Sunteți pe pagina 1din 22

Design and Drawings available on various Railways/units, other than RDSO Drgs

Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
Rly Bridge 42
PSC 11
Box 2
1 SCR Con 0 5x24.0 CAO/C/RC/655 6.6 MBG Cast in-situ 01-01-2002
2 SCR Con 4.5 5x24.0 CAO/C/RC/906 6.818 MBG Cast in-situ 01-01-2002
Girder 8
1 SWR Con 1x24.40 33-11 6.4 DFC Precast 11-02-2014
2 SWR Con 0 1x24.40 34-11 5 25T Precast 11-02-2014
3 SCR Con 8.638 1x18.3 CAO/C/D/RC/568 6 MBG Cast in-situ 01-01-2004
4 SCR Con 5 2x18.3 CAO/C/RC/44 5.83 MBG Precast 01-01-2002
5 SCR con 0 1X17.80, 3X18.30, (i) CAO/C/D/RC/317-321- 12.6 25t Precast 12-11-2014
1X17.80 2012 -
6 SCR con 0 2X13.60 (i) CAO/C/D/PSC/200-203 5.7 25t Precast 12-07-2014
& 84-2012
7 SCR Con 45 4x12.2 CAO/C/D/RC/364 5.7 MBG Cast in-situ 01-01-2005
8 SCR con 0 2X12.20 CAO/C/D/PSC/501,503,5 5.7 DFC PreCast 11-12-2014
04,505 & 82-2011
Slab 1
1 SWR Con 0 3x7.5 356-13 4.8 25T Precast 13-11-2014
RCC 29
Box 15
1 RVNL ABR 0 12.2 CBE/NWR/No.71/SZA- 8.13 25T Cast in Situ 01-02-2012
KRJD/2013
2 RVNL ABR 0 2X12.2 CBE/NWR/No.84/SZA- 6 25T Cast in Situ 01-02-2012
KRJD/2013
3 RVNL ABR 0 12.2 CBE/NWR/No.70/SZA- 5.8 25T Cast in Situ 01-02-2012
KRJD/2013

03 June 2016 Page 1 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
4 RVNL ABR 0 7.6 CBE/NWR/No.38/ABR- 10.33 25T Cast in Situ 01-07-2012
SZA-KRJD/2012
5 RVNL ABR 0 2X6+4X6.5 CBE/NWR/No.40/ABR- 6.04 25T Cast in Situ 01-02-2012
SZA-KRJD/2012
6 RVNL ABR 0 3X6.4 PCE 21764-DRM / 4 D 4.89 25T Cast in Situ 01-05-2012
7 SCR con 0 1X6.10x2.277 CAO/C/D/RC/89-2010 7.2 DFC Cast-in-situ 10-02-2014
8 SCR con 0 1X6.10x3.731 CAO/C/D/RC/87-2010 7.2 DFC Cast-in-situ 10-02-2014
9 SCR con 0 1X6.00x6.60 CAO/C/D/RC/403-2009 42.85 25t Cast-in-situ 10-06-2014
10 SCR con 0 3X4.57x4.67 CAO/C/D/RC/164-2010 1.045 25t Cast-in-situ 10-03-2014
11 SCR con 0 2x2 5.00X5.60 CAO/C/D/RC/88-2010 12.3 DFC Cast-in-situ 10-02-2014
12 SCR con 0 (3.49+3.65+3.49)x3 CAO/C/D/RC/165-2010 6.85 25t Cast-in-situ 10-03-2014
.854
13 SCR con 0 3x3.66 CAO/C/D/RC/92-2010 6.375 25t Cast-in-situ 10-03-2014
14 SCR con 0 3x3.66 CAO/C/D/RC/165-2010 5.775 25t Cast-in-situ 10-05-2014
15 SWR Con 0 3 x 3.6 x 4.28 164-10 10.8 25T Cast-in-situ 10-08-2014
Slab 14
1 SWR Con 0 1x8.4 50-10 4.4 HML Cast-in-situ 10-03-2014
2 SCR OL 0 1x4.22+1x7.10 GM(W)SC/BR/2647/2009 4.5 25T Pre cast 30-04-2010
3 SCR OL 0 2x6.1 GM(W)SC/BR/2640/2009 4.5 25T Cast in situ 01-10-2009
4 SCR con 0 6.1, 2.44, 3.05 CAO/C/D/RC/155-2012 89.8 25t Cast-in-situ 12-05-2014
5 SCR OL 0 3x6.1 GM(W)SC/BR/2477/2008 4.5 25T Pre cast 01-07-2010
6 SCR con 0 1X4.57 CAO/C/D/RC/352-204 25t Cast-in-situ 14-07-2014
7 SCR con 0 1X4.57 CAO/C/D/RC/235-2010 24.362 25t Cast-in-situ 10-03-2014
8 SCR OL 0 2x4.55 GM(W)SC/BR/2601/2010 5.288 25T Cast in situ 01-07-2010
9 SCR con 0 1X3.66 CAO/C/D/RC/247-2013 6.005 25t Cast-in-situ 13-11-2014
10 SCR OL 0 3x3.66 GM(W)SC/BR/2644/2009 4.5 25T Pre cast 01-11-2009
11 SCR con 0 1X3.05 CAO/C/D/RC/219-2013 23.48 25t Cast-in-situ 13-10-2014
12 SCR con 0 3.05 CAO/C/D/RC/315-2012 10.75 25t Cast-in-situ 12-11-2014
03 June 2016 Page 2 of 21
Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
13 SCR OL 0 3x3.05 GM(W)SC/BR/2532/2009 4.5 25T Pre cast 01-01-2009
14 SCR OL 0 1x2 GM(W)SC/BR/2622/2009 5.555 25T Cast in situ 01-10-2009
Steel 2
Girder 1
1 SCR OL 0 6x22.90 GM(W)SC/BR/2450/2008 25T 31-12-2008
OpenWeb 1
1 SWR Con 0 9x37.7 232-13 3.81 25T Fabricated at 13-07-2014
ROB 331
38
Girder 38
1 NR Con 71 62.18+63.72 28.5 IRC
2 NR Con 66.36 55 11.8 IRC
3 NR Con 25 45+38.98 12 IRC
4 NR Con 0 42.7 12 IRC
5 NR Con 3.15 42.35 10.9 IRC
6 NR Con 6 21.75+26+42.25+30 8 IRC
7 NR Con 0 33.25+40.6+36.5 11.2 IRC
8 NR Con 2 40.17 20.2 IRC
9 NR Con 0 40 12 IRC
10 NR Con 7.23 39.95 18.5 IRC
11 NR Con 0 38.46 14 IRC
12 NR Con 0 38 12 IRC
13 NR Con 45 2X37.24+1X19.24 12 IRC
14 NR Con 0 3X37.24 10.5 IRC
15 NR Con 43 37.2+24.99+24.36 20.425 IRC
16 NR Con 35 37 12 IRC
17 NR Con 35 37 12 IRC

