Givens
1.042
γconcrete = 150 pcf
0.083
γwaterproofing = 150 pcf
Deck 0.67 2.97 150.00 0.30 Ballast Retainers 2.25 1.04 150.00 0.35
Haunches 0.00 1.39 150.00 0.00 Waterproofing 0.08 5.22 150.00 0.07
Steel 89.8 13.6 1217.9 169.4 10700.0 Steel 89.8 13.6 1217.9 1140.2 10700.0
Concrete 7.6 31.1 237.1 1996.8 40.6 Concrete 22.9 31.1 711.4 4479.5 121.9
Σ= 97.4 44.7 1455.1 2166.2 10740.6 Σ= 112.7 44.7 1929.3 5619.7 10821.9
C C
ST = -639.3 in3 ST = -913.5 in3
1 167.59 337.18 0.00 2.55 4.68 0.00 7.23 3.82 0.00 6.37 OK -0.30 OK
13.405
3.7025 6 3.7025 7/8 "φ shear studs, n = 2 per row, 4 in height
q m = 20 A s = 12.03 Kips/Stud
Horizontal shear at the point considered shall be computed by these formula: Sr= Vr Q & Sm= Vm Q AREMA 15.5.1.2.j
I I
Where: V r = Max (VLL+I+C) - Min (VLL+I+C) QLL+I+C = Ac dc = 319.98 in3 ILL+I+C = 16441.6 in
4
in3
4
V m = Max (VLL+I+C) + (VDL-SUPER) QDL-SUPER = Ac dc = 123.34 IDL-SUPER = 12906.9 in
nqr , nqm
Spacing, s = Min < 24"
Sr Sm
0 0.00 0.00 0.00 0.00 infinity 43.89 43.89 0.00 0.42 0.42 57.34 24.00 24"
1 0.00 0.00 0.00 0.00 infinity 35.11 35.11 0.00 0.34 0.34 71.68 24.00 24"
2 0.00 0.00 0.00 0.00 infinity 26.34 26.34 0.00 0.25 0.25 95.57 24.00 24"
3 0.00 0.00 0.00 0.00 infinity 17.56 17.56 0.00 0.17 0.17 143.35 24.00 24"
4 0.00 0.00 0.00 0.00 infinity 8.78 8.78 0.00 0.08 0.08 286.71 24.00 24"
5 0.00 0.00 0.00 0.00 infinity 0.00 0.00 0.00 0.00 0.00 infinity 0.00 24"
6 0.00 0.00 0.00 0.00 infinity -8.78 8.78 0.00 0.08 0.08 286.71 24.00 24"
7 0.00 0.00 0.00 0.00 infinity -17.56 17.56 0.00 0.17 0.17 143.35 24.00 24"
8 0.00 0.00 0.00 0.00 infinity -26.34 26.34 0.00 0.25 0.25 95.57 24.00 24"
9 0.00 0.00 0.00 0.00 infinity -35.11 35.11 0.00 0.34 0.34 71.68 24.00 24"
10 0.00 0.00 0.00 0.00 infinity -43.89 43.89 0.00 0.42 0.42 57.34 24.00 24"
Page of
Made by
Date 03/01/15
Subject: Chckd by
Filename: Date
Givens
10.357 CG Girders 10.268 1.042
γconcrete = 150 pcf
8.5 0.083
γwaterproofing = 150 pcf
CL Track
1.250
γballast = 120 pcf
2.25
Track Weight = 0.20 k/ft
Waterproofing 0.08 14.73 150.00 0.18 2 -1.75 -35.00 1.41 1.74 40.11 461.23
Ballast 2.17 14.73 120.00 3.83 3 1.75 35.00 1.44 1.77 40.77 468.89
46.000 1661.32 1759.80 1281.48 1326.19 165.58 101.60 115.24 46.67 65.16 241.30
Σ= 3519.60
For lateral distribution of live load, the axle load is distributed uniformly over a width equal to the tie length plus 2 * the minimum distance from bottom
of tie to top of steel. (AREMA 1.3.4.2.4.b.) 11.333 ft > 10.500 ft, i.e. all 4 girders carry the live load.
