INTERNAL PRELIM
Waktu Pelaksanaan 4.0 BK 8.00 MK 56.00 HK.
TEMPORARY FENCING
1.0 Pagar proyek / Sementara = 80.00 m' x
2.0 Renovasi pagar 2 x = - m' x
3.0 Pintu Masuk / Keluar = - Bh x
STEAKING OUT
4.0 Bouwplank = m' x
5.0 Land clearing = 112.00 m2 x
6.0 Alat Ukur Theodolite Total Station + Auto Level = 1.00 - Bln x
7.0 Meteran (50 mtr) = 1.00 1.00 Bh x
8.0 Meteran ( 5 mtr) u/ Pelaksana & Surveyor = - 2.00 Bh x
9.0 Pembuatan laporan data pengukuran 682,295.00 = 1.00 1.00 ls x
10.0 Consumable - 1.00 ls x
5 AIR KERJA
33.0 Air kerja = Jt. + - bln x
Biaya Sambung dan Jaminan Meteran 1.00 Ls x
Biaya Bulanan 3.00 bln x
34.0 Sarana Air kerja =
Inst Pipa dan accessories - lot x
Tandon Air Cap 1 m3 - unit x
Pompa air - unit x
Consumable - Ls x
Perawatan - Ls x
LISTRIK KERJA
35.0 Genset 60 KVA u/ site office = 1.00 - bln x
Genset 10 KVA Portable u/ area kerja - 2.00 bln x
Operator 1.00 1.00 bln x
36.0 Biaya Operasional (BBM) = - ltr x
37.0 Sarana listrik kerja = 3.00 lot x
38.0 Listrik kerja untuk kontraktor spesialis = - Ls x
8 SAFETY
39.0 Sertifikasi Pekerja
Sertifikasi kerja diketingian = - Org x
Sertifikasi welder - Org x
Sertifikasi Scaffolder - Org x
Serifikasi Inspector Scaffolding - Org x
Sertifikasi Rigger - Org x
40.0 Perlengkapan Safety :
TOA Megaphone w/ Sirene - unit x
Bendera K3, Negara, Company + tiang dan pondasi - ls x
Banner Safety , Papan Laporan dll - ls x
W/ proof Torch Light 4 battery - unit x
Kotak Sampah hijau, kuning, merah + kaki 1.00 set
41.0 Perlindungan Kebakaran :
Pemadam kebakaran (APAR) 6 kg = 1.00 Bh x
Fire Blanket = 1.00 Bh x
Safety Sign bahaya kebakaran - lot x
42.0 Sarana Pelindung Diri :
Safety Helmet (Untuk staf) = 4.00 Bh x
Safety Shoes staff = 1.00 Bh x
Rompi Staf = 1.00 Bh x
Safety Helmet (Untuk pekerja) = 20.00 Bh x
Safety Shoes pekerja = 20.00 Bh x
Rompi Pekerja = 20.00 Bh x
Sarung Tangan Catoon 50.00 losin x
Masker kain 5B = - Lsn x
Face Shield - set x
Kaca mata Besafe Putih - unit x
Ear Plug - bh x
Sarung Tangan Karet - psg x
Kedok Las 2.00 set x
Appron 2.00 psg x
Sarung Tangan Las 3.00 psg x
Jas Hujan - psg x
General Safety Sign dll - lot x
43.0 Sarana Pelindung Kerja ketinggian :
Body harnes double Hoke = - unit x
Body harnes double Hoke + Absorber 6.00 unit x
Helm u/ kerja ketinggian - unit x
Safety Sign bahaya ketinggian - lot
44.0 Pagar Perlindungan Pekerjaan :
Baricade Line = 10.00 Roll x
Rubber Cone - unit x
Railing Pengaman - lot x
Safety Sign - ls x
45.0 Pelindung Bangunan :
Jaring pengaman + Rangka = - lot x
46.0 General Check Up utk Pekerja = - org x
47.0 Sarana P3K
Obat obatan luka luar = - Bln x
Tandu P3K Lipat dua - unit x
Kotak obat + perlengkapan - unit x
First Aid Bed - unit x
48.0 Asuransi Personal Accident (JAMSOSTEK) = 2.00 % - Org x
49.0 Alat Komunikasi Lapangan
HT + Batt Charge - set x
7 DRAWING
50.0 Shop drawing/Lichdruck = 1.00 Jt x 2.00 Bln x
51.0 Asbuilt drawing = 1.00 Ls x
6 MAINTENANCE PROYEK
52.0 Pembersihan :
- Rutin = - Org x 2.00 Bln x
- Akhir (Cleaning service) = M2 x
53.0 Buang sampah / puing = 2.00 Rit x 2.00 bln x
54.0 Cerobong sampah = Lot x 5.00 M' x
55.0 Kotak sampah = - - Bh x
56.0 Ramp cuci kendaraan = - Ls x
57.0 Biaya Perbaikan beton dan lain-lain = m2 x
58.0 Temporary drainase = - m' x
Pompa Air Engine + Hose - unit x
Operational Fuel - ls x
59.0 Plastic cover Galian = - rol x
60.0 Penempatan PEB = - m2 x
61.0 Proteksi Pekerjaan = - ls x
JUMLAH
FASILITAS KONTRAKTOR KEET
1 Kursi r. rapat plastic = 8.00 Bh x
2 Meja rapat 1.00 Bh x
3 Meja 1 Biro + Kursi = Bh x
4 Meja tulis = 4.00 Bh x
5 Kursi kerja = 4.00 Bh x
6 Rak = 1.00 Bh x
7 Sapatu + helm = Bh x
8 Komputer (biaya penyusutan) ex H/O - 1.00 Bh x
9 Printer (biaya penyusutan) ex H/O 1.00 Bh x
10 Meja komputer 1.00 Bh x
11 Meja tamu = Set x
12 AC (biaya penyusutan) ex H/O 1.00 Unit x
13 White Board = 1.00 Unit x
14 Rak terbuka = Bh x
15 Jas hujan = 5.00 Ls x
JUMLAH
JUMLAH
Harsat Jumlah Ktr Smentara Kont Ktr Sementara MK Gudang dan W/shp Barak / Mess Pekerja
115,000 = 9,200,000
- = -
1,500,000 = -
10,000 = -
1,500 = 168,000
8,000,000 = -
550,000 = 550,000
150,000 = 300,000
- = -
- = -
550,000 - -
6,000,000 = - -
2,000,000 = - -
7,000,000 = - -
1,000,000 = - -
550,000 = - -
6,000,000 = - -
2,000,000 = - -
7,000,000 = - -
1,000,000 = - -
450,000 = - -
75,000 = -
8,530,000 = 8,530,000 8,530,000
9,405,000 = - -
350,000 = 5,600,000 5,600,000
350,000 = 4,200,000 4,200,000
350,000 = - -
600,000 = - - -
7,000,000 = - - -
2,000,000 = - - -
7,000,000 = - - -
1,000,000 = - - -
10,000,000 = -
3,000,000 = -
= -
1,500,000 = -
1,000,000 = -
3,000,000 = -
500,000 = - -
10,000,000 = - - -
3,000,000 = -
=
1,500,000 = -
1,000,000 = -
3,000,000 = -
100,000 = -
400,000 = -
300,000 = -
350,000 = - -
2,000,000 = - -
400,000 = -
400,000 = - -
500,000 = 4,000,000
1,000,000 = 1,000,000
2,500,000 = 2,500,000 2,500,000
10,000,000 = -
15,000,000 = -
25,000,000 = -
7,500,000 = -
1,500,000 = -
3,000,000 = 3,000,000
1,500,000 = 4,500,000
= -
3,000,000 = -
1,500,000 = -
500,000 = -
500,000 = -
2,000,000 = -
7,000,000 = -
1,500,000 = -
4,500,000 4,500,000
11,000 = -
3,000,000 = 9,000,000
13,000,000 = -
3,500,000 = -
3,500,000 = -
3,500,000 = -
3,500,000 = -
3,500,000 = -
450,000 = -
2,500,000 = -
2,500,000 = -
200,000 = -
850,000 850,000
400,000 = 400,000
400,000 = 400,000
500,000 = -
85,000 = 340,000
350,000 = 350,000
95,000 = 95,000
29,000 = 580,000
190,000 = 3,800,000
17,000 = 340,000
12,000 = 600,000
6,000 = -
85,000 = -
85,000 = -
8,000 = -
15,000 = -
85,000 = 170,000
200,000 = 400,000
35,000 = 105,000
65,000 = -
2,000,000 = -
650,000 = -
750,000 = 4,500,000
850,000 = -
750,000 = -
85,000 = 850,000
150,000 = -
5,000,000 = -
500,000 = -
2,500,000 = -
50,000 = -
100,000 = -
800,000 = -
1,400,000 = -
1,500,000 = -
4,000,000,000 = -
250,000 = -
2,000,000 = 4,000,000
2,000,000 = 2,000,000
-
2,400,000 = -
750 = -
650,000 = 2,600,000
50,000 = -
100,000 = -
4,500,000 = -
50,000 = -
35,000 = -
2,000,000 = -
5,000,000 = -
450,000 = -
135,000 = -
2,500,000 = -
JUMLAH = 79,428,000
Rata2/Bulan 19,857,000
- 8,530,000 9,800,000 2,500,000
143,788,000
-
500,000.00 500,000 143,788,000
200,000.00 1,600,000
750,000.00 -
650,000.00 -
800,000.00 800,000
120,000.00 480,000
750,000.00 -
500,000.00 -
1,000,000.00 -
1,250,000.00 -
350,000.00 1,400,000
75,000.00 300,000
4,750,000.00 -
1,000,000.00 1,000,000
300,000.00 1,200,000
200,000.00 800,000
4,000,000.00 -
2,500,000.00 -
9,600,000.00 -
200,000.00 200,000
4,000,000.00 -
250,000.00 -
250,000.00 250,000
JUMLAH 8,530,000
85,000.00 680,000
500,000.00 500,000
750,000.00 -
300,000.00 1,200,000
200,000.00 800,000
100,000.00 100,000
200,000.00 -
2,500,000.00 2,500,000
2,500,000.00 2,500,000
100,000.00 100,000
1,500,000.00 -
500,000.00 500,000
150,000.00 150,000
100,000.00 -
75,000.00 375,000
JUMLAH 9,405,000
JUMLAH 18,130,000
Papan Nama Pry Air Bersih & Air Kotor Record Site Level Survey Pagar Sementara SHP Drawing As Build Drawing Temp Saluran
9,200,000
-
550,000
300,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - 850,000 9,200,000 - - -
Jembatan Sementara Jalan Sementara Jamsostek Pekerja Kebersihan Pry Listrik Kerja Alat Komunikasi APD dan Perl. HSE
-
4,000,000
-
-
-
-
4,500,000.00
-
9,000,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
850,000.00
-
400,000.00
95,000.00
580,000.00
3,800,000.00
340,000.00
600,000.00
-
-
-
-
-
170,000.00
400,000.00
105,000.00
-
-
-
-
4,500,000.00
-
-
-
850,000.00
-
-
2,600,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
79,428,000.00
- 690,000 79,428,000 - - -
RABT - ALAT PENUNJANG
PT.CITRA KARSA DINAMIKA
HPC LINE 6
PT. UNILEVER Tbk
PENUNJANG INTERNAL
Waktu Pelaksanaan 4.0 BK 16.00 MK 112.00 HK.