03 June 2016 Page 3 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
18 NR Con 0 36.85 17.975 IRC
19 NR Con 29.77 35.6 20.7 IRC
20 NR Con 45 30.4+34.6 13.75 IRC
21 NR Con 45 34.6+30.4 13.75 IRC
22 NR Con 0 2X33.82 20.6 IRC
23 NR Con 23 33.8+25.06 13.2 IRC
24 NR Con 29 32.254 23.9 IRC
25 NR Con 0 31.7+27.6 11.8 IRC
26 NR Con 45 31.6+19.7 12 IRC
27 NR Con 0 31.64 12.25 IRC
28 NR Con 30 31.24 23.9 IRC
29 NR Con 32.15 31 31 IRC
30 NR Con 29.53 28.86 8.4 IRC
31 NR Con 0 28.8 14 IRC
32 NR Con 38 23+26 12 IRC
33 NR Con 0 25.74 12.25 IRC
34 NR Con 0 22.65 12 IRC
35 NR Con 37.08 21.3 12 IRC
36 NR Con 37.08 21.3 13.788 IRC
37 NR Con 0 3X18.85 10.5 IRC
38 NR Con 5.67 18 12 IRC
1
Girder 1
1 NR Con 0 46 12 IRC
Composite 56
Girder 48

03 June 2016 Page 4 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
1 ER Con 0 48.4 CAO/CON Drg. No. 11.05 IRC Cast-in-situ 01-12-2007 NA
641,642,643, 644-2007,
143-2008, 634-2012
&635-2012
2 SECR OL 64.733 2X45.33+40.540 BR/NGP/BR No- 15 IRC Cast in situ 13-09-2014
100B/OB/2271/2013
3 NCR Con 0 42 NCRHQE(CON)-42 SK-00- 12 IRC 01-04-2014
ST-01 to 03
4 NWR OL 38.55 1x41.25+1x18.6 1022/SHPL/NH-65 /ST / 10.25 IRC Cast in-situ
ROB/ 367 +473.436 /101
5 SWR Con 0 1x40.46 116-13 7.5 IRC cast-in situ 13-03-2014
6 SWR Con 0 2x40.38 265-12 12 IRC cast-in situ 13-02-2014
7 WR OL 20.35 2x25.38+1x40 LC2B 13.8 IRC Precast 01-01-2013 NA
8 SWR Con 0 1x39.42 42-12 12 IRC cast-in situ 12-05-2014
9 NWR Con 58 37.5 3256 to 3260, 3262 8.55 IRC Precast 08-12-2013
10 NWR OL 35 1x34.25+1x37.24 CBE-584 / JP/ROB/ 12 IRC Cast in-situ
2013/Sheet 11/15
11 WR OL 0 2x12+1x36 UJJAIN 3+554 12 IRC Precast 01-01-2013 NA
12 WR OL 0 2x12+1x36 UJJAIN 4+539 12 IRC Precast 01-01-2013 NA
13 NCR Con 45 36 NCRHQE(CON)-36 SK-45- 12 IRC 01-10-2010
ST-01 to 03
14 WR OL 10 1x24+1x36 LC 1A 13.5 IRC Precast 01-01-2013 NA
15 WR OL 30.8 1x36 ROB 1 12 IRC Precast 01-01-2013 NA
16 NWR Con 8 36 3391,3237 to 3244 8.55 IRC Precast 19-07-2013
17 NCR Con 20 36 NCRHQE(CON)-36 SK-20- 12 IRC 01-10-2010
ST-01 to 03
18 NCR Con 0 36 NCRHQE(CON)-36 SK-00- 12 IRC 01-01-2011
ST-01 to 03
19 SECR OL 58.869 2X35.15m+33.806 BR/NGP/BR No- 11.7 IRC Cast in situ 14-01-2014
89A/OB/2376/2014

03 June 2016 Page 5 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
20 NWR OL 35 1x34.25+1x37.24 CBE-584 / JP/ROB/ 12 IRC Cast in-situ
2013/Sheet 11/15
21 NWR Con 49.59 33.437 3247 to 3251 11.9 IRC Precast 29-07-2013
22 NWR OL 35 1x31.28+2x15 CBE-677/ 12.9 IRC Cast in-situ
BKN/ROB/2014/ Sheet
1/29
23 NWR OL 42 1x31.0+1x15.0+1x CBE-659/ BKN/ROB/2014 14.8 IRC Cast in-situ
19.0
24 NCR Con 0 30 NCRHQE(CON)-30 SK-00- 12 IRC 01-01-2011
ST-01 to 03
25 NCR Con 45 30 NCRHQE(CON)-30 SK-45- 12 IRC 01-01-2011
ST-01 to 03
26 WR OL 28 2x18+1x30 LC8B 14 IRC Precast 01-01-2013 NA
27 WR OL 20 1x30 LC209 10.25 IRC Precast 01-01-2013 NA
28 WR OL 19.15 1x30 LC 88B 10.1 IRC Precast 01-01-2013 NA
29 WR OL 43.4 1x30 LC38X 13.8 IRC Precast 01-01-2013 NA
30 WR OL 34.37 2X24+1X30 LC2 19 IRC Precast 01-01-2013 NA
31 NCR Con 20 30 NCRHQE(CON)-30 SK-20- 12 IRC 01-01-2011
ST-01 to 03
32 SWR Con 1x28.25 343-13 11.5 IRC cast-in situ 13-12-2014
33 ER Con 0 26.8 CAO/CON Drg. No. 495- 12 IRC Cast-in-situ 01-09-2008 NA
2008 (sh-1 & sh-2), 11-
2009, 181-2009
34 NCR Con 45 24 NCRHQE(CON)-24 SK-45- 12 IRC 01-01-2011
ST-01 to 03
35 NCR con 0 24 NCRHQE(CON)-24 SK-00- 12 IRC 01-01-2011
ST-01 to 03
36 WR OL 30 2x15.9+1x24 LC29SPL 10.25 IRC Precast 01-01-2013 NA
37 WR OL 10 1x24+1x36 LC 1A 13.5 IRC Precast 01-01-2013 NA