Girder Fe MLL VLL RE I MLL+I VLL+I Eccentricity Modification Factor, Fe = 1 + n* eLL > 1
k-ft kips k-ft kips S
2
Impact Factor, I = 0.9 RE + 40 - 3*L %
1 1.113 979.66 92.18 8.6% 40.1% 1372.94 129.18 1600
2 1.038 913.15 85.92 2.9% 35.0% 1232.76 115.99 RE = 20% of wheel load = MRE * 100%
S
3 1.000 879.90 82.79 2.9% 35.0% 1187.87 111.77
CENTRIFUGAL FORCE
10.53 % Superelevation, E = 3 in
6
Radius of curve, R = 800 ft
o
2.667 10.927 Degree of curve, D = 7.16
1 -9.86 -96.62 -9.09 1 453.56 1372.94 -96.62 1729.88 39.44 129.18 -9.09 159.53
2 -3.29 -30.02 -2.82 2 461.23 1232.76 -30.02 1663.97 40.11 115.99 -2.82 153.28
3 3.29 28.93 2.72 3 468.89 1187.87 28.93 1685.69 40.77 111.77 2.72 155.26
4 9.86 86.78 8.17 4 476.55 1233.12 86.78 1796.46 41.44 116.03 8.17 165.63
Steel 89.8 13.6 1217.9 633.5 10700.0 Steel 89.8 13.6 1217.9 3360.7 10700.0
Concrete 16.0 31.1 498.0 3555.3 85.3 Concrete 48.0 31.1 1494.0 6287.4 256.0
Σ= 105.8 44.7 1715.9 4188.7 10785.3 Σ= 137.8 44.7 2711.9 9648.1 10956.0
STC = -792.0 in
3 STC = -1334.0 in3
1 183.45 270.11 1276.32 2.79 3.51 14.63 20.93 2.36 5.53 10.69 OK -1.84 OK
2 185.43 275.79 1202.74 2.82 3.58 13.79 20.19 2.41 5.22 10.45 OK -1.74 OK
3 187.42 281.47 1216.80 2.85 3.66 13.95 20.46 2.46 5.28 10.59 OK -1.77 OK
4 189.40 287.15 1319.90 2.88 3.73 15.13 21.74 2.51 5.72 11.11 OK -1.90 OK
Page of
Made by
Date 03/01/15
Subject: Chckd by
Filename: Date
S S
Girder MSR = MLL+I+C fB SR FSR fB SR<FSR Stress Category : Plain: All Bolted A
k-ft ksi ksi
Number of Stress Cycles : For L < 100 ft, N > 2000000
1 1138.67 13.05 24.00 OK
Mean Impact Load, Im : For L > 30 ft = 0.65*I
2 1090.88 12.50 24.00 OK
Allowable Stress Range, FSR : For N & Category = 24 ksi
3 1109.01 12.71 24.00 OK
LIVE LOAD DEFLECTION : SIMPLE BEAM -- ONE CONCENTRATED LOAD AT ANY POINT (USE PRINCIPLE OF SUPERPOSITION):
P P P P
x 2 2 2
∆x = P b x (L - b - x ) For x < a
1 2 3 4
6E I L
372 = a4 180 = b4
312 = a3 240 = b3 ∆x = P a (L-x) (L2 - a2 - (L-x)2) . For x > a
240 = a2 312 = b2 6E I L
180 = a1 372 = b1
PLL = 25 kips
x x ∆x1 ∆x2 ∆x3 ∆x4 ∆x TOTAL ∆ALLOW OK?
ft in in in in in in in in Controlling Girder # 4
4.6 55.2 0.06521 0.06844 0.06289 0.05204 0.24857 0.86250 OK Impact = 40.14 %
9.2 110.4 0.12312 0.13076 0.12106 0.10054 0.47548 0.86250 OK Centrifugal = 9.86 %
13.8 165.6 0.16642 0.18082 0.16982 0.14197 0.65904 0.86250 OK PLL+I+C = 38.49 kips
18.4 220.8 0.18855 0.21252 0.20444 0.17281 0.77832 0.86250 OK E= 29000 ksi
32.2 386.4 0.14197 0.16982 0.18082 0.16642 0.65904 0.86250 OK ∆allowable = L/640 = 0.863 in
0 1 2 3 4 5 6 7 8 9 10
Max Shear (LL+I+C) : 127.15 111.09 95.70 80.31 64.91 49.52 34.13 20.75 10.87 3.68 0.00
Min Shear (LL+I+C) : 0.00 -3.85 -11.21 -21.25 -34.80 -50.19 -65.58 -80.97 -96.37 -111.76 -127.15
Shear Range, Vr = 127.15 114.94 106.91 101.56 99.71 99.71 99.71 101.72 107.24 115.44 127.15
13.405
1.7025 5 5 1.7025 7/8 "φ shear studs, n = 3 per row, 4 in height
q m = 20 A s = 12.03 Kips/Stud
Horizontal shear at the point considered shall be computed by these formula: Sr= Vr Q & Sm= Vm Q AREMA 15.5.1.2.j
I I
Where: V r = Max (VLL+I+C) - Min (VLL+I+C) QLL+I+C = Ac dc = 549.36 in3 ILL+I+C = 20604.1 in
4
nqr , nqm
Spacing, s = Min < 24"
Sr Sm
0 127.15 0.00 127.15 3.39 5.32 24.97 152.12 3.39 0.40 3.79 9.52 5.32 5"
1 111.09 -3.85 114.94 3.06 5.89 19.98 131.07 2.96 0.32 3.28 11.00 5.89 5"
2 95.70 -11.21 106.91 2.85 6.33 14.98 110.68 2.55 0.24 2.79 12.93 6.33 6"
3 80.31 -21.25 101.56 2.71 6.66 9.99 90.30 2.14 0.16 2.30 15.68 6.66 6"
4 64.91 -34.80 99.71 2.66 6.79 4.99 69.90 1.73 0.08 1.81 19.93 6.79 6"
5 49.52 -50.19 99.71 2.66 6.79 0.00 49.52 1.32 0.00 1.32 27.33 6.79 6"
6 34.13 -65.58 99.71 2.66 6.79 4.99 60.59 1.75 0.08 1.83 19.74 6.79 6"
7 20.75 -80.97 101.72 2.71 6.65 9.99 70.98 2.16 0.16 2.32 15.57 6.65 6"
8 10.87 -96.37 107.24 2.86 6.31 14.98 81.39 2.57 0.24 2.81 12.85 6.31 6"
9 3.68 -111.76 115.44 3.08 5.86 19.98 91.78 2.98 0.32 3.30 10.94 5.86 5"
10 0.00 -127.15 127.15 3.39 5.32 24.97 102.18 3.39 0.40 3.79 9.52 5.32 5"