PERLENGKAPAN KERJA
1 Gerobak dorong = - Bh x
2 Gerobak sorong = - Bh x
3 Ember karet = 50.00 Bh x
4 Terpal = 4.00 Rol x
5 Talang cor = - M' x
6 Plastik cor = - rol x
7 Karung = 100.00 BH x
8 Karung Goni = - BH x
9 Bucket TC = - Bh x
10 HT + baterey = - Bh x
11 Railing pengaman (pakai tali) = M' x
12 Tangga Acces = - Ls x
13 Wire rope u/.TC = set x
14 Slang plastik = 50.00 M' x
15 Alat2 bantu finishing = - Ls x
16 Bak curing = Ls x
17 Calbond = - Ls x
18 Ultra cut 16" = 5.00 Bh x
19 Ultra cut 4" = 50.00 Ls x
20 Flap disk = Ls x
21 Ultra flex 4" (Tebal) = Bh x
22 Ultra flex 4" (Tipis) = Bh x
23 Hammer drill = - Bh x
24 Hilti = 1.00 Bh x - Bln x
25 Grinda = Bh x - Bln x
26 Alat2 bantu lainnya = - Ls x
27 Consumable = - Ls x
KENDARAAN
1 Sepeda motor = 1.00 Bh x 3.00 bln x
2 Pick Up = - Bh x 2.00 Bln x
3 Avanza = 1.00 Bh x 1.00 Bln x
4 Service = - Bh x 1.00 Kali x
5 Bahan bakar = 60.00 ltr 3.00 Bln x
6 Biaya Angkut dari Jkt = - kl 3.00 Bln x
7 Biaya tol = 1.00 Bh x 3.00 Bln x
Referensi
Harsat Jumlah Up to date Brand Lokasi Toko/Sup/Vend
1,550,000 = -
425,000 = - 21-Mar-17 KERRY AVIN TEHNIK
7,000 = 350,000 10-Mar-17 CODA AVIN TEHNIK
250,000 = 1,000,000
50,000 = -
145,000 = - 25-Apr-17 CODA CV. PRATAMA BIJAK BERSAMA
2,500 = 250,000 9-Dec-16 CODA Avin Teknik
3,000 = -
4,000,000 = -
900,000 = -
31,667 = -
1,500,000 = -
1,000,000 = -
16,000 = 800,000
3,000,000 = -
1,000,000 = -
1,000,000 = -
72,000 = 360,000 3-Feb-17 CODA TK. SINAR BENUA KARYA
11,000 = 550,000 27-Mar-17 CODA CV. PRATAMA BIJAK BERSAMA
1,000,000 = -
55,000 = -
8,000 = - 7-Apr-17 CODA CV. TRIJAYA MAKMUR
6,500,000 = -
400,000 = -
600,000 = -
5,000,000 = -
5,000,000 = -
500,000.00 = 1,500,000
4,500,000.00 = -
5,000,000.00 = 5,000,000
1,500,000.00 = -
7,800.00 = 1,404,000
2,000,000.00 = -
100,000.00 = 300,000
JUMLAH = 11,514,000
Rata2/Bulan = 2,878,500
Keterangan
. TRIJAYA MAKMUR
RABT - BU.ADM. / PELAKS.
PT.CITRA KARSA DINAMIKA
HPC LINE 6
PT. UNILEVER Tbk
UMUM INTERNAL
Waktu Pelaksanaan 4.0 BK 16.00 MK 112.00 HK.
ADMINISTRASI KANTOR
1 Alat2 tulis/kantor = 2.00 Bln x
2 Photocopy (sewa) = - Bln x
3 Supplies photocopy = 1.00 Bln x
4 Rumah tangga kantor = 1.00 Bln x
5 Dispenser = 1.00 Bh x
6 Aqua = 30.00 Hr x 3.00 Bln x
7 Penagihan + Adm Pajak = - Bln x
8 Komputer + Penyusutan = ls x
9 Konsumsi rapat = - 2.00 Mgg x
10 Ijin-ijin (biaya tdk resmi) = 4.00 - Bln x
11 Photographi = - ls x
ADMIN KARYAWAN/MESS
12 Makan siang = - Or x 1.00 Bln x
13 Makan lembur kerja di hari libur = 3.00 Or x 20.00 time x
14 Telephone Kantor line 1.00 bln x
15 Hand phone( pulsa ) = 3.00 Org x 2.00 Bln x
16 Modem (WIFI Internal) - 1.00 bh x
17 Modem (WIFI Eksternal- Antena) - 1.00 bh x
18 Seragam proyek = - 2.00 set x
19 Transport/konsumsi dir. = - Or x 4.00 Bln x
20 Transportasi dinas = - Or x 30.00 Bln x
21 Mess dan RT mess = - Bln x
22 Rumah sewa u/ staff = 2.00 kmr 3.00 bln x
23 Perabot - org 1.00 Ls x
24 Barak pekerja Harian = 1.00 rumah 3.00 bln
9 ASURANSI
25 Astek BPJS =
0.24% x
0.19% x
0.15% x
0.12% x
0.10% x
9
26 CAR & TPL = - %o x
27 Jaminan Penawaran 0.000 % x
28 Jaminan Pelaksanaan 0.000 % x
29 Jaminan Uang Muka 0.000 % x
30 Jaminan Retensi - % x
11 TEST DAN SAMPEL
31 Test Material = 1.00 ls x
32 Sample material - Ls x
33 Test Besi = 10.00 set x
34 Ritasi beton = 20.00 rit x
KEAMANAN
35 Koordinasi keamanan = 1.00 Bln x
36 Biaya preman = 1.00 Ls x
ENTERTAINT
37 Intertainment relasi Natal = - org x
38 Intertainment relasi Lebaran = - org x
39 Lembur pengawas (Entertaint) = - Bln x
LAIN-LAIN
40 Upacara - Start = 1.00 Bln x
41 - Fnsh = 1.00 - Kl x
42 IMB = - Ls x
43 Angkut material di dalam proyek - bln x
44 Biaya Mobilisasi pekerja dari jawa - org x
Harsat Jumlah Koordinasi Progress Site Management
300,000 - -
15,000 900,000 900,000
1,500,000 - -
200,000 1,200,000 1,200,000
500,000 - -
12,500,000 - -
300,000 - -
1,000,000 - -
500,000 - -
1,000,000 - -
600,000 3,600,000 3,600,000
200,000 - -
4,000,000 12,000,000 12,000,000
2,100,000,000 -
2,100,000,000 -
2,100,000,000 -
2,100,000,000 -
2,100,000,000 -
3,500,000 3,500,000
3,000,000 -
250,000 2,500,000
20,000 400,000
2,500,000 - -
3,000,000 - -
1,500,000 - -
-
-
4,000,000 - -
5,000,000 - -
750,000,000 - -
2,000,000 - -
150,000 - -
3,500,000
RABT PEGAWAI
PT.CITRA KARSA DINAMIKA
HPC LINE 6
PT UNILEVER Tbk
KEAMANAN
18 Security - Org 4.00 Month 3,500,000.00
19 Security Leader - Org 4.00 Month 2,000,000.00
20 Uniform - 1.00 Set 250,000.00
21 Rompi security - 1.00 Pcs 80,000.00
22 Sepatu PDH - 1.00 Psg 200,000.00
23 Gesper - 1.00 Pcs 25,000.00
HARIAN
24 Ass. Gudang - Org 4.00 Month 2,550,000.00
25 Ass. Survey - Org 4.00 Month 2,550,000.00
26 Ass. M/E Alat & Fasc - Org 4.00 Month 2,550,000.00
27 Safety Org 4.00 Month 2,550,000.00
-
5.00 Org
Office Boy 1.00 Org 1 Bln 1,250,000.00
- mobil 2 Bln 1,250,000.00
THR Total Cost (Rp) Remarks Keamanan Lapangan Site anagement
- -
- -
13,000,000.00 13,000,000
22,500,000.00 22,500,000
- -
- -
- -
5,000,000.00 5,000,000
- -
19,500,000.00 19,500,000
- -
- -
- -
- -
9,000,000.00 9,000,000
- -
- -
69,000,000.00
- -
- -
- -
- -
-
ALAT INTERNAL
Item Alat Beli/Sewa Qty Bln/hr Unit
JUMLAH 84,750,000.00
Rata2/Bulan #DIV/0!