03 June 2016 Page 6 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
38 NCR con 20 24 NCRHQE(CON)-24 SK-20- 12 IRC 01-01-2011
ST-01 to 03
39 WR OL 34.03 1x24 LC 130 X 12 IRC Precast 01-01-2013 NA
40 WR OL 34.37 2X24+1X30 LC2 19 IRC Precast 01-01-2013 NA
41 NWR OL 42 1x31.0+1x15.0+1x CBE-659/ BKN/ROB/2014 14.8 IRC Cast in-situ
19.0
42 NWR OL 38.55 1x41.25+1x18.6 1022/SHPL/NH-65 /ST / 10.25 IRC Cast in-situ
ROB/ 367 +473.436 /101
43 NCR Con 0 18 NCRHQE(CON)-18 SK-00- 12 IRC 01-10-2010
ST-01 to 02
44 WR OL 28 2x18+1x30 LC8B 14 IRC Precast 01-01-2013 NA
45 NCR con 45 18 NCRHQE(CON)-18 SK-45- 12 IRC 01-10-2010
ST-01 to 03
46 NCR Con 20 18 NCRHQE(CON)-18 SK-20- 12 IRC 01-10-2010
ST-01 to 03
47 NWR OL 35 1x31.28+2x15 CBE-677/ 12.9 IRC Cast in-situ
BKN/ROB/2014/ Sheet
1/29
48 NWR OL 42 1x31.0+1x15.0+1x CBE-659/ BKN/ROB/2014 14.8 IRC Cast in-situ
19.0
Slab 8
1 CR OL 45 40.74 BNP/BM/CS/11-15 8.5 IRC Cast in citu 14-03-2014 4.62
2 NWR OL 35 1x36.842+2x9.079 1021/SHPL/NH-65/ST 14.8 IRC Cast in-situ
/ROB/53+556.453/101
3 CR OL 46 31.69 745-02-ST/102, 103 10.35 IRC cast in citu 13-07-2013 2.0 crore
4 CR OL 0 26.6 IRC cast in citu 13-12-2013
5 CR OL 0 24.9 ASC/1209/1&2 16.5 IRC Cast in citu 01-08-2013 3.02
6 CR OL 46 23.765 745-02-ST/106, 10.35 IRC cast in citu 13-07-2013 1.73
107,108,109 crore
7 CR OL 0 9.66 SWI/1741/RO 9.8 IRC Cast In citu 13-03-2013 1.25

03 June 2016 Page 7 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
8 NWR OL 35 1x36.842+2x9.079 1021/SHPL/NH-65/ST 14.8 IRC Cast in-situ
/ROB/53+556.453/101
PSC 184
Box 31
1 SCR Con 0 1x38.5 CAO/C/D/RC/578 10.95 IRC Cast in-situ 01-01-2004
2 SCR con 0 1X36.00 i) CAO/C/D/PSC/171- 12 IRC Pre cast 14-04-2014
174/2014
3 SCR Con 45 2x35.416 CAO/C/D/RC/260 12 IRC Cast in-situ 01-01-2006
4 SCR con 0 2x24.00+1X35.00 (i) CAO/C/D/PSC/329- 10.25 IRC Cast-in-situ 14-02-2014
333/2014
5 SCR Con 1x34.5 CAO/C/Designs/RC/547 12 IRC Cast in-situ 01-01-2003
6 SCR Con 0 1x34 CAO/C/D/RC/553 12 IRC Cast in-situ 01-01-2003
7 SCR Con 0 1x33 CAO/C/D/RC/255 10.95 IRC Cast in-situ 01-01-2005
8 SCR Con 0 3x30 CAO/C/D/RC/372 11.23 IRC Cast in-situ 01-01-2006
9 SWR Con 0 1x30 142-10 12 IRC Cast-in-situ 10-05-2014
10 SCR Con 0 1x30 and 1x18 CAO/C/D/RC/610 10.95 IRC Pre cast 01-01-2005
11 SCR Con 0 1x30.0+2x10.37 CAO/C/D/RC/686 11.55 IRC Cast in-situ 01-01-2003
12 SWR Con 1x29.663 12-10 13.25 IRC Cast-in-situ 10-01-2014
13 SCR Con 0 1x28.67 CAO/C/D/RC/285 11.23 IRC Cast in-situ 01-01-2007
14 SCR Con 0 1x28 CAO/C/D/RC/720 10.95 IRC Cast in-situ 01-01-2003
15 SCR Con 0 1x28 + 2x10.37 CAO/C/D/RC/865 10.95 IRC Cast in-situ 01-01-2004
16 SCR Con 0 1x26 CAO/C/D/RC/264 12 IRC Cast in-situ 01-01-2005
17 SCR Con 0 1x25.3 CAO/C/D/RC/85 7.4 IRC Cast in-situ 01-01-2007
18 SCR Con 0 1x24.0 CAO/C/D/RC/402 10.95 IRC Cast in-situ 01-01-2007
19 SCR Con 0 1x24 + 1x23.287 CAO/C/D/RC/238 10.95 IRC Cast in-situ 01-01-2005
20 SCR Con 0 1x24 + 1x23.287 CAO/C/D/RC/238 10.95 IRC Cast in-situ 01-01-2005
21 SCR Con 0 1x23 + 2x10.37 CAO/C/D/RC/498 10.95 IRC Cast in-situ 01-01-2004

