MODEL UNIT SERIAL NUMBER ENGINE MODEL

1 Liugong CLG 835 ADL366285 6BTAA5.9-C130

2 Liugong CLG 835 CHL562970 6BTAA5.9-C130

3 Liugong CLG 835 LGL561020 6BTAA5.9-C130

4 Liugong CLG 835 CHL561737 6BTAA5.9-C130

5 Liugong CLG 835 EHL562627 6BTAA5.9-C130

6 Liugong CLG 835 VGL560980 6BTAA5.9-C130

7 Liugong CLG 835 EHL 561803 6BTAA5.9-C130

8 Liugong CLG 835 KGL560605 6BTAA5.9-C130

9 Liugong CLG 835 HHL561685 6BTAA5.9-C130

10 Liugong CLG 835 THL562971 6BTAA5.9-C130

11 Liugong CLG 835 PHL562616 6BTAA5.9-C130


12 Liugong CLG 835 KGL560653 6BTAA5.9-C130

13 Liugong CLG835 CGL561000 6BTAA5.9-C130

14 Liugong CLG835 LGL560983 6BTAA5.9-C130

15 Liugong CLG835 PGL560571 6BTAA5.9-C130

16 SDLG LG936L

17 Liugong CLG835 CHL561793 6BTAA5.9-C130

18 Liugong CLG835 THL561805 6BTAA5.9-C130

19 SDLG 958 L WD106220EZ1

20 Liugong CLG 835 CGL560686 6BTAA5.9-C130

21 SDLG 958 L VGL09587F06 WD106220E1

22 SDLG 958 L LVF0600430 WD10G220E21

23 Liugong CLG 835 LGL560823 6BTAA5.9-C130

24 Liugong CLG 835 EHL561798 6BTAA5.9-C130


25 Liugong CLG 835 CGL561079 6BTAA5.9-C130

26 Liugong CLG 835 CGL560980 6BTAA5.9-C130

27 Liugong CLG 835 VHL590020 6BTAA5.9-C130

28 Liugong CLG 835 CHL561687 6BTAA5.9-C130

NOTE : = BREAKDOWN
= RFU
INSPECTI

ENGINE S/N TRANSMISSION MODEL C/N UNIT SMR

87416120 BS305 WL 01 11990

78484225 BS305 WL 123 2851

78358806 BS305 WL 70 2840

78358804 BS305 WL 105 3195

78470848 BS305 WL 114 2181

78299760 BS305 WL 49 4070

78373820 BS305 WL93 3444

78296787 BS305 WL44 6878

78373814 BS305 WL103 3416

78484221 BS305 WL 004 328

78470844 BS305 WL111 2668


78304345 BS305 WL 50 5486

78355144 BS305 WL68 4243

78351653 BS305 WL67 3077

78289505 BS305 WL74 4197

WL33

78362192 BS305 WL89 2324

78377984 BS305 WL88 2045

12150012780 WG-200 WL 25 6503

BS305 WL 61 2886

1215H804941 WG-200 WL 36 5599

1215D012786 WG-200 WL 31 6038

78317712 BS305 WL 52 3402

78296790 BS305 WL 45 3891


78353148 BS305 WL 84 3439

78351641 BS305 WL 66 4902

78484217 BS305 WL 122 2319

78373807 BS305 WL 95 2402


INSPECTION REPORT WHEEL LOADER AREA

SITE DAY/DATE

PEGANDON Rabu 13-12-2018

PEGANDON Rabu 12-12-2018

PEGANDON Rabu 12-12-2018

PEGANDON Rabu 12-12-2018

MAJU MIX Rabu 5-12-2018

MAJUMIX Rabu 5-12-2018

REJOSARI Jum'at 14-12-2018

GRINGSING Selasa 11-12-2018

GRINGSING Selasa 11-12-2018

GRINGSING Selasa 11-12-2018

KANDEMAN Senin 10-12-2018


KANDEMAN Senin 10-12-2018

KANDEMAN Senin 10-12-2018

BALAMOA Jumat 7-12-2018

BALAMOA Jumat 7-12-2018

BALAMOA Jum'at 7-12-2018

TALUN 2 Sabtu 8-12-2018

TALUN 2 Sabtu 8-12-2018

TALUN 1 Minggu 9-12-2018

TALUN 1 Minggu 9-12-2018

TALUN 1 Minggu 9-12-2018

TALUN 1 Minggu 9-12-2018

PETARUKAN Kamis 6-12-2018

PETARUKAN Kamis 6-12-2018


PETARUKAN Kamis 6-12-2018

NGALIYAN Senin 17-12-2018

NGALIYAN senin 17-12-2018

NGALIYAN senin 17-12-2018


TION REPORT WHEEL LOADER AREA PANTURA DESEMBER

RESULT OF INSPECTION SUGGESTION REPAIR

1. Bearing Pully fan damage 1.replace bearing


2.Battery Drop Voltage 2.Recharge Battery
3.Pad brake front LH wornout 3.Replace pad brake