HSAT RC UPDATE
CODA BP. RISBANDIONO Total Station Topcon 235 N, Theodolite Topcon DT 205 L, Auto Level Topcon AT B4 , Auto Level Topcon A
KERRY PT. KORENTA LESTARI Excavator Komatsu PC200 (KP 01)
KERRY PT. KORENTA LESTARI Vibro Amman (KV16)
PILE / PANCANG
24 Borpile dia. 1000mm Rp. 511,000 / m'
25 CBR Test Rp. - / titik
26 PDA Test Rp. - / titik
27 Spun pile dia. 350mm Rp. 452,600 / m'
28 Spun pile dia. 400mm Rp. 562,100 / m'
29 Square pile 250x250 Rp. 303,680 / m'
30 Square pile 300x300 Rp. 240,900 / m'
Rp. 214,620 / m'
Jasa Hidrolik Tekan Rp. 51,100 / m'
Handling Rp. 7,300 / m'
Bobok tiang Rp. 51,100 / ttk
Pengelasan Rp. 51,100 / joint
Joint Rp. 584,000 / set
FORM WORK
31 Dinding Rp. 328,500 / m2
32 Slab Rp. 328,500 / m2
33 Kolom Rp. 270,100 / m2
34 Balok Rp. 328,500 / m2
35 Tangga Rp. 328,500 / m2
36 Kepala kolom Rp. 219,000 / pcs
REINFORCEMENT BAR
37 Besi beton U-24 Rp. 14,240 / ton
Rp. 8,610 / kg
Rp. 11,720 / kg
38 Besi beton U-39 Rp. 14,240 / kg
Rp. 8,610 / kg
PAINTING
#REF! Cat Weatershield Rp. 94,900 / kg
#REF! Cat AEP Rp. 37,310 / kg
#REF! Cat Dasar Syntetic Rp. 46,720 / kg
#REF! Cat Finish - Ftalit Rp. 60,710 / kg
#REF! Cat Finish - Nipe Rp. 93,440 / kg
#REF! Cat Enamel Rp. 94,900 / kg
#REF! Cat Epoxy Primer Grey Rp. 93,440 / kg
#REF! Cat Zincromate Rp. 109,500 / ltr
#REF! Cat catylac Rp. 37,960 / kg
#REF! Cat Dulux Interior Rp. 79,210 / kg
#REF! Cat vinilex Rp. 36,500 / kg
#REF! Cat Chiller Rp. 76,650 / kg
#REF! Cat Pentalite Rp. 67,160 / kg
#REF! Cat Mowilex Interior Rp. 71,910 / liter
#REF! Cat Jotun Interior Rp. 89,060 / liter
#REF! Cat Jotun Exterior Rp. 100,740 / liter
#REF! Cat Jotun Enamel Rp. 83,220 / liter
#REF! Cat Jotun Primer Rp. 65,700 / liter
#REF! Dulux thiner Rp. 17,520 / liter
#REF! Hugo Paint Dinding Interior Rp. 62,780 / m2
#REF! Hugo Paint Dinding Exterior Rp. 84,680 / m2
#REF! Hugo Paint Plafond Rp. 62,780 / m2
#REF! Jotun Thiner Rp. 109,500 / liter
#REF! Thinner Rp. 18,250 / ltr
#REF! Tenekote cat Rp. 56,940 / kg
#REF! Alkali sealer Rp. 77,750 / kg
#REF! Cement Filler Rp. 67,890 / kg
#REF! Base Coat Sealer Rp. 51,100 / kg
#REF! Jotashield Primer Rp. 64,240 / kg
#REF! Galvanizing Rp. 9,490 / kg
#REF! Jotun Pearlsilk Rp. 80,300 / kg
EPOXY, FLOOR HARDENER & WATER PROOFING
#REF! Epoxy Mortar Rp. 1,079,130 / m2
#REF! Floor hardener natural Rp. 4,960 / kg
#REF! Curving lantai Rp. 240,900 / m'
Rp. 102,200 / m'
#REF! Urethane Acrylic Solid Rp. 108,040 / kg
#REF! Urethane Hardener Rp. 113,880 / kg
#REF! Waterproofing membrane Rp. 182,500 / m2
#REF! Waterproofing Coating Rp. 69,350 / m2
TILE/CERAMICS, VINYL
#REF! Granit Venus PJ 6121 005 0,60/1,2 MT Rp. 615,030 / m2
#REF! Granit Venus MZ789V 60 x 60 Rp. 525,500 / m2
#REF! Granit Venus FX6603 60 x 60 Rp. 509,540 / m2
#REF! Granit Venus D - 696616 60 x 90 Rp. 883,030 / m2
#REF! Granit Venus PJ 61205 Rp. 615,030 / m2
#REF! Granite Rp. 1,314,000 / m2
#REF! Venus Tile Mosaico Rp. 1,685,230 / m2
#REF! Homogeneous Tile 40x40 ( polished ) Rp. 693,500 / m2
#REF! Homogeneous Tile 40x40 ( unpolished ) Rp. 657,000 / m2
#REF! Homogeneous Tile 60x60 ( polished ) Rp. 716,860 / m2
Rp. 379,600 / m2
#REF! Homogeneous Tile 60x60 ( unpolished ) Rp. 708,100 / m2
Rp. 446,250 / Dus
Rp. 471,970 / m2
#REF! Homogeneous Tile 60x90 ( polished ) Rp. 744,600 / m2
#REF! Homogeneous Tile 60x120 ( polished ) Rp. 876,000 / m2
Rp. 719,050 / m2
Rp. 646,010 / m2
#REF! Keramik Heavy Duty 10x20x2 Rp. 226,010 / m2
#REF! Keramik dinding 20 x 20 Rp. 175,200 / m2
#REF! Keramik dinding 30 x 60 Rp. 144,250 / m2
Rp. 180,890 / m2
#REF! Lantai Keramik 20x20 Rp. 150,670 / m2
#REF! Lantai Keramik 20x40 Rp. 132,280 / Dus
#REF! Lantai Keramik 30x30 Rp. 200,020 / m2
#REF! Lantai Keramik 33x33 Rp. 127,750 / m2
#REF! Lantai Keramik 40x40 Rp. 131,400 / m2
Rp. 137,240 / Dus
#REF! Lantai Keramik 40x20 Rp. 140,890 / m2
#REF! Lantai Keramik 60 x 60 Rp. 196,690 / m2
#REF! Lantai Keramik 60 x 30 Rp. 197,100 / m2
#REF! List kermaik dinding 60x20 Rp. 199,660 / m2
#REF! Nut Keramik Rp. 176,660 / kg
Rp. 18,250 / kg
ROOFING ACCESSORIES
194 Atap 12-14 x 50 HGS Rp. 1,530 / pcs
195 Cladding dan Listplank 12-14 x 20 Rp. 1,750 / pcs
196 Flashing 10-16 x 16 Rp. 1,170 / pcs
197 Insulasi zeltech 05BBR 8mm Rp. 74,610 / m2
#REF! Nok 10-16 x 16 Rp. 880 / pcs
MECHANICAL & ELECTRICAL
PIPA SPRINKLER
#REF! Pipa sprinkler Ø 25 Rp. 93,440 / m'
#REF! Pipa sprinkler Ø 32 Rp. 153,300 / m'
#REF! Pipa sprinkler Ø 40 Rp. 175,200 / m'
#REF! Pipa sprinkler Ø 50 Rp. 204,400 / m'
#REF! Pipa sprinkler Ø 65 Rp. 248,200 / m'
#REF! Pipa sprinkler Ø 80 Rp. 277,400 / m'
#REF! Pipa sprinkler Ø 100 Rp. 343,100 / m'
#REF! Vitaulic Joint Ø 65 Rp. 554,800 / pcs
#REF! Vitaulic Joint Ø 80 Rp. 949,000 / pcs
#REF! Vitaulic Joint Ø 100 Rp. 1,124,200 / pcs
#REF! Gate valve 16KØ 25 Rp. 511,000 / pcs
#REF! Sprinkler head ex viking Rp. 175,200 / pcs
Fire Estinguisher ABC Type 3 kg Rp. 524,660 / pcs
ELECTRICAL
1 Installasi lampu Rp. 135,050 / titik
2 Installasi Penerangan Rp. 270,100 / titik
3 Installasi stop kontak Rp. 299,300 / titik
4 Installasi kabel data Rp. 98,550 / titik
5 Installasi kabel telpon Rp. 98,550 / titik
6 Kable Grounding NYA 4mm Rp. 7,150 / m'
7 Kabel NYAF 10 mm Rp. 25,550 / m'
8 Kabel NYA 1,5 Rp. 2,850 / m'
9 Rp. 11,680 / m'
10 Kabel NYA 1C X 2,5mm2 Rp. 12,710 / m'
11 Kabel NYM 2,5x3 Rp. 15,660 / m'
12 Kabel NYY 4x6 Rp. 50,310 / m'
13 Kabel NYY 3x2.5mm Rp. 16,060 / m'
14 Kabel NYY 5x4 "METAL" Rp. 52,560 / m'
15 Kabel data Cat 6 Rp. 14,470 / m'
16 Rp. 9,690 / m'