03 June 2016 Page 8 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
22 SCR Con 0 1x23 + CAO/C/D/RC/527 12 IRC Cast in-situ 01-01-2005
(1x17.50+1x18.0)
23 SCR Con 0 1x23 + 2x10.37 CAO/C/D/RC/498 10.95 IRC Cast in-situ 01-01-2004
24 SCR Con 0 1x23 + CAO/C/D/RC/522 12 IRC Cast in-situ 01-01-2005
(1x17.50+1x18.0)
25 SCR Con 46 1x22.1 CAO/C/D/RC/175 11.05 IRC Cast in-situ 01-01-2006
26 SCR Con 0 1x22.0 CAO/C/D/RC/45 19.7 IRC Precast 01-01-2006
27 SCR Con 0 1x20 CAO/C/RC/667 10.95 IRC Cast in-situ 01-01-2003
28 SCR Con 0 2x18.135 CAO/C/D/RC/39 12 IRC Cast in-situ 01-01-2007
29 SCR Con 0 1x30 and 1x18 CAO/C/D/RC/610 10.95 IRC Pre cast 01-01-2005
30 SCR Con 70 2x15.17 CAO/C/D/RC/280 12 IRC Pre cast 01-01-2007
31 SCR Con 0 1x14 CAO/C/D/PSC/197 11.06 IRC Cast in-situ 01-01-2008
Girder 132
1 NR Con 61.38 45.772 10.3 IRC Pre cast
2 CR OL 0 43 TBCIDR/332-336 9.6 IRC Precast 13-05-2013 7.61
3 NR Con 66 32.602+42.602 14.15 IRC Cast in situ
4 NR Con 0 42.42 22.47 IRC Cast in situ
5 NR Con 0 41.452 15.05 IRC Cast in situ
6 SCR Con 0 41.2 CAO/C/D/RC/01 12.25 IRC 01-01-2007
7 NR Con 71 40.364 28.5 IRC Pre cast
8 NR Con 0 39.9 12 IRC Cast in situ
9 NR Con 0 39.9 12 IRC Cast in situ
10 NR Con 42 29.302+39.222 29.1 IRC Cast in situ
11 NR Con 32 38.804 12 IRC Pre cast
12 NWR Con 0 38.59 1289,2229, 2230, 2428, 11.1 IRC Cast-in-situ 30-09-2010
2429,2406
13 NWR Con 28.83 38.57 1884,2211, 2686, 2685, 12 IRC Cast-in-situ 04-04-2011
2684

03 June 2016 Page 9 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
14 NR Con 0 1x19.0+1x37.8+1x 12 IRC Cast in situ
19.0
15 NR Con 0 5x37.200 10.5 IRC Cast in situ
16 NR Con 51.63 37.048 10.3 IRC Pre cast
17 NR Con 17 36.8 36.4 IRC Pre cast
18 NWR Con 0 36.67 1762, 2279 to 2284 12 IRC Cast-in-situ 26-02-2010
19 NWR Con 57.9 36.51 2712 to 2719 11.1 IRC Cast-in-situ 13-05-2011
20 WCR OL 59 36.5 GM(W) 1302 to 1306/1-D 12.5 IRC Pre cast Not
21 NR Con 0 36.468 14 IRC Cast in situ
22 NR Con 0 36.38 11.8 IRC Cast in situ
23 NWR Con 35.92 3036, 3034, 3035, 3037 12 IRC Cast-in-situ 25-07-2012
24 NR Con 0 2x35.650 11.6 IRC Cast in situ
25 NR Con 0 35.35 9.75 IRC Cast in situ
26 NWR Con 11.69 35.02 2197 to 2201 12.05 IRC Cast-in-situ 11-12-2009
27 WCR OL 0 35 GM(W) 623 to 632 /1-D 12 IRC Cast in situ 07-11-2007 Rs. 6.7
28 NWR Con 0 34.5 2164 to 2167 11.5 IRC Cast-in-situ 14-10-2009
29 NR Con 32 34 37 IRC Cast in situ
30 NR Con 0 33.656 11.65 IRC Cast in situ
31 NR Con 0 33.004 20.7 IRC Pre cast
32 NWR Con 62 33 2259 to 2263,2022 12 IRC Cast-in-situ 23-02-2010
33 NWR Con 46 32.9 2592, 2593, 2594, 2591 12 IRC Cast-in-situ 20-12-2010
34 NWR Con 57.9 32.868 2720 to 2726 11.1 IRC Cast-in-situ 13-05-2011
35 NR Con 16 32.76+20.11+17.54 12 IRC Pre cast
36 NR Con 0 32.602 14.05 IRC Cast in situ
37 NWR OL 34 1x23.16+2x32.516 CBE-117/JP/ROB/2009/R1 15 IRC Pre-cast
38 NR Con 24.5 16.396+32.200 20.7 IRC Cast in situ
39 NR Con 0 32.2 10.5 IRC Cast in situ