1.Cover Rocker arm leak ( cyl no 1 ) 1.Replace Seal Rocker Arm


2.Air Cleaner Clogged 2.Cleaning Air Cleaner

1. Machine is Good Condition

1.Cover Rocker Arm Leak 1.Replace Seal


2.Seal Hub Front RH Leak 2.Reseal Hub

1.Pad brake front LH worn out 1.Replace pad brake

1.Guard Fan radiator missing 1.Replace Guard


2.Cap fuel tank missing 2.Replace Cap
3.Universal Joint broken ( front ) 3.Replace universal joint
4.Battery Low Voltage 4.Recharge Battery

1.Battery Low Voltage 1.Recharge Battery

1. lock hink oin broken 1. repair lock pin


2.Disc Brake R L/H Worn 2. replace pad brake
3. Blowby pressure high 3.recomended over houl engine
4.Battery Low Voltage 4.Replace Battery

1.Boom Cyl RH Leak 1.Reseal Boom Cyl


2.Caliper Brake Front RH Leak 2.Reseal Caliper Brake

1.Machine is good condition

1.Pad Brake rear RH wornout 1.Replace Pad Brake


1.Gasket Oil Pan Leak 1.Replace gasket
2.Hose Boom RH leak 2.Replace Hose

1.Expension tank radiator leak 1.Repair expantion tank


2.Gasket cover hydrolik tank leak 2.Replace gasket

1.Cover roker arm leak 1.Replace gasket cover

1.Sensor transmisi control valve leak 1.Replace sensor


2.Pad brake rear RH wornout 2.Replace pad brake

1.hose oil cooler hyd leak


2.fuse box abnormal

1.Horn malfuction 1.Replace horn


2.Schedule replace oil final drive & diffetential 2.Replace oil final drive & differential

1.Pad brake front RH wornout 1.Replace pad brake


2.Schedule replace oil final drive & diffetential 2.Replace oil final drive & differential

1.Air regulator valve leak 1.Replace regulator valve


2.Hose return FIP not instal 2.Instal hose
3.Bateray not instal 3.Instal bateray
4.Starting motor not instal 4.Instal starting motor

1.seal pinion differential front leak 1.Replace seal


2.Plug housing flywhel mising 2.Instal plug
2.Schedule replace oil final drive & diffetential 2.Replace oil final drive & differential

1.Steering Valve Leak 1.Replace Steering Valve


2.Gasket cover roker arm leak 2.replace gasket
3.Bolt mounting servo lose 3.Torque bolt mounting

1.Hose and Compressor AC Damage 1.Replace Host and Compressor AC

1.Belt fan radiator leak 1.Replace belt


2.Steering cylinder LH leak 2.Reseal cylinder
3.piping lubricating turbo leak 3.Replace piping
4.O ring hose boom leak 4.Replace o ring
5.Air presure gauge malfuction 5.Repair wiring air presure sensor

1.Pad brake rear RH wornout 4.Replace pad brake


1.Piping cooling air compressor leak 1.Replace o-ring piping
2.Oil level transmisi low 2.Add oil transmisi

1Cap Fuel tank missing 1.instal cap


2.Hose Oil Cooler leak 2.replace hose
3.Battery Drop Voltage 3.recharge battery
4.pad brake rear LH wornout 4.replace pad brake

1.cap fuel tank missing 1.instal cap

1.Lift device controller malfucntion 1.repair lift device


TURA DESEMBER 2018

REPLACEMENT PART
ACTION TAKEN DATE
PART NUMBER

2.Cleaning Air Cleaner

2.Reseal Hub Front RH


2.Add oil transmisi Kamis 6-12-2018
REPLACEMENT PART
QTY STATUS REPAIR
PART DESCRIPTION