17 Kabel NYYHY 3X1,5mm2 Rp. 32,070 / m'
18 Kabel NYM 3x2.5m Rp. 19,130 / m'
19 Kabel NYMHY 3x2,5 Rp. 21,440 / m'
20 Kabel NYM 2 x 1,5 mm Rp. 8,470 / m'
21 Kabel NYY 3 x 50 mm2 4 Besar Rp. 234,530 / m'
22 Kabel NYY 3 x 6 mm2 4 Besar Rp. 44,380 / m'
23 Kabel NYA 1 x 50 mm2 4 Besar Rp. 67,080 / m'
24 Kabel NYY 4 x 2.5MM Rp. 48,980 / m'
25 Kabel NYY 4 x 16 mm2 4 Besar Rp. 105,920 / m'
26 Kabel NYY 4 x 50 mm2 4 Besar Rp. 312,710 / m'
27 Kabel NYY 4 x 6 mm2 4 Besar Rp. 53,610 / m'
28 Kabel NYY 5 x 2,5 mm2 4 Besar Rp. 27,870 / m'
29 Kabel Feeder NYY 8 x 1C x 300 mm2 Rp. 3,878,080 / m'
30 Kabel Feeder NYA 1C x 150 mm2 Rp. 224,350 / m'
31 Kap TKI 1 x 36 Rp. 94,900 / pcs
32 Kabel Tees 30 cm Rp. 51,100 / pcs
33 Kabel Duct 50 x 100 3m Rp. 226,300 / pcs
34 Lampu T5 35 watt Rp. 116,800 / pcs
35 Lampu T5 14 watt Rp. 69,350 / pcs
36 Lampu T5 8 watt Rp. 54,750 / pcs
37 Lampu RM 2 x 36 watt Rp. 562,100 / pcs
38 MCB 1 Phase 10 A ex- Schnider Rp. 73,000 / pcs
39 MCB 3 Phase 16 A ex- Schnider Rp. 357,700 / pcs
40 MCB 3 Phase 63A ex- Schneider Rp. 766,500 / pcs
41 Medium Voltage Distribution Panel (MVDP) Rp. 129,940,000 / unit
42 Mounting Socket 32 A 1 Phase Rp. 722,700 / unit
43 MK Box Inbow Bosch Rp. 6,570 / unit
44 MK Box Outbow Bosch Rp. 14,600 / unit
45 Outlet data Rp. 111,690 / pcs
46 Outlet data cat 5 Rp. 240,900 / pcs
47 Ooulet telpon Rp. 111,690 / pcs
48 Pipa Clipsal 20mm Rp. 15,330 / btg
49 Pindah lampu TL/Downlight Rp. 85,410 / titik
50 Pinil RST Rp. 730 / titik
51 Saklar 3 Tombol Rp. 65,700 / pcs
52 Saklar Hotel Seri Rp. 36,500 / pcs
53 Saklar seri Rp. 81,030 / pcs
54 Saklar Tunggal (Single) Rp. 25,550 / pcs
55 Stop kontak Rp. 81,030 / pcs
56 Stop Kontak Clipsal Rp. 29,200 / pcs
57 Stop Kontak 3 Phase 16 A Rp. 386,900 / btg
58 Saklar Hotel Clipsal Rp. 36,500 / pcs
59 Saklar Hotel Clipsal Rp. 36,500 / pcs
60 Socket Telephone Panasonic Rp. 72,270 / pcs
61 Socket Data Panasonic Rp. 1,083,830 / pcs
62 Skun 10mm Rp. 1,460 / pcs
63 Skun 10mm lurus Rp. 2,190 / pcs
GENERAL /CONSUMABLE
64 Alumunium composite panel Rp. 854,100 / m'
65 Alumunium sheet 0.35mm Rp. 131,400 / m2
66 Angkur Hilty Rp. 1,233,700 / titik
Rp. 11,680 / titik
Rp. 233,600 / titik
Rp. 766,500 / titik
67 Angkur hilti M16x200 Rp. 138,700 / titik
20 Amplas 500 Rp. 657,000 / roll
31 Apron Rp. 124,100 / Psg
68 BC 500 x 500 x 1000 mm HD Rp. 2,847,000 / m'
69 Ball Valve 1/2'' Rp. 189,800 / pcs
Rp. 76,650 / pcs
70 Ball Valve 1'' Rp. 435,080 / pcs
Rp. 328,500 / pcs
Rp. 164,250 / pcs
71 Biofil 2m3 Rp. 15,330,000 / bh
72 Bevel Rp. 43,800 / m'
73 Bingkai dan list kaca cermin Rp. 328,500 / m2
Prepared by,
Sholikan
Marketing
Note
1 Pembayaran tiap 2 minggu setiap hari Sabtu pukul 17.00
2 APD disediakan di Proyek
3 Harga sudah termasuk alat kerja seperti trowel, jidar, ember dan lain lain
4 Ongkos mendatangkan tukang/kenek Rp. 100,000/orang, apabila berkurang jumlahnya maka penggantian men
tanggung jawab mandor
Muhsan/Imam
0821 18975552
082299801781
INDEX 1.46
: ROUNDED (1.00)
: 00
: USD 12,730.00
50,000
75,000
250,000 21-Jan-17 CODA CV. ZANAKI JAYA
225,000 19-Aug-16 CODA CV. ZANAKI JAYA
215,000 23-Jun-16 CODA CV. ZANAKI JAYA
82,500
250,000
255,000 31-Jan-17 CODA ZANAKI JAYA
240,000 20-Mar-17 KERRY KARANG TARUNA
225,000 10-May-16 CODA ZANAKI JAYA
270,000
205,000 20-Mar-17 KERRY KARANG TARUNA
280,000
275,000 17-Feb-17 CODA CV. ZANAKI JAYA
330,000 1-Sep-16 CODA SINAR BENUA KARYA
250,000 22-Dec-16 CODA CV. ZANAKI JAYA
160,000
310,000 6-Dec-16 CODA ZANAKI JAYA
250,000 23-Mar-17 CODA ZANAKI JAYA
250,000 1-Sep-16 CODA ZANAKY JAYA
250,000 16-Jan-17 CODA ZANAKY JAYA
-
25,000 21-Mar-17 Aqua Citererup Rizky Taman Depok
37,500 21-Apr-17 Aqua Subang CV. Nusa Indah
72,500 21-Apr-17 Aqua Subang CV. Nusa Indah
350,000 YURI
310,000
385,000
208,000
165,000 11-Aug-16 CODA PT. BANGUN NAGAMAS
147,000 29-Jun-16 CODA PT. SAETI CONCRETINDO
35,000 23-Aug-16 CODA PT. HIDROLIK PONDASI INDO.
5,000 23-Aug-16 CODA PT. HIDROLIK PONDASI INDO.
35,000 23-Aug-16 CODA PT. HIDROLIK PONDASI INDO.
35,000 23-Aug-16 CODA PT. HIDROLIK PONDASI INDO.
400,000 29-Jun-16 CODA PT. SAETI CONCRETINDO
450
14,400 8-Mar-17 CISANGKAN CODA CISANGKAN
580,000 23-Feb-17 CELCON CODA PT. JAYA CELCON PRIMA
6,126
8,193
13,500
17,900
2,500 3-Aug-16 CODA CV. INTI KREASI MANDIRI J.
1,800 20-Aug-16 CODA TK. SINAR BENUA KARYA
3,000 3-May-16 CODA AVIN TEHNIK
10,500 5-Sep-16 CISANGKAN CODA CISANGKAN
125,000
12,300 5-Aug-16 CISANGKAN CODA CISANGKAN
35,000 13-Feb-17 MULIA CODA CV. PRATAMA BIJAK BERSAMA
68,000 11-Apr-17 CODA TK. SINAR BENUA KARYA
70,000 14-Dec-16 CODA AVIN TEHNIK
63,000 19-Aug-16 CODA PT. TRIMESTA GADING PRATAMA
99,000 11-Apr-17 CODA CV. TRIJAYA MAKMUR
120,000 6-Jun-16 CODA TK. SINAR BENUA KARYA
90,000 23-Feb-17 CODA CV. PRATAMA BIJAK BERSAMA
79,500 15-Aug-16 CODA TK. SINAR BENUA KARYA
65,000 27-Apr-17 CODA CV. PRATAMA BIJAK BERSAMA
40,500 1-Aug-16 CODA PT. SUPRA MANUNGGAL S.
48,000 3-Dec-16 CODA CV. PRATAMA BIJAK BERSAMA
40,500 5-Dec-16 CODA PT. SUPRA MANUNGGAL S.
8-Mar-17 CODA CV. PRATAMA BIJAK BERSAMA
84,500 1-Aug-16 CODA PT. SUPRA MANUNGGAL S.
138,000 15-Aug-16 CODA TK. SINAR BENUA KARYA
138,000 28-Dec-16 CODA CV. PRATAMA BIJAK BERSAMA
90,000 13-Dec-16 CODA CV. PRATAMA BIJAK BERSAMA
275,000 3-Apr-17 CODA CV. PRATAMA BIJAK BERSAMA
5,000 6-Apr-17 CODA CV. PRATAMA BIJAK BERSAMA
1,260,000 16-Aug-16 CODA PT. KARYA NUSANTARA K.
90,000 11-Mar-17 CODA CV. PRATAMA BIJAK BERSAMA
50,000 28-Feb-17 CODA TK. SINAR BENUA KARYA
327,500 6-Dec-16 CODA PT. KARYACIPTA PRISAI S.
