4-5-2
OPERATIONAL PERFORMANCE TEST / Standard
Performance Stan-
PERFORMANCE TEST DESIGNATION Remarks
dard
PRIMARY PILOT PRESSURE 2
MPa (kgf/cm , psi) +1.0
4.0 -0.5
Engine: Fast Idle +10
(40 -5 570 -71)
+142
T4-5-3
OPERATIONAL PERFORMANCE TEST / Standard
MAIN PUMP P-Q CURVE
(L/min)
300
A B
250
C
D
200
E
Flow Rate
150
100
50
0
4.9 (50) 9.8 (100) 14.7 (150) 19.6 (200) 24.5 (250) 29.4 (300) 34.3 (350)
T173-04-05-001
T4-5-4
OPERATIONAL PERFORMANCE TEST / Standard
• P-Q Control by Pump Control Pilot Pressure Signal
(Pilot Pressure Characteristics) Points on P-Q Line
(Reference: Measured at Test Stand) Pump Control Pressure Flow Rate
2
MPa (kgf/cm ) L/min
-1
• Rated Pump Speed: 1900 min (rpm) A − 73±3
• Hydraulic Oil Temperature: 50±5 °C B 0.78±0.05 (8.0±0.5) 93±3
C 2.94
+0.05
-0.29 (30
+0.5
-.3)
272±3
NOTE: Refer to page T4-4-16.
(L/min)
200
Flow Rate
B
100 A
MPa (kgf/cm 2 )
0 0.98(10) 1.96(20) 2.94(30)
T4-5-5
OPERATIONAL PERFORMANCE TEST / Standard
INJECTION PUMP
Test Conditions:
1. Injection pump: PE6P120/721LS3000
2. Governor: EP/RSV 200-1350
3. Nozzle and nozzle holder assembly: 105780-8140
(Bosch No. EF8511/9A)
4. Nozzle:Ȁ105780-0000 (Bosch No. DN12SD12T)
5. Nozzle holder: 105780-2080 (Bosch No.
EF8511/9)
6. Nozzle opening pressure:
2
17.2 MPa (175 kgf/cm , 2490 psi)
7. Test fuel: ISO 4113 or SAE J967d
8. Transfer pump pressure:
2
255 kPa (2.6 kgf/cm , 37 psi)
9. Injection pipe: Inner Dia. 3 mm×Outer Dia. 8 mmȍ
LengthȀ600 mm (0.118×0.315ȍ23.6 in)
10. Fuel temperature: 39 to 41 °C (109.2 to 114.8 °F)
11. Overflow valve opening pressure: 255 kPa (2.6
2
kgf/cm , 37.0 psi)
Governor adjustment
Rack limit
Idle-sub spring setting
Above
Boost Compensator Stroke; 0.7±0.1 mm
Governor spring setting
Pack Position
(mm)
Above
T4-5-6
OPERATIONAL PERFORMANCE TEST / Standard
DR. EX MONITOR INDICATING VALUES
T4-5-7
OPERATIONAL PERFORMANCE TEST / Standard
T4-5-8
OPERATIONAL PERFORMANCE TEST / Standard
T4-5-9
OPERATIONAL PERFORMANCE TEST / Standard
T4-5-10