Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
Rly Bridge 42
PSC 11
Box 2
1 SCR Con 0 5x24.0 CAO/C/RC/655 6.6 MBG Cast in-situ 01-01-2002
2 SCR Con 4.5 5x24.0 CAO/C/RC/906 6.818 MBG Cast in-situ 01-01-2002
Girder 8
1 SWR Con 1x24.40 33-11 6.4 DFC Precast 11-02-2014
2 SWR Con 0 1x24.40 34-11 5 25T Precast 11-02-2014
3 SCR Con 8.638 1x18.3 CAO/C/D/RC/568 6 MBG Cast in-situ 01-01-2004
4 SCR Con 5 2x18.3 CAO/C/RC/44 5.83 MBG Precast 01-01-2002
5 SCR con 0 1X17.80, 3X18.30, (i) CAO/C/D/RC/317-321- 12.6 25t Precast 12-11-2014
1X17.80 2012 -
6 SCR con 0 2X13.60 (i) CAO/C/D/PSC/200-203 5.7 25t Precast 12-07-2014
& 84-2012
7 SCR Con 45 4x12.2 CAO/C/D/RC/364 5.7 MBG Cast in-situ 01-01-2005
8 SCR con 0 2X12.20 CAO/C/D/PSC/501,503,5 5.7 DFC PreCast 11-12-2014
04,505 & 82-2011
Slab 1
1 SWR Con 0 3x7.5 356-13 4.8 25T Precast 13-11-2014
RCC 29
Box 15
1 RVNL ABR 0 12.2 CBE/NWR/No.71/SZA- 8.13 25T Cast in Situ 01-02-2012
KRJD/2013
2 RVNL ABR 0 2X12.2 CBE/NWR/No.84/SZA- 6 25T Cast in Situ 01-02-2012
KRJD/2013
3 RVNL ABR 0 12.2 CBE/NWR/No.70/SZA- 5.8 25T Cast in Situ 01-02-2012
KRJD/2013