70,000
97,500
97,500
142,500
230,000
237,500
35,000
52,500
56,250
5,683,720
810,000 4/2/2015 Jakarta PT. IndoModule Pratama Technology
891,000 4/16/2015 Jababeka PT. SINAR INTI PANEL
585,000 1/24/2015 Jakarta PT. TECHNO PREFAB INDONESIA
1,191,000 4/26/2017 Jakarta PT. Bondor Indonesia
750,000 4/16/2015 Jakarta PT. SINAR INTI PANEL
135,000
170,000
195,000
133,000
30,000
42,350
45,500
65,000 18-Aug-16 UNION CODA PT. ANUGERAH STEEL
48,278
84,656 17-Jul-17 Dea dari kunchoro
52,259 3-Apr-17 CODA PT. ANUGERAH STEEL
65,000
25,556
32,000
41,580
64,000
65,000
64,000
75,000
26,000
54,250
25,000
52,500
46,000
49,250
61,000
69,000
57,000
45,000
12,000
43,000 22-Dec-16 CODA PT. HUGO UNITED GROUP I.
58,000 22-Dec-16 CODA PT. HUGO UNITED GROUP I.
43,000 22-Dec-16 CODA PT. HUGO UNITED GROUP I.
75,000 4-Mar-17 KERRY CV. INTI KREASI MANDIRI J.
12,500
39,000
53,250
46,500
35,000
44,000
6,500 13-Apr-17 Hot Dip Galganis CODA PT. Citra Galvanizing Indonesia
55,000
739,130
3,400 29-Apr-16 CODA PT.DELTA CHEMICON PERKASA
165,000
70,000
74,000
78,000
125,000
47,500
421,250
359,931
349,000
604,815
421,250
900,000
1,154,269 8-Mar-17 CODA PT. VENUS CERAMIKA INT.
475,000
450,000
491,000
260,000
485,000
305,650
323,264
510,000
600,000
492,500
442,475
154,800
120,000
98,800
123,900
103,200
90,600
137,000
87,500
90,000
94,000
96,500
134,722 25-Apr-17 NIRO GRANITE CODA PT. NIRO CERAMIC SALES I.
135,000 5-Apr-17 NIRO GRANITE CODA PT. NIRO CERAMIC SALES I.
136,750
121,000 14-Mar-17 CODA TK. SINAR BENUA KARYA
12,500
36,000
41,000
49,000
7,100
75,000
127,500
6,500
5,000
315,000
8,400
145,000
522,000
170,000
625,000
1,299,779
1,165,000
856,481
1,801,477
55,375,000 13-Dec-16 CODA PT. SENCO PANCA KARYA
69,750
6,900,000 29-Aug-16 LION CODA LION METAL WORKS
7,750,000 29-Aug-16 LION CODA LION METAL WORKS
8,300,000 30-Aug-16 LION CODA LION METAL WORKS
11,000,000 29-Aug-16 LION CODA LION METAL WORKS
9,800,000 29-Aug-16 LION CODA LION METAL WORKS
10,150,000 29-Aug-16 LION CODA LION METAL WORKS
10,150,000 29-Aug-16 LION CODA LION METAL WORKS
13,300,000 29-Aug-16 LION CODA LION METAL WORKS
15,000,000 29-Aug-16 LION CODA LION METAL WORKS
480,000 22-Mar-17 CODA PT. CAHAYA TRITUNGGAL A.
1,950,000 22-Mar-17 CODA PT. CAHAYA TRITUNGGAL A.
275,000
350,000
175,000
250,000
33,500,000
93,600,000
329,175
81,000
450,000
354,167
13,400
335,000
370,000 18-Apr-17 CODA PT. SENCO PANCA KARYA
425,000
550,000
525,000
715,000
695,000
465,210
595,000 21-Apr-17 CODA PT. SENCO PANCA KARYA
105,000
786,667
104,175
2,038,462
1,100,000
1,700,000
1,600,000
150,000
7,500 13-Dec-16 CODA PT. SENCO PANCA KARYA
10,020,000
9,500,000
8,700,000
15,000,000
35,000,000 21-Feb-17 CODA PT. HANACARAKA INDONESIA
16,100,000
18,660,000
190,000
300,000
14,030,000
565,000
639,344
1,050
1,200
800
51,100 13-Sep-16 Zeltech Nestle Kejayan PT. CELLCIUS INDOPERKASA
600
64,000
105,000
120,000
140,000
170,000
190,000
235,000
380,000
650,000
770,000
350,000
120,000
359,354
92,500
185,000
205,000
67,500
67,500
4,900
17,500
1,950
8,000
8,706
10,725
34,459
11,000
36,000
9,910
6,639
21,966
13,100
14,682
5,800
160,636
30,400
45,946
33,550
72,546
214,182
36,720
19,086
2,656,220
153,665
65,000
35,000
155,000
80,000
47,500
37,500
385,000
50,000
245,000
525,000
89,000,000
495,000
4,500
10,000
76,500
165,000
76,500
10,500
58,500
500
45,000
25,000
55,500
17,500
55,500
20,000
265,000
25,000
25,000
49,500
742,350
1,000
1,500
585,000
90,000
845,000
8,000
160,000
525,000
95,000
450,000
85,000
1,950,000
130,000
52,500
298,000
225,000
112,500
10,500,000
30,000
225,000
14,000
65,000
7,800
4,000,000
3,500
36,000
2,000
4,500
10,000
5,500
1,300
5,450
60,654,974
10,000
5,500
45,000
13,000
350,000
190,000
17,000
5,000
7,000
22,850
7,500
400,000
1,600,000
80,650
6,750
300,000
310,100
27,500
29,000
35,000
540,000
85,000
37,500
1,750,000
157,500
204,000
40,000
48,000
2,500
2,500
160,000
35,000
3,000
5,000
7,500
12,000
8,000
168,000
168,000
65,000
10,000
7,000
193,900
40,000
31,000
4,000
24,000
45,000
95,000
25,000
55,000
15,000
1,450 25-Apr-17 CODA CV. PRATAMA BIJAK BERSAMA
1,852,000 28-Dec-16 Wavin CODA PT.METALINDO MULIA P
1,766,000 11-Aug-16 RUCIKA CODA PT.METALINDO MULIA PRATAMA
1,970,000 9-Jan-17 RUCIKA CODA AVIN TEHNIK
260,000 23-Aug-16 RUCIKA CODA TOKO B. K. J.
290,000 9-Jan-17 RUCIKA CODA AVIN TEHNIK
1,159,000 11-Aug-16 RUCIKA CODA PT.METALINDO MULIA PRATAMA
1,500,000 25-Jan-17 RUCIKA CODA CV. PRATAMA BIJAK BERSAMA
195,000 29-Dec-16 RUCIKA CODA AVIN TEHNIK
250,000 25-Jan-17 RUCIKA CODA CV. PRATAMA BIJAK BERSAMA
263,000 1-Aug-16 RUCIKA CODA PT.METALINDO MULIA PRATAMA
506,000
268,500
413,000 30-May-16 RUCIKA CODA PT. PELITA CIKARANG S.
225,000 20-Aug-16 RUCIKA CODA TK. SINAR BENUA KARYA
65,000 16-Aug-16 RUCIKA CODA TK. SINAR BENUA KARYA
50,000 27-Jul-16 RUCIKA CODA PT. PELITA CIKARANG S
267,000 30-May-16 RUCIKA CODA PT. PELITA CIKARANG S.
768,350
78,000 27-Jun-16 WAVIN CODA TK. SINAR BENUA KARYA
136,000 30-May-16 RUCIKA CODA PT. PELITA CIKARANG S.
10,000 27-Jun-16 WAVIN CODA TK. SINAR BENUA KARYA
594,800
466,350
35,000 27-Jul-16 WAVIN CODA PT. PELITA CIKARANG S
250,000
22,500
23,000
52,000
70,500
141,000
13,500
16,100
27,200
34,350
7,000
122,000 10-Aug-16 RUCIKA CODA TK. SINAR BENUA KARYA
8,500 30-May-16 RUCIKA CODA PT. PELITA CIKARANG S.
3,650,000 29-Dec-16 CM CODA AVIN TEHNIK
675,000 29-Dec-16 CM CODA AVIN TEHNIK
341,750
96,000 30-May-16 RUCIKA CODA PT. PELITA CIKARANG S.