03 June 2016 Page 10 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
40 NR Con 9.12 32.19 21.65 IRC Cast in situ
41 NWR Con 42.35 31.921 2662, 2664, 2665, 10.1 IRC Cast-in-situ 16-03-2011
2661,2666
42 WR OL 10 1x31.7 IDA 18.85 IRC Precast 01-01-2013 NA
43 NR Con 3.7 31.5 20.7 IRC Cast in situ
44 NR Con 0 31.33 12 IRC Cast in situ
45 NWR Con 37.84 31.295 3348 to 3351 12 IRC Cast-in-situ 02-01-2014
46 NWR Con 31.17 3401, 3429 to 3433 11.8 IRC Cast-in-situ 11-03-2014
47 SCR Con 1x31+2x10 CAO/C/D/RC/279 19.7 IRC Cast in-situ 01-01-2004
48 NR Con 20 30.867 22.7 IRC Pre cast
49 NWR Con 15.65 30.71 2288 to 2296 12.1 IRC Cast-in-situ 03-03-2010
50 SWR Con 1x30.628 159-11 9 IRC Precast 11-08-2014
51 WCR OL 33 30+25 GM(W)1344/3-D to 12 IRC Pre cast 01-11-2011
1355/3-D
52 NR Con 16 2x30.000 28 IRC Pre cast
53 NWR OL 51.295 2x19.5+1x30.0 CBE/22/JP/ROB/2009 IRC Pre-cast
54 SCR con 0 1X24.00+1X30.00+ (i) CAO/C/D/RCC/66- 12 IRC Pre Cast 14-02-2014
3X24 71/2014
55 NR Con 10 30 31.5 IRC Pre cast
56 NR Con 45 30 12.65 IRC Cast in situ
57 NWR Con 29.7 3060, 3059, 3057 3058 12 IRC Cast-in-situ 25-07-2012
58 NWR Con 12.54 29.709 2562 to 2564 11.9 IRC Cast-in-situ 22-10-2010
59 NR Con 0 29.6 14 IRC Cast in situ
60 NR Con 20 29.35 13.6 IRC Cast in situ
61 NR Con 0 29.12 12 IRC Cast in situ
62 NR Con 10 28.858 17.1 IRC Pre cast
63 NWR Con 37.84 28.79 3352 to 3355 12 IRC Cast-in-situ 02-01-2014
64 NR Con 43 28.454+26.936 12 IRC Cast in situ
03 June 2016 Page 11 of 21
Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
65 NR Con 60 28.400+17.800 12 IRC Pre cast
66 NWR OL 28 1x28.371 CBE-390/ 15 IRC Pre-cast
JP/ROB/2012/Sheet 9/15
67 NWR OL 28 1x28.371 CBE-390/ 15 IRC Pre-cast
JP/ROB/2012/Sheet 9/15
68 NR Con 38.4 28.252 10.5 IRC Cast in situ
69 NR Con 29.53 27.98 13.5 IRC Pre cast
70 NR Con 38.8 2X22.65+27.95+18 12.75 IRC Pre cast
.75
71 NWR OL 35.715 1x27.881 CBE-506/ 10.5 IRC Cast in-situ
JP/ROB/2012/Sheet 1/10
72 NR Con 0 2x22.127+2x27.873 14 IRC Pre cast
73 NR Con 6.44 27.568 12 IRC Cast in situ
74 NR Con 0 27.49 10.3 IRC Pre cast
75 NR Con 0 27 18.476 IRC Pre cast
76 SCR Con 0 2x27 CAO/C/D/RC/149 19.8 IRC Precast 01-01-2004
77 NR Con 9.2 26.829 37 IRC Pre cast
78 NR Con 8.9 26.752 37 IRC Cast in situ
79 NR Con 0 26.07 20.7 IRC Cast in situ
80 NR Con 3.88 26.056 12 IRC Cast in situ
81 NR Con 15 21.36+25.65+15.16 17.6 IRC Pre cast
82 NR Con 0 3x25.500 12 IRC Pre cast
83 WR OL 20.35 2x25.38+1x40 LC2B 13.8 IRC Precast 01-01-2013 NA
84 SCR Con 56 2x11.087 +25.107 CAO/C/D/RC/518 11 IRC Pre cast 01-01-2005
85 WCR OL 4 25 GM(W) 1254 to 1255/3 -D 12 IRC Pre cast 01-06-2011 Rs. 18
86 NWR OL 11 2x15+2x25+1x25.08 CBE-629/ BKN/ROB/2013 14.8 IRC Cast in-situ
87 NWR OL 22.81 1x24.962+1x12.756 CBE-583/ 12.1 IRC Pre-cast
JP/ROB/2013/Sheet 8/17

03 June 2016 Page 12 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
88 SWR Con 1x24.90 152-11 12.5 IRC Precast 11-08-2014
89 NR Con 22 24.860+12.010 20.7 IRC Cast in situ
90 NR Con 44.28 2x24.522 10 IRC Pre cast
91 NR Con 10 2x17.650+1x24.319 20.7 IRC Pre cast
92 NR Con 45 24.26 12 IRC Cast in situ
93 NR Con 13 24.26 10.5 IRC Cast in situ
94 NWR Con 0 24.26 2398 to 2401 11.9 IRC Cast-in-situ 28-07-2010
95 NR Con 23 24.257 10.5 IRC Cast in situ
96 NR Con 29 24.240+17.150 12 IRC Cast in situ
97 NR Con 29.53 24.135 8.4 IRC Pre cast
98 NR Con 0 1x24.000 12 IRC Cast in situ
99 NR Con 37.61 23.7 20.55 IRC Cast in situ
100 SWR Con 1x23.56 333-13 10.66 IRC Precast 13-11-2014
101 NR Con 0 23.255 12.9 IRC Pre cast
102 NWR OL 34 1x23.16+2x32.516 CBE-117/JP/ROB/2009/R1 15 IRC Pre-cast
103 NR Con 38 23.122+18.528 12 IRC Cast in situ
104 NR Con 31 23 26.9 IRC Pre cast
105 NWR Con 0 21.94 2389 to 2392 11.9 IRC Cast-in-situ 28-07-2010
106 NR Con 0 1x11.0+1x21.6+1x 12 IRC Cast in situ
11.0
107 NR Con 0 2x16.6+2x21.6 20.7 IRC Pre cast
108 SCR Con 0 1x21.4 CAO/C/D/RC/211 10.95 IRC Precast 01-01-2005
109 NR Con 0 4x21.010 9.75 IRC Cast in situ
110 SCR con 0 1X20.50 CAO/C/D/RC/101- 10 IRC Pre cast 13-04-2014
106/2013
111 NWR OL 51.295 2x19.5+1x30.0 CBE/22/JP/ROB/2009 IRC Pre-cast
112 NR Con 15.78 19.236 8.4 IRC Pre cast