OPEN

OPEN

OPEN

OPEN

OPEN
OPEN

CLOSED

CLOSED

OPEN

CLOSED

OPEN

CLOSED

OPEN
CLOSED

OPEN

OPEN
STATUS UNIT
REMARK

2.Waiting Battery BreakDown

RFU
CLOSED

RFU

OPEN
RFU
CLOSED

RFU

Waiting Battery BREAKDOWN

Waiting Battery BREAKDOWN

Waiting Battery BREAKDOWN

RFU

RFU

RFU
RFU

RFU

RFU

RFU

RFU

RFU
action by mekanik aneka

RFU
action by mekanik aneka

1.Waiting Order
RFU

RFU
action by mekanik aneka

1.Waiting Order
RFU
action by mekanik aneka

1.Waiting Repair RFU

RFU

RFU
RFU
action by mekanik aneka

RFU

RFU

RFU
No. MODEL UNIT SERIAL NUMBER ENGINE MODEL ENGINE S/N

1 CUMMINS 350KVA NTA855-G4 41230091

2 CUMMINS 350KVA NTA855-G4 41231604

3 CUMMINS 350KVA NTA855-G4 41247840

4 CUMMINS 350KVA NTA855-G4 41251954

5 CUMMINS 350KVA NTA855-G4 41251955

6. CUMMINS 350KVA NTA855-G4 41230715

7 CUMMINS 500KVA KTA19-G4 41237551

8 CUMMINS 500KVA KTA19-G4 41235646

9 CUMMINS 500KVA KTA19-G4 41248305

10 CUMMINS 350KVA NTA855-G4 41230284

11 CUMMINS 350KVA NTA855-G4 41223952

12 PERKINS 500KVA PERKINS 2200 2206CE13TAG2

13 CUMMINS 500KVA KTA19-G4 41235277

14 CUMMINS 350KVA NTA855-G4 41213397


INSPECTION R
GENERATOR MODEL C/N UNIT SMR SITE DAY/DATE

STAMFORD 350KVA GS 44 2828 PEGANDON Rabu 12-12-2018

STAMFORD 350KVA GS42 1220 GRINGSING Selasa 11-12-2018

STAMFORD 350KVA GS 84 1997 NGALIYAN Senin 17-12-2018

STAMFORD 350KVA GS 100 BALAMOA Jumat 7-12-2018

STAMFORD 350KVA GS 96 2667 BALAMOA Jumat 7-12-2018

STAMFORD 350KVA GS 41 788 PETARUKAN Kamis 6-12-2018

STAMFORD 500KVA GS 73 1758 TALUN 1 Minggu 19-12-2018

STAMFORD 500KVA GS 72 1762 TALUN 1 Minggu 19-12-2018

STAMFORD 500KVA GS 74 3204 TALUN 2 Sabtu 8-12-2018

STAMFORD 350KVA GS 56 1220 BALAMOA Jumat 7-12-2018

STAMFORD 350KVA GS 46 1028 KANDEMAN Senin 10-12-2018

STAMFORD 500KVA GS 03 3580 BALAMOA Jumat 7-12-2018

STAMFORD 500KVA GS76 1846 BALAMOA Jumat 7-12-2018

STAMFORD 350KVA GS 18 8403 BALAMOA Jumat 7-12-2018


INSPECTION REPORT GENSET AREA PANTURA BULAN DESEMBER 2018

RESULT OF INSPECTION SUGGESTION REPAIR


1.Machine is Good Condition

1.Machine is Good Condition

1.Machine is Good Condition

1.Bateray drop voltage 1.Replace bateray

1.Bateray uninstal on unit 1.Instal bateray

1.Terminal bateray (+) broken 1.Replace terminal

1.Hose intercooler leak

1.Machine is Good Condition

1.hose oil filter leak 1. replace hose


2. o-ring oil jet collant leak 2. replace o-ring

1.Bateray uninstal on unit 1.instal bateray

1.Machine is Good Condition

1.Machine is Good Condition

1.Machine is Good Condition

1.Bateray uninstal on unit 1.instal bateray


LAN DESEMBER 2018
REPLACEMENT PART
ACTION TAKEN DATE
PART NUMBER

1.Torque clamp hose Minggu 19-12-2018


REPLACEMENT PART
QTY STATUS REPAIR REMARK
PART DESCRIPTION
1.Unit Stand By Ready

1.Unit Stand by ready

1.Unit Stand By Ready

1.Unit Stand By Ready

1.Unit Stand By Ready

OPEN 1.Unit Stand by Ready

CLOSE 1.Unit Stand By Ready

1.Unit Stand By Ready

OPEN 1.Unit Operation With Load 30kW

1.Unit Stand By Ready

1.Unit Stand By Ready

1.Unit Stand By Ready

1.Unit Stand By Ready


STATUS UNIT

RFU

RFU

RFU

RFU

RFU

RFU

RFU

RFU

RFU

RFU

RFU

RFU

RFU

RFU