297,550
54,000 27-Jun-16 WAVIN CODA TK. SINAR BENUA KARYA
4,000 27-Jun-16 WAVIN CODA TK. SINAR BENUA KARYA
146,950
172,500
25,000
24,500
18,900
-
18,000
138,500
45,000
85,000
17,000
20,000
20,000
3,500
52,500
42,500
48,000 6-Jun-16 CODA TK. SINAR BENUA KARYA
30,000
15,750
5,500
27,500
1,020,000
1,500,000
25,000
5,000 4-Apr-17 CODA NUSANTARA NURAGA
70,000
21,000
25,000
35,000
315,000
180,000
275,000
75,000
187,500
15,000
9,500
120,000
260,000
6,500
8,021
7,000
180,000
295,000
35,000
575,000
675,000
704,000
65,000
65,000
35,000
65,000
20,000
14,000
29,000
31,000
94,000
1,800,000
350,000
155,000
12,500
44,444
RC
95,000 24-Feb-17
105,000 24-Feb-17
105,000 24-Feb-17
120,000 24-Feb-17
120,000 24-Feb-17
120,000 24-Feb-17
130,000 24-Feb-17
150,000 24-Feb-17
95,000 24-Feb-17
95,000 24-Feb-17
Prepared by,
Disetujui Oleh
KETERANGAN Kontak Person
FC (Mpa) 10
Termasuk (Rambu-rambu,cutter, bongkaran,excavator,buangan,pembersihan,bonding, plastik cor, pembesian,bekisting, cor,finishing, grooving,curring com
Termasuk (Rambu-rambu,cutter, bongkaran,excavator,buangan,pembersihan,bonding, plastik cor, pembesian,bekisting, cor,finishing, grooving,curring com
Termasuk (Rambu-rambu,cutter, bongkaran,excavator,buangan,pembersihan,bonding, plastik cor, pembesian,bekisting, cor,finishing, grooving,curring com
Termasuk (Rambu-rambu,cutter, bongkaran,excavator,buangan,pembersihan,bonding, plastik cor, pembesian,bekisting, cor,finishing, grooving,curring com
Termasuk (Rambu-rambu,cutter, bongkaran,excavator,buangan,pembersihan,bonding, plastik cor, pembesian,bekisting, cor,finishing, grooving,curring com
Termasuk (Rambu-rambu,cutter, bongkaran,excavator,buangan,pembersihan,bonding, plastik cor, pembesian,bekisting, cor,finishing, grooving,curring com
Termasuk (Rambu-rambu,cutter, bongkaran,excavator,buangan,pembersihan,bonding, plastik cor, pembesian,bekisting, cor,finishing, grooving,curring com
Zak 50kg (1kubik 44 sak) Agus 081294223538
Zak 50kg (1kubik 44 sak) Agus 081294223538
Zak 50kg (1kubik 43 sak@50kg) Agus 081294223538
Packing : 20 kg / paper bag = 550000/zak
560.000/m3
Watafoil 150 mm (Material +jasa)
(Lubang 4) uk. 39 x 19 x 19
uk. 590 x 190 x 125 / uk. 60 x 20 x 15 cm
uk. 40 X 20 X19
Roster R - 08 uk. 39 x 19 x 9
Glass Block Quadra ex. Mulia
Semen PC 50 kg Tiga roda
Semen PC Tiga Roda 50 kg
Semen PC 50 kg Tiga roda
Semen Putih @ 40 kg Tiga Roda
Semen Putih @ 40 kg Tiga Roda
40 kg/zak, ALC 10mm 10m2, ALC 7,5mm 16m2
Semen MU 301 @ 50 kg
40 kg/zak, (pasangan bata : Bata Merah : ± 1,25 m² / sak 40 kg / tebal aplikasi 10 mm, Bata Ringan : ± 3,5 m² / sak 40 kg / tebal aplikasi 10 mm), (plestera
40 kg
50 kg
40 kg
40 kg/zak,Tebal 1,5mm daya sebar 20m2
Semen MU 202 @ 40 kg
Semen MU 400 @25 kg (R.O)
Semen MU 830 @ 40 kg
Sika Grouting 215 @25KG
50 kg/zak
ma Technology
B INDONESIA
Plate Bordes t. 3,2 mm Full
PERLEMBAR 11.34M2
Tiang BRC T.190-240cm dia 2" (include topi, u clip, dan mur baut) 178.500/btg
uk. 50 x 400 x 2400 mm = 135.750/pcs
Kolom Tengah 100 x 200 x 3500 mm = 349.500/pcs
Kolom Sudut 200 x 200 x 3500 mm = 465.750/pcs
Lebar 50cm
1.125.000/1.2m/btg (Beton K-350)
2.408.000/1.2m/btg (Beton K-350)
507.000/2.5m/btg (Beton K-350)
650.000/2.5m/btg (Beton K-350)
919.000/2.5m/btg (Beton K-350)
255.000/1.25m/btg (Beton K-350)
371.000/1.25m/btg (Beton K-350)
541.000/1.25m/btg (Beton K-350)
Beton tanpa tulang
Beton tanpa tulang
Beton tanpa tulang
Beton tanpa tulang
Beton tanpa tulang
Beton tanpa tulang
Beton tanpa tulang
Forge-welded (Electro-mechanical welding)
Beton tanpa tulang/Saluran 1/2 lingkaran
Beton tanpa tulang/Saluran 1/2 lingkaran
Beton tanpa tulang/Saluran 1/2 lingkaran
70.000/dus
Kawat Bendrat @ 25 kg
Barbed Wire / Kawat Duri , Bentuk Lingkaran
Kayu 5 x 10 L. 4 m Lurus
Kayu 8 x 12 L. 4 m Lurus
Meranti
Meranti
uk. 1000 x 2200 mm (Frame & Leaf, lockset, door closer, hinges))
uk. 1000 x 2200 mm (Frame & Leaf, lockset, door closer, hinges))
uk. 1000 x 2200 mm (Frame & Leaf, lockset, door closer, hinges)
uk. 2000 x 2200 mm (Frame & Leaf, lockset, door closer, flush bolt, hinges)
uk. 1500 x 2200 mm (Frame & Leaf, lockset, door closer, flush bolt, hinges)
uk. 1500 x 2200 mm (Frame & Leaf, lockset, door closer, flush bolt, hinges)
uk. 2000 x 2200 mm (Frame & Leaf, lockset, door closer, flush bolt, hinges)
uk. 2000 x 2200 mm ( (Frame & Leaf, lockset, door closer, flush bolt, hinges)
uk. 2000 x 2200 mm ( (Frame & Leaf, lockset, door closer, flush bolt, hinges)
Slat 1 mm (Material Aluminium), Dengan Penggerak Motor, East Tone Type 40A
850.000/hari = 130rb/jam
Include UM Operator
Include UM Operator
(Total Station Topcon 235 N+Theodolite Topcon DT 205 L+Auto Level Topcon AT B4 )
(Total Station Topcon 235 N+Auto Level Topcon AT B4 )
Dozer D 65
Compressor PDS 175
ekisting, cor,finishing, grooving,curring compund).
ekisting, cor,finishing, grooving,curring compund).
ekisting, cor,finishing, grooving,curring compund).
ekisting, cor,finishing, grooving,curring compund).
ekisting, cor,finishing, grooving,curring compund).
ekisting, cor,finishing, grooving,curring compund).
ekisting, cor,finishing, grooving,curring compund).
sak 40 kg / tebal aplikasi 10 mm), (plesteran Bata Merah : ± 1,9 m² / sak 40 kg / tebal aplikasi 10 mm,Bata Ringan : ± 2,1 m² / sak 40 kg / tebal aplikasi 10 mm)
masuk pemasangan (Asumsi pemasangan 115.000)
angan (asumsi pemasangan 115.000)
ebal aplikasi 10 mm)
ANALISA HARGA SATUAN
PT.CITRA KARSA DINAMIKA -
HPC LINE 6 -
PT. UNILEVER Tbk -
NO URAIAN PEKERJAAN
10 1 m3 Basecoarse
Basecourse B
Pekerja
Pemadatan
12 1 m3 Limestone
Limestone
Pekerja
Pemadatan
14 1 m3 Urug sirtu
Sirtu
Pekerja
Pemadatan
16 1 m3 Urug Gravel
Gravel
Pekerja
Pemadatan
17 Polyethilene sheet
To under Pile Cap, Ground Beam and Ground Slab
18 Termite control
To under Pile Cap, Ground Beam and Ground Slab
19 Soil test
PILLING
24 1 m1 Straus pile dia 30cm
Galian Straus
Beton str K400
Besi
28 PDA Test
Test PDA taing pancang
DEMOLISH
29 Bongkaran 1 m2 Dinding Bata (tebal 15cm)
Bongkar dinding
Pekerja
Mandor
Alat bantu
35 Bongkar ruangan ( incl plafond, dinding, pintu jendela, instalasi ME & lampu)
Bongkar dinding
Bongkar plafon
Bongkar Pintu Jendela
Bongkar Instalasi M/E
Bongkar Beton Kolom
FORMWORX
38 Bekisting bataco /Pasangan bataco pondasi per m2
Bataco
PC
Pasir pasang
Upah
44 Bekisting Tangga/Listplank
Multipleks 12 mm
Balok Kayu borneo
Paku
Mould Oil
Alat bantu
Upah
45 Bekisting Ramp
Multipleks 12 mm
Balok Kayu borneo
Paku
Mould Oil
Alat bantu
Upah
REINFORCEMENT BAR
46 1 kg Besi Beton U-24
Besi beton U-24
Kawat beton
Peralatan bantu, specer, dll
Upah pasang
50 1 m3 Lantai kerja
PC
Pasir pasang
Split 1/2
Alat bantu
Upah
53 1 m3 Beton K-125
Beton K-125
Upah gelar
Alat bantu
54 1 m3 Beton K-175
Beton K-175
Upah gelar
Alat bantu
55 1 m3 Beton K-225
Beton K-225
Upah gelar
Alat bantu
56 1 m3 Beton K-250
Beton K-250
Upah gelar
Alat bantu
57 1 m3 Beton K-350
Beton K-350
Upah gelar
Alat bantu
60 1 m3 Beton K-500
Beton K-500
Upah gelar
Alat bantu
60 1 m3 Beton K-300
Beton K-300
Upah gelar
Alat bantu
62 1 m3 Beton K-400
Beton K-400
Upah gelar
Alat bantu
34 Beton Kolom
Beton K-225
Bekisting
Besi
Alat/material bantu
MASONRY
39 Pasangan 1/2 bata 1PC:3PS
Batu bata
PC
Pasir pasang
Upah
47 1m' Benangan
PC
Pasir pasang
upah
48 1 m2 Acian
PC
Alat bantu
Upah
50 1 m2 Partisi GRC
GRC teb. 10 mm
Frame
Rangka Metal stud
Upah pasang
61 1 m2 Plafon Gypsum 9 mm
Gypsum teb. 9 mm
Frame
Rangka Hollow
Upah pasang
62 1 m2 Plafon GRC 6 mm
Calsium silicat teb. 6 mm
Frame
Rangka Hollow
Upah pasang