03 June 2016 Page 13 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
113 NR Con 0 18.8 12 IRC Pre cast
114 NR Con 0 18.8 12 IRC Pre cast
115 SCR Con 0 1x23 + CAO/C/D/RC/527 12 IRC Cast in-situ 01-01-2005
(1x17.50+1x18.0)
116 SCR con 0 1X18.00 i) CAO/C/D/PSC/09- 8.25 IRC Pre cast 14-01-2014
13/2014
117 WCR OL 0 18 GM(W) JBP-86R, 88R & 12 IRC Pre cast 01-07-2004 Not
90 R Available
118 SCR Con 1x18 + 1x16.459 CAO/C/D/RC/600 11.05 IRC Cast in-situ 01-01-2006
119 SCR Con 26 1x18.0 CAO/C/D/RC/264 11.05 IRC Cast in-situ 01-01-2006
120 SCR Con 0 1x23 + CAO/C/D/RC/527 12 IRC Cast in-situ 01-01-2005
(1x17.50+1x18.0)
121 NR Con 0 17.41 12 IRC Pre cast
122 SCR Con 18/16.84169 CAO/C/D/RC/567 11.05 IRC Cast in-situ 01-01-2006
123 SWR Con 1x16.80 203-12 18 IRC Precast 12-11-2014
124 SCR Con 1x18 + 1x16.459 CAO/C/D/RC/600 11.05 IRC Cast in-situ 01-01-2006
125 SCR con 0 4X16.30 CAO/C/D/PSC/120- 19.8 IRC Pre cast 09-02-2014
124/2009 & 72- Load test
126 WR OL 30 2x15.9+1x24 LC29SPL 10.25 IRC Precast 01-01-2013 NA
127 NWR OL 11 2x15+2x25+1x25.08 CBE-629/ BKN/ROB/2013 14.8 IRC Cast in-situ
128 NR Con 46.33 2x15.000+2x15.000 28.5 IRC Cast in situ
129 NWR Con 14.979 3421 to 3427 11.8 IRC Cast-in-situ 27-03-2014
130 NWR Con 11.69 13.29 2052 to 2057 12.05 IRC Cast-in-situ 10-12-2009
131 NWR OL 22.81 1x24.962+1x12.756 CBE-583/ 12.1 IRC Pre-cast
JP/ROB/2013/Sheet 8/17
132 NWR Con 0 12.165 2336 TO 2341 12 IRC Cast-in-situ 04-05-2010
Slab 21
1 NWR Con 39 2310, 2311,2313, 2314 10.15 IRC Cast-in-situ 31-03-2010
2 NWR Con 27.9 2248,2251 to 2253 10.25 IRC Cast-in-situ 22-02-2010
03 June 2016 Page 14 of 21
Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
3 NWR Con 0 27.53 1948,1950,1951,1966 11.5 IRC Cast-in-situ 19-08-2009
4 NWR Con 28 27.15 1822,1823,1827 10.6 IRC Cast-in-situ 09-02-2009
5 NWR Con 62 26.48 2151, 2154,2156,2022 12 IRC Cast-in-situ 23-02-2010
6 NWR Con 4.159 25.29 1962 to 1965 11 IRC Cast-in-situ 10-06-2009
7 SCR Con 0 1x24 + 2x10.37 CAO/C/RC/735 10.95 IRC Cast in-situ 01-01-2002
8 NWR Con 62 22 2152, 2153,2155 12 IRC Cast-in-situ 23-02-2010
9 NWR Con 0 19.7 2121, 2120 11.5 IRC Cast-in-situ 14-10-2009
10 NWR Con 0 19.5 1947,1949,1963,2117 11.5 IRC Cast-in-situ 19-08-2009
11 SWR Con 1x14.88 18-14 9.25 IRC Cast-in-situ 14-01-2014
12 NWR Con 13.48 2256,2257,2258 10.25 IRC Cast-in-situ 22-02-2010
13 SWR Con 1x13 211-13 6.3 IRC Precast 13-06-2014
14 NWR Con 12.63 2249,2250, 2254,2255 10.25 IRC Cast-in-situ 22-02-2010
15 SWR Con 1x12.00 224-13 6.5 IRC Precast 13-07-2014
16 SWR Con 0 1x12.0 69-12 6.3 IRC Cast-in-situ 12-05-2014
17 NWR Con 62 12 2375,2376,2022 12 IRC Cast-in-situ 23-02-2010
18 SWR Con 1x12 206-13 10.9 IRC Precast 13-06-2014
19 SWR Con 0 1x12.0 68-12 11 IRC Cast-in-situ 12-05-2014
20 SCR Con 0 1x23 + 2x10.37 CAO/C/D/RC/498 10.95 IRC Cast in-situ 01-01-2004
21 SCR Con 0 1x23 + 2x10.37 CAO/C/D/RC/498 10.95 IRC Cast in-situ 01-01-2004
RCC 52
BowString 2
1 ECR Con 0 60 IRCON DD 320- 12 IRC At site
326R0,327RA
2 ECR Con 0 50 IRCON 103R0, 111- 12 IRC At site
116R0, 117RA
Box 6
1 SWR Con 1 x 11.30 x 7.3 37-11 11 IRC Cast-in-situ 11-02-2014
2 SWR Con 1 x 11.30 x 7.15 43-14 11.3 IRC cast-in-situ 14-03-2014
03 June 2016 Page 15 of 21
Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
3 NWR Con 15 7.5 2354 15.07 IRC Cast-in-situ 11-05-2010
4 NWR Con 50 7.5 2356 30.567 IRC Cast-in-situ 11-05-2010
5 NWR Con 45 7.5 2372 50 IRC Cast-in-situ 11-06-2010
6 NWR Con 30.3 5.5 3208 11.722 IRC Cast-in-situ 12-05-2013
Girder 33
1 NWR OL 20 1x31.28+2x15 2017/E/DD-101 14.8 IRC Cast in-situ
2 NWR OL 19.49 1x31.28+1x20.676 CBE-652/ 12.9 IRC Cast in-situ
BKN/ROB/2014/ Sheet
1/27
3 NR Con 0 28.0+11.820 1.2 IRC Cast in situ
4 NFR Con 0 27.75 CE/CON/MAJ/L- 7.5 IRC Cast in situ 01-11-2013 Under
S/B/153/2013 Constru
5 NR Con 20 24.976 10.3 IRC Cast in situ
6 NR Con 0 24.6 12 IRC Cast in situ
7 NR Con 20 24.13 13.6 IRC Cast in situ
8 NR Con 22.8 23.6 26.1 IRC Cast in situ
9 ECoR Con 0 2X12.2+2X23.5 1. CE/C/III/BBS/LPG/ROB/ 9.75 IRC Cast-in situ 01-10-2010
RCC-G/1972 & 1973/10

