Problem solving
Improvement
PRODUCTION ENGINEER 2019
How to Improve Actual Peci Capacity
▪ Peci production Actual Capacity Standard
▪ Improvement of Peci Production Capacity Standard
Peci Production Actual Capacity Standard
Machine Capacity
Core Peci Item
Setting Stroke Time per Shift per Month KESIMPULAN DATA KAPASITAS MESIN LEAN
Peci 01 Polos 13 Hz 1.25 sec 15,206 1,140,480
Desember 2018
Peci 02 Polos 16.1 Hz 1.27 sec 14,967 1,122,520
Peci 04 Polos 17,95 Hz 1.26 sec 30,171 2,262,857 • Kapasitas Peci Polos : 13.325.717 perbulan
Peci 05 Polos 24.5 Hz 1.25 sec 30,413 2,280,960
• Kapasitas Peci Lis : 12.796.418 perbulan
Peci 06 Polos 24 Hz 1.28 sec 29,700 2,227,500
Peci 07 Polos 9.2 Hz 1.29 sec 29,470 2,210,233 • Kapasitas Peci Emboss : 3.207.240 perbulan
Peci 01 Lis 13 Hz 1.04 sec 17,135 1,285,096 • Kapasitas Peci Crepe : 3.171.278 perbulan
16.1 Hz 1.27 sec 14,031 1,052,362
Peci 02 Lis
16 Hz 1.37 sec 26,015 1,951,095
• Kapasitas Peci lem tngh: 1.931.352 perbulan
Peci 03 Lis
Peci 04 Lis 18,58 Hz 1.21 sec 29,455 2,209,091 • Kapasitas Peci 2warna : 5.181.660 perbulan
Peci 05 Lis 24.5 Hz 1.25 sec 28,512 2,138,400
24 Hz 1.28 sec 27,844 2,088,281
Peci 06 Lis
9.2 Hz 1.29 sec 27,628 2,072,093
• Untuk Peci Lis terdapat penurunan kapasitas sebesar
Peci 07 Lis
Peci 04 Emboss 18 Hz 1.29 sec 22,102 1,657,674 3.97% thd Kapasitas jika jalan polos
Peci 07 Emboss 9,29 Hz 1.38 sec 20,661 1,549,565 • Untuk Item khusus yg tidak dapat dikerjakan di semua
Peci 01 9.3 Hz 1.51 sec 11,015 826,093
Crepe
11,25 Hz 1.80 sec 9.240 693.000
mesin:
Peci 02 Crepe
Peci 04 Crepe 12.56 Hz 1.51 sec 22,029 1,652,185 • Crepe aktual penurunan kapasitas 28%
Peci 01 Lem Tengah 11,07 Hz 1.23 sec 13,522 1,014,146
• Emboss aktual penurunan kapasitas 25%
Peci 02 Lem Tengah 15,07 Hz 1.36 sec 12,229 917,206
Tanggal 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Peci 1 33,045 33,045 33,045 33,045 33,045 33,045 33,045 33,045 33,045 33,045 33,045 33,045 51,405 51,405 51,405 51,405 51,405 51,405 51,405 51,405 45,618 45,618 45,618 45,618 45,618 45,618 45,618
Peci 2 27,720 27,720 27,720 27,720 27,720 27,720 27,720 27,720 27,720 27,720 27,720 27,720 18,211 42,093 42,093 42,093 42,093 42,093 42,093 42,093 44,901 44,901 44,901 44,901 44,901 44,901 44,901
Peci 3 60,171 60,171 60,171 60,171 22,870 78,045 78,045 78,045 78,045 78,045 78,045 78,045 78,045 78,045 78,045 78,045 78,045 78,045 78,045 78,045 83,247 83,247 83,247 83,247 83,247 83,247 83,247
Peci 4 66,306 33,694 72,963 72,963 66,087 66,087 66,087 66,087 66,087 66,087 66,087 88,365 88,365 88,365 88,365 88,365 88,365 88,365 88,365 88,365 90,513 90,513 90,513 90,513 90,513 90,513 90,513 66,335
Peci 5 74,130 74,130 74,130 74,130 85,536 85,536 85,536 85,536 85,536 85,536 85,536 85,536 85,536 85,536 85,536 85,536 85,536 85,536 85,536 85,536 91,329 91,329 91,329 91,329 91,329 91,329 91,329 91,329
Peci 6 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100 89,100
Peci 7 61,983 38,017 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 82,884 88,410 88,410 88,410 88,410 88,410 88,410 88,410 88,410
Productivity Actual Improvement
IMPROVEMENT :
• Peci Embos : 3% 6 Lipat Rongga ke Rapat setting drum pelipat - Rubah model Sepatu
7 Rijek Pelipat Pelipat Litho (sirip) Litho lompat dari sirip - Roll alur spt Masker
• Peci Crepe : 3.4% 8 Pengarah Litho (litho melet) - Roll alur spt Masker
Litho geser
• Peci Lem Tngh: 3.2%
9 Jubel Conveyor Penumpuk Conveyor naik lebih pelan dari mesin Speed Control -
• Peci 2warna : 3.8%
Rijek Jubel
10 Jubel Litho terbelit Landasan Permukaan landasan tdk halus Ganti landasan Pelubang Litho baru
Kalibrasi Roll-roll
15 Litho Putus Setting brake , roll pengarah tdk center AutoTension
pengarah
Rijek Tension
Roll besar tension tidak stabil karena Ganti brake kapasitas
16 Litho geser karena Roll besar AutoTension
melebihi kapasitas brake lebih besar
Push Downtime to Minimum
• According Lean Observation, Mean Downtime Peci 50% (3.3 jam)
Solusi
Waktu
No. Downtime Analisa Penyebab
(min) Jangka Pendek Jangka Panjang
1 Setting Polymer baru/2 warna 30 Ganti OP, skill operator Digital Printing
2 Ganti Bahan 22 Bahan habis Auto Splacing
Bersih-bersih, Isi Laporan, Persiapan
3 21 Persiapan pulang Mi-Scada
Pulang
ScoreBoard Voice
4 Idle (ngobrol, jalan, Sholat, Toilet, dll..) 20 Sikap Pribadi Training
Assistance
Order Note
6 Briefing 16 Koordinasi Pekerjaan ditempel sblm Mi-Scada
awal shift
7 Setting dan Persiapan Produksi 15 Ganti shift Overlap shift
Buat
Lem jauh tidak boleh disimpan penampungan Central Distribution
8 Mengambil Lem 15
di area produksi kapasitas 1shift di Pump
dalam mesin
14 Bahan putus terlilit roll, pisau, dll 3 Setting Tension tidak pas AutoTension
Machine Breakdown Margin
Theory Capacity = Capacity per shift * Productivity Margin per machine * Breakdown Margin per machine