63 1 m2 Plafon Gyptile
Gypsum teb. 9 mm
Frame
Rangka Hollow
Upah pasang
64 1 m2 Plafon Calsiboard 9 mm
Calsium silicat teb. 9 mm
Frame
Rangka Hollow
Upah pasang
65 1 m2 Plafon Calsiboard 3 mm
Calsium silicat teb. 3 mm
Frame
Rangka Hollow
Upah pasang
66 1 m2 Plafon Calsiboard 6 mm
Calsium silicat teb. 9 mm
Frame
Rangka Hollow
Upah pasang
65 1 m2 Plafon Calsiboard 9 mm
Bongkar Ceiling
Calsium silicat teb. 9 mm
Frame
Rangka Hollow
Upah pasang
66 Accoustic Ceilling ex. Amstrong TEX T. 150 (T. BAR) uk: 60x60cm
Bongkar Ceiling
Material
Jasa
67 1 m2 Plafon Multiplek
Multipleks 18 mm
Rangka
Upah pasang
68 Accoustic Ceilling ex. Amstrong TEX T. 150 (T. BAR)
Material
Jasa
ACP Tebal 3 mm ex. SEVEN
STEEL STRUCTURE
72 1 kg Besi Baja Profil WF<150
Baja Profil WF<150
Pengecatan
Upah Fabrikasi+Install
Alat bantu
78 1 kg Pipa Baja
Pipa baja
Sanblasting
Upah Fabrikasi+Install
Alat bantu
79 1 kg wind bracing/trekstang
Besi beton U-39
Sanblasting
Upah Fabrikasi+Install
Alat bantu
80 1 kg Plat Baja
Plat baja
Sanblasting
Upah Fabrikasi+Install
Alat bantu
87 1 m2 wire mesh M6
Wire Mesh M6
Kawat beton
Peralatan bantu, specer, cakar ayam dll
Upah pasang
87 1 m2 wire mesh M7
Wire Mesh M7
Kawat beton
Peralatan bantu, specer, cakar ayam dll
Upah pasang
88 1 m2 wire mesh M8
Wire Mesh M8
Kawat beton
Peralatan bantu, specer, cakar ayam dll
Upah pasang
91 Repair Talang
Pasang Talang
Bongkar Talang
Alat Bantu
101 Pekerjaan Atap Metal IMW Klip 700 zincalum 0.5 tct
IMW Klip 700 zincalum 0.5 tct
Material bantu
Alat Bantu
Upah pasang
102 Pekerjaan sky light Atap Metal FRP Type IMW 700 tebal 2mm
IMW 1000 zincalum 0.35 tct
Material bantu
Alat Bantu
Upah pasang
103 Pekerjaan sky light Atap Metal FRP Type IMW 1000 tebal 2mm
IMW 1000 zincalum 0.35 tct
Material bantu
Alat Bantu
Upah pasang
109 Pekerjaan Atap Metal Trimdek Optima Zincalume (0,40 BMT) 0,45 TCT W = 1015 mm
Trimdek Optima Zincalume (0,40 BMT)
Material bantu
Alat Bantu
Upah pasang
110 Pekerjaan Atap Metal Lysaght Trimdek Optima 0,45 TCT ZA L. Eff = 1.015 m
Lysaght Trimdek Optima 0,45 TCT
Material bantu
Alat Bantu
Upah pasang
108 Pekerjaan Atap Metal Lysaght Trimdek Optima 0,45 TCT CB L. Eff = 1,015 m
Lysaght Trimdek Optima 0,45 TCT AZ-150 G-550 Colorbond Sonata Blue
Material bantu
Alat Bantu
Upah pasang
109 Pekerjaan Plafond Spandek Lysaght t. 0,45 mm tct AZ-150 G-550 Zincalume L. Eff. 0,7 m
Spandek Lysaght t. 0,45 mm tct
Material bantu
Alat Bantu
Upah pasang
110 Pekerjaan Atap Metal Klip Lock optima zincalum 0.45 tct M2
Kliplok Optima 0.45 mm W=980 mm
Material bantu
Alat Bantu
Upah pasang
111 Pekerjaan Atap Metal Lysaght Klip Lock :0,45mm BMT 406 M2
AZ-150 G-550
Lysaght Klip Lock :0,45mm
Material bantu
Alat Bantu
Upah pasang
112 Pekerjaan Atap Metal Lysaght Klip Lock :0,5mm tct AZ-150 G-550 Zincalume
Material
Alat Bantu
Upah pasang
113 Pekerjaan Atap Metal Lysaght Klip Lock :0,5mm tct AZ-150 G-550 Angsana Stone
Material
Alat Bantu
Upah pasang
114 Pekerjaan Sky Light Lysaght Klip Lock :0,45mm BMT 406 M2
Material Fiber Everite R74 2400GSM T=1,5mm
Material bantu
Alat Bantu
Upah pasang
120 Pekerjaan Lysaght Flashing 0.40 Tct width = 450 mm (Flashing Top)
Colorbond Hijau Haruan
Material
Upah pasang
152 Dewatering
Material
Alat bantu
Upah Pasang
155 Epoxy Moisture Barrier Sikafloor 81 Epocem ex. SIKA 2mm (full subcont)
Material
Alat bantu
Upah Pasang
158 Epoxy Sikafloor 263, Cream Ral 1001 2mm (full subcont)
Material
Alat bantu
Upah Pasang
159 Epoxy Epoxy Chemical Resistant Sikafloor 62 N (full subcont)
Material
Alat bantu
Upah Pasang
166 Epoxy wall Coating 300 µm MasterTop 1705 BASF (full subcont)
Material
Alat bantu
Upah Pasang
168 Epoxy MasterTop 1140 ex. BASF 100 micron primer (full subcont)
Material
Alat bantu
Upah Pasang
Demolish exiting concrete t. 8cm
Fast Setting Mortar t. 8 cm DC400 ex. Decon
176 Pekerjaan Trowel Finish Ride - On Trowel Mesin non floor hardener
Jasa trowel finish + alat
210 RCP
241 High Speed Metal Door - Rapid Roll 3000 - with Disc Drive Technology (W 2000 mm x H 2500 mm)
Double wall anodized aluminium lamella each H 125 mm x thick. 20 mm with 4 lines
Advance running photocell inside the columns (touchless) = Contactless safety edge
Stationary photocell built into the columns, 280 m above the ground
Emergency hand lever if case of power - failure
3 Phases / PE - 380V, 50 Hz
2 Channel loop detector + 2 pcs push button
MCC vector control new frequency converter, Soft Start - Full Speed - Soft Stop
Open Speed up to : 2,2 m/s at Full Speed - Close Speed 0,70m/s
LCD display + Mainswitch + Open - Stop Close Keypad
Upah Pasang
Interlock
SANITAIR
243 Water closet CW631J/SW631 JP
Toto CW631J/SW631JP
Material bantu
Alat bantu
Upah Pasang
247 Urinal U 57
Toto U 57
Material bantu
Alat bantu
Upah Pasang
1 Faucet T23B13V7NB
Faucet T23B13V7NB
Material bantu
Alat bantu
Upah Pasang
1 Sink SK 508
SK 508
Material bantu
Alat bantu
Upah Pasang
243 Emergency Shower ex. ENWARE Type ECE 270 stainless 304
ENWARE Type ECE 270
Material bantu
Upah Pasang
1 Lavatory
LV529V1
Material bantu
Alat bantu
Upah Pasang
Emergency Door
Emergency Door (1000x2100) by Mesco
Lock Set
- Lock Set Griff 7201.10.F1/2202.00/3301.60 by Mesco
Lock Set
Lockset Panic Bar Corbin PFS 172.01
Door Closer
Dorma TS 83
Door Closer
Dorma TS 73 V
Hanging
Hanging BTS 65
Hanging
Hanging BTS 84
Pemadatan
Pekerjaan Pemadatan
Alat bantu
Upah
Cubicle Toilet
Partisi (1000+1700) x 2000
Partisi (1000) x 2000
Mob & Demob
Alat bantu
Material Bantu
Cubicle Toilet
Partisi (1100+1700) x 2000
Partisi (1100) x 2000
Mob & Demob
Alat bantu
Material Bantu
Cubicle Toilet
Partisi (1038+1000) x 2000
Partisi (1038) x 2000
Mob & Demob
Alat bantu
Material Bantu
Cubicle Toilet
Partisi (1050+1000) x 2000
Partisi (1050) x 2000
Mob & Demob
Alat bantu
Material Bantu
Cubicle Toilet
Partisi (992+1700) x 2000
Partisi (992) x 2000
Mob & Demob
Alat bantu
Material Bantu
Cubicle Toilet
Partisi (925+1700) x 2000
Mob & Demob
Alat bantu
Material Bantu
Door (Mesco)
Sliding door Type SLD2 -
2560mm W x 3500mm H
pemasangan
Pengiriman
Sectional Door
Sectional door Type RD2 -
2500mm W x 3500mm H
emergency release from
outside
Compound glazing window
pemasangan
Pengiriman
Ashford
Material & upah
Mob Demob
alat bantu
Dock Leveler
Hormann (2000x20000x535)
Installation
Rubber Bumper
DB-15 (250x500x100)
Uditch 300x300
Galian
pasir padat
Uditch 300x300 inticon
Alat bantu
Alat bantu
Alat bantu
Foundation 180 x 80 x 80
Bekisting
Tulangan
Beton K-300
Slab Floor t = 20 cm
Bekisting
Wiremesh M8 double layer
Beton K-300
Column 35/35
Bekisting
Tulangan
Beton K-300
Column 25/25
Bekisting
Tulangan
Beton K-300
Beam 17/20
Bekisting
Tulangan
Beton K-300
Beam 25/40
Bekisting
Tulangan
Beton K-300
DRAINAGE
Galian
Pasir urug
Bekisting
Tulangan
Beton K-300
Biotank cap.5m3 blowing system + complete piping set pipa PVC 4" aw (install)
BFH-35B ( 5 m3 / kapasitas 35 orang )
Pengiriman
Instalasi
Pekerjaan Galian
Galian
Urugan
Buang tanah
Pasir urug t =100 mm
Lantai kerja t = 50mm
Pekerjaan Beton
Lantai K-300 t = 200
Wiremesh M8 double
Bekisting
Dinding bata
plester & acian
Urugan pasir dalam
Pemadatan
Pipa PVC AW 4" Asumsi 10 m'
Soil Backfilling
Ground floor slabs substructure will be 300 mm imported compacted gravel grain size of #0… 32 mm on well compacted and
Gravel t = 0,3
sand filling t = 0,05
Bak Kontrol
Galian + Buang
Pasir urug t = 100 mm
Lantai kerja t = 50 mm
dinding bata merah
Plester dan acian
Cover
- Beton K-225
- Tulangan
- Bekisting
- Handle
USD
HRG. SAT. JUMLAH
SAT VOLUME HARGA RC
Rp. Rp.