10 NR Con 0 12.600+22.6 9.75 IRC Cast in situ


11 NR Con 7.18 21.6 8.6 IRC -
12 NR Con 32 20.761+16.139 23.85 IRC
13 NWR OL 19.49 1x31.28+1x20.676 CBE-652/ 12.9 IRC Cast in-situ
BKN/ROB/2014/ Sheet
1/27
14 NR Con 45 20.496 13.75 IRC Pre cast
15 NR Con 60.25 19.70+2x9.900 21 IRC Cast in situ
16 NR Con 10 18.974+16.495 17.1 IRC Cast in situ
17 NR Con 14 18.8 14 IRC Cast in situ

03 June 2016 Page 16 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
18 NR Con 37.13 2x18.000 12 IRC Cast in situ
19 NR Con 45 16.66 20.9 IRC Pre cast
20 NR Con 6 16.560+10.645 28 IRC Cast in situ
21 NR Con 0 10.160+2x15.660 12 IRC Cast in situ
22 NWR OL 20 1x31.28+2x15 2017/E/DD-101 14.8 IRC Cast in-situ
23 NR Con 16 15 28 IRC Cast in situ
24 NR Con 0 2x14.000 12 IRC Cast in situ
25 NR Con 5.67 2x14.000 12 IRC Cast in situ
26 NR Con 0 12.88 14 IRC Cast in situ
27 NR Con 0 2x12.360 18.476 IRC Cast in situ
28 ECoR Con 0 2X12.2+2X23.5 1. CE/C/III/BBS/LPG/ROB/ 9.75 IRC Cast-in situ 01-10-2010
RCC-G/1972 & 1973/10

29 WR OL 0 2x12+1x36 UJJAIN 3+554 12 IRC Precast 01-01-2013 NA


30 WR OL 0 2x12+1x36 UJJAIN 4+539 12 IRC Precast 01-01-2013 NA
31 NR Con 19.13 11.82 12 IRC -
32 NR Con 13 10.977 10.5 IRC Cast in situ
33 NR Con 0 2x9.100 10.3 IRC Cast in situ
Portal 1
1 SWR Con 1x17.6+1x5.68 121-13 7.5 IRC Cast-in-situ 13-03-2014
Slab 10
1 WCR OL 0 40 GM(W)1044 to 1048/1-D 12 IRC Cast in situ 10-06-2010 Rs. 6
2 NWR Con 28 16.56 2285, 2286, 2287 10.6 IRC Cast-in-situ 26-02-2010
3 SWR Con 0 1x12.0 35-13 6.3 IRC Cast-in-situ 13-02-2014
4 SWR Con 0 1x12.0 56-14 11.7 IRC Cast-in-situ 14-03-2014
5 SWR Con 1x12.0 36-13 10.8 IRC Cast-in-situ 13-02-2014
6 SCR Con 56 2x11.087 +25.107 CAO/C/D/RC/518 11 IRC cast in-situ 01-01-2005
7 SCR Con 0 1x30.0+2x10.37 CAO/C/D/RC/686 11.55 IRC Cast in-situ 01-01-2003
03 June 2016 Page 17 of 21
Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
8 SCR Con 0 1x24 + 2x10.37 CAO/C/RC/735 10.95 IRC Cast in-situ 01-01-2002
9 SCR Con 0 1x28 + 2x10.37 CAO/C/D/RC/865 10.95 IRC Cast in-situ 01-01-2004
10 SCR Con 1x31+2x10 CAO/C/D/RC/279 19.7 IRC Cast in-situ 01-01-2004
RUB 76
Composite 1
Girder 1
1 SWR Con 2x11.76 189-13 4.6 25T cast-in situ 13-05-2014
PSC 8
Box 2
1 SWR Con 0 2x32.58 150-12 5.3 25T Cast-in-situ 12-08-2014
2 SWR Con 2x30.46 25-13 5.4 25T Precast 13-01-2014
Girder 3
1 SWR Con 1 x 24.4 (sk) 334-13 6.682 25T Precast 13-11-2014
1x18.254 (sq)
2 SWR Con 0 1x20.2 152-13 5.3 25T Cast-in-situ 13-05-2014
3 SCR Con 0 1x12.2 CAO/C/D/RC/696 6.775 IRC 01-01-2003
Slab 3
1 SWR Con 0 1x12.2 144-11 4.8 25T Precast 11-07-2014
2 SWR Con 1x12.20 123-13 4.8 25T Precast 13-03-2014
3 SWR Con 1x9.15 59-13 4.8 25T Cast-in-situ 13-02-2014
RCC 67
Box 66
1 SCR con 0 1X13.50x6.22- CAO/C/D/RC/119-2013 32.2 25t Precast 13-05-2014
BoxPushing
2 SCR con 0 1X12.00x5.56- CAO/C/D/RC/198-2012 43 25t Precast 12-07-2014
BoxPushing
3 SWR Con 0 2x11x5.5 + 36-10 11 25T Cast-in-situ 10-02-2014
2x5.5x5.5