titik 1.0000 - - -
Jumlah 18,261,680
Dibulatkan 18,261,680
Jumlah 26,396,800
Dibulatkan 26,396,800
m2
m2 1.0500 170,320 178,836 116,660
m2 1.0000 17,520 17,520 12,000
m2 1.0500 175,200 183,960 120,000
Jumlah 380,316
Dibulatkan 380,320
m2 1.0000 - - -
m2 1.0300 131,400 135,342 90,000
zak 0.2500 99,280 24,820
m3 0.0750 365,000 27,375
kg 0.2000 7,300 1,460
m2 1.0000 36,500 36,500 25,000
Jumlah 225,497
Dibulatkan 225,500
m2 1.0000 - - -
m2 1.0300 113,610 117,018 77,818
zak 0.2500 99,280 24,820
m3 0.0750 365,000 27,375
kg 0.2000 7,300 1,460
m2 1.0000 43,800 43,800 30,000
Jumlah 214,473
Dibulatkan 214,470
unit 1.000
m3 3.330
m3
Hydraulic tekan
handling
20 Maret 2017
66.67
0.0039
100
0.00012821
3,5m2/40kg/10mm
20m2/40kg/1,5mm
8-Dec-16 CODA DRS. H. DHEDY DHAMORY, MM
Lysaght/bluescope
Screw 4000/m2
19-Feb-16 Nestle Kejayan CV. MYCON INDONESIA
an senco 888.000/m2
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
17-Nov-17
Tokped
Tokped
aqua proof 125000/1kg
26-Nov-17 Jakarta PT Centra Binacitra Mandiri
877.000
8,770,000
171,779
26-Oct-92
Bio seven BFH-55 ; 10 m3
Volume Koef P
Galian 27.50 1.10 4.00
Urugan 5.50
Buang tanah 22.00
Pasir urug t =100 mm 1.10 1.10 4.00
Lantai kerja t = 50mm 11.00 1.10 4.00
Pekerjaan Beton
Lantai K-300 t = 200 4.40 1.10 4.00
Wiremesh M8 double 21.00 1.05 4.00
Bekisting 26.46 1.05 4.00
Dinding bata 34.50 1.10 4.00
plester & acian 34.50
Urugan pasir dalam 27.20 1.30 4.00
Pemadatan 11.00 1.10 4.00
Keterangan
Koef dia. Tul kg/m' t dia. Bore
1 0.016 1.577536 0
1 0.013 1.04142025 12 0.3
HAMORY, MM
HAMORY, MM
HAMORY, MM
HAMORY, MM
HAMORY, MM
HAMORY, MM
HAMORY, MM
DOPERKASA
86.500/m' W=700
114.495/m' W= 760
AH SEJAHTERA
AH SEJAHTERA
AH SEJAHTERA
AH SEJAHTERA
AH SEJAHTERA
RYA LESTARI
H SEJAHTERA
H SEJAHTERA
H SEJAHTERA
H SEJAHTERA
H SEJAHTERA
H SEJAHTERA
H SEJAHTERA
H SEJAHTERA
H SEJAHTERA
Pemasangan roofing panel luasan 41m2
DOPERKASA
15.000.000 / 834 m2
Include primer, thiner, self leveling
MULTI TEKNIK
UR MITRA S.
UR MITRA S.
UR MITRA S.
MULTI TEKNIK
CHEMCONS
CHEMCONS
CHEMCONS
CHEMCONS
CHEMCONS
CHEMCONS
N FATMAWATI
N FATMAWATI
N FATMAWATI
Duri , Bentuk Lingkaran
Harsat urug pasir padat
2.50 2.50
2.50 2.50
2.50 0.20
2.50 0.20
2.50 0.20
2.50 2.50
2.50 2.50
2.50
No. Dok. : FM/05-02/MKT
TENDER SUMMARY SHEET
(PRIVATE & CONFIDENTIAL) No. Rev. : 02
Tgl Rev. : 10 Juni 2018
R2
URAIAN
(Ribu Rp.) (%)
Prepared by : Approved by :
Irfan Ferdiansyah
Marketing Marketing Director
0.03
BILL OF QUANTITY
Dear sir/madam,
Thank you for your kind of enquiry. We are pleased to inform you that our quotations are as follow :
TOTAL Rp 1,818,994,081
ROUNDED OFF Rp 1,818,900,000
Thank you for your attention. We are looking forward to receive your order soon and assuring you our
best service remain.
Your faithfully,
Aulia Fadli
BILL OF QUANTITY
I PRIMINARIES
1 Mobilisasi dan Demobilisasi 1.00 ls
2 Safety / APD 1.00 ls
3 Tools 1.00 ls
4 Project Management 1.00 ls
13 Pedestal; P1 350x350x500
- Formwork 11.17 m2
- Reinforcement bar 215.06 kg
- Concrete K-300 0.98 m3
14 Retaining Wall; t=150 mm
- Formwork 220.50 m2
- Wire mesh M8 double 110.25 m2
- Concrete K-300 16.54 m3
15 Column Retaining wall
- Formwork 18.90 m2
- Reinforcement bar 311.85 kg
- Concrete K-300 1.42 m3
16 Foundation Retaining wall; 600x600x300
- Formwork 7.56 m2
- Reinforcement bar 249.48 kg
- Concrete K-300 1.13 m3
17 Ramp (3000x10000) 1.00 ls
18 Column SC1 HB 350x350x12x19 2,163.46 kg
19 Column SC2 HB 250x250x9x14 1,661.89 kg
20 Column SC3 HB 250x250x9x14 635.96 kg
21 Beam WF 200x100x5,5x8 440.00 kg
22 Rafter HC 600 ex WF 400x200x8x13 8,364.56 kg
23 Cremona T 250x125x9x14 2,034.64 kg
24 Purlin CNP 150x65x20x32 2,711.11 kg
25 Fascia frame CNP 100x50x20x2,3 593.98 kg
26 Shagrod Ø12 62.36 kg
27 Wind bracing Ø16 147.73 kg
28 Plate, end plate, etc 1,942.26 kg
29 Painting 20,757.95 kg
30 Aditional Soil 11.70 m3
31 Aditional Limstone 9.10 m3
32 Aditional Base Cose 6.50 m3
33 Aditional Wiremess Doble Layer M 10 26.00 m2
34 Aditional Concrete 6.50 m3
IV ARCHITECTURE WORK
1 Wall work
BILL OF QUANTITY
6 Solid Rubber Bumper DB-15 (W) 250 x (H) 500 x (D) 100mm 2.00 unit
BILL OF QUANTITY
VI LIGHTING SYSTEM
Main Equipment
Lighting (Lumen 100) LED High bay Helios 100 ex Artolite
1 15.00 pcs
2 Emergency lamp + Battery 2x10W ex Artolite 2.00 pcs
3 Exit lamp with battery ex Artolite 1.00 pcs
4 Single Switch 4.00 pcs
Installasi
5 Cable NYM 3x2.5mm c/w Steel conduit standart 22.00 Point
Site Office
Partisi Kipsum 54 m2
Pintu 1 unit
Jendela 2 unit
Celling 9 m2
Elektrikal 1 lot
BILL OF QUANTITY
No Deskripsi Jumlah
II ADITIONAL WORK
1 Demolish Atap Batre Charger 30.00
Demolish Wall 94.50
Demilish Rooling Door 1.00
Demiolish Flour 15.00
Sub Total 1
3 Aditional Soil 11.70
Aditional Limstone 9.10
Aditional Base Cose 6.50
Aditional Wiremess Doble Layer M 10 26.00
Aditional Concrete 6.50
Sub Total 3
SUB TOTAL - ADITIONAL WORK
TOTAL
1.460
- 1.000
47,147,599
Volume Koef Luas P L T
#REF!
Unit Kg/m' Kg/unit