03 June 2016 Page 18 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
4 SCR con 0 2X11.00 x 4.50 CAO/CD/RC/486-2009 25T Precast 11-11-2014
5 SWR Con 2 x 10.95 x 5.15 370-13 10.97 25T Cast-in-situ 14-01-2014
6 SWR Con 1 x 10.5 x 3.75 308-13 9.65 25T Precast 13-10-2014
7 SCR con 0 2X9.50x5.50- CAO/C/D/RC/159-2013 30.6 25t Precast 13-07-2014
BoxPushing
8 SWR Con 1x9.5x4.0 190-13 9.5 25T Precast 13-05-2014
9 SWR Con 2x9.5x5.8 252-13 9.5 25T Precast 13-08-2014
10 SWR Con 0 1 x 9.5 x 5.15 101-10 9.5 DFC Cast-in-situ 10-05-2014
11 SWR Con 1x9.5x4.935 101-13 9.5 25T Cast-in-situ 13-03-2014
12 SWR Con 0 1 x 9.5 x 2.65 22-11 9.5 DFC Cast-in-situ 11-02-2014
13 SWR Con 0 1 x 9.50 x 4.15 155-11 9.5 25T Precast 11-08-2014
14 SWR Con 2x9.5x5.3 309-13 9.5 25T Precast 13-09-2014
15 SWR Con 0 1 x 9.5 x 5.80 140-2010 9.5 25T Cast-in-situ 10-05-2014
16 SWR Con 0 1 x 9.5 x 3.35 54-11 9.5 25T Precast 11-03-2014
17 SWR Con 2 x 9.3 x 4.938 161-10 18.6 25T Cast-in-situ 10-07-2014
18 SWR Con 0 1x9x4.66 13-14 9 IRC Cast-in-situ 14-02-2014
19 SWR Con 1 x 8.5 x 3.15 126-13 8.5 25T Precast 13-03-2014
20 SWR Con 1 x 8.50 x 3.22 211-12 8.5 25T Cast-in-situ 12-11-2014
21 SCR con 0 1X7.50x5.50 CAO/C/D/RC/425-2010 27.845 25t Cast-in-situ 10-06-2014
22 SWR Con 1x7.5x4 223-13 7.5 25T Cast-in-situ 13-06-2014
23 SWR Con 1x7.5x3.2 29-13 7.5 25T Precast 13-03-2014
24 SWR Con 2 x 7.50 x 5.65 106-11 15 25T Cast-in-situ 11-05-2014
25 SWR Con 1 x 7.5 x 4.65 276-13 7.5 25T Cast-in-situ 13-09-2014
26 CR OL 0 7.5 CH/KM-BP/02 25T Precast 13-05-2013
27 SWR Con 1 x 7.5 x 4.1 41-12 7.5 25T Precast 12-03-2014
28 NWR Con 2X7.15 3210 15 25T Cast-in-situ 04-12-2013
29 SCR con 0 2X6.34, 3X6.70 CAO/CD/RC/218-2014 6.85 25t Cast-in-situ 14-04-2014

03 June 2016 Page 19 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
30 NWR Con 2X6.75 3209 15 25T Precast 04-12-2013
31 CR OL 0 6.5 STC/NKR/BOXP.T 25T Precast 12-06-2012 1.36
32 SCR con 0 1X6.00x5.00 CAO/C/D/RC/73-2013 17 25t Precast 13-03-2014
BoxPushing
33 SWR Con 0 1 x 6 x 4.8 233-12 6 25T Precast 13-02-2014
34 SWR Con 2 x 6 x 5.95 183-11 12 25T Cast-in-situ 11-11-2014
35 SWR Con 1 x 6 x 4.95 40-11 6 25T Cast-in-situ 11-02-2014
36 SWR Con 50 1x6 207-10 6 25T Cast-in-situ 10-10-2014
37 SWR Con 1x6x6 377-13 6 25T Cast-in-situ 13-12-2014
38 SWR Con 2x6x8 71-13 6 25T Cast-in-situ 13-02-2014
39 SWR Con 1x6x5.15 72-13 6 25T Cast-in-situ 13-02-2014
40 SWR Con 1x6x5 82-13 6 25T Cast-in-situ 13-03-2014
41 SCR con 0 1X6.00x5.00- CAO/C/D/RC/115-2013 28.6 25t Precast 13-05-2014
BoxPushng
42 SCR OL 0 5.5 GM(W)SC/BR/2498/2008 6.85 HML Pre cast 31-12-2008
43 SWR Con 0 1x6x6.15 187-13 6 25T Cast-in-situ 13-05-2014
44 SWR Con 0 1x6x4.15 170-13 6 25T Cast-in-situ 01-04-2013
45 NWR Con 6.0+5.0 3194 sheet1 11.55 25T Cast-in-situ 04-12-2013
46 SCR Con 0 2x5.75x2.94 CAO/C/D/RC/249 IRC Cast in-situ 01-01-2004
47 SWR Con 45 2 x 5.0 x 5.15 145-10 10 25T Precast 10-06-2014
48 SWR Con 1x5x5.15 40-14 5 25T Cast-in-situ 14-03-2014
49 SWR Con 0 1 x 5 x 4.515 15-14 5 25T Precast 14-01-2014
50 SCR con 0 2X5.20x3.00 CAO/C/D/RC/178/2012 17 DFC Precast 12-06-2014
51 SWR Con 0 1 x 5.00 x 2.8 196-11 5 25T Precast 11-10-2014
52 SWR Con 58 1x5x5 146-13 5 25T Cast-in-situ 01-04-2013
53 NWR Con 45 2X5 3321 32.15 25T Precast 11-11-2013
54 SWR Con 1x5x5.16 41-14 5 25T Cast-in-situ 14-03-2014

03 June 2016 Page 20 of 21


Br Type Mat Geom Rly Org Skew Span Drawing No Deck width Std of Precast/cast Design year Cost
Type Angle Loading -in-situ
55 SWR Con 1x5x5.15 297-13 5 25T Cast-in-situ 13-09-2014
56 NWR Con 5.75+4.75 3194 sheet2 11.55 25T Cast-in-situ 04-12-2013
57 CR OL 0 4.5 STC/BSL/P.T.-03 25T Precast 13-08-2013 2.0 crore
58 NWR Con 55 2X4.5 3245 11.94 25T Cast-in-situ 23-07-2013
59 NWR Con 30 1X4.5 3390 7.19 25T Cast-in-situ 27-02-2014
60 SWR Con 0 2x4x2.65 248-10 8 25T Precast 11-02-2014
61 SCR OL 0 4 GM(W)SC/BR/2424/2007 6.85 25T Pre cast 31-12-2007
62 SWR Con 0 3 x 3.80 x 4.85 163-10 11.4 25T Cast-in-situ 10-08-2014
63 SCR Con 0 2x3.66x2.8 CAO/C/D/RC/109 8.22 IRC Pre cast 01-01-2006
64 SWR Con 0 4 x 3.60 x 4.72 162-10 14.4 25T Cast-in-situ 10-08-2014
65 SWR Con 0 1 x 3 x 3.65 146-11 3 25T Precast 11-08-2014
66 SCR con 0 1X2.00x2.25- CAO/C/D/RC/116-2013 25.492 25t Precast 13-05-2014
BoxPushing
slab 1
1 SCR OL 0 1x7.9 GM(W)SC/BR/2589/2009 4.5 25T Pre cast 01-02-2010
Total 449

03 June 2016 Page 21 of 21

S-ar putea să vă placă și