Sunteți pe pagina 1din 13

50 kw =50000w

Per Wat
inverter Cost 230000
28/wat panel 1400000
4/wat strcuture 200000
wire etc 50000
manpower 20000
transport 20000
etc 25000
total cost 1945000
38.9

Project Kw Project Cost/Kw

1 to 2 65
3 to 5 55
6 to 10 52
11 to 25 50
25 to 50 48
50 and above
Wat Conversion
Mw Kw Wat
1 1000 1000000
Calculation

Wat Unit genration


1 4 to 5

Project Calculation
Unit
Avg. Unit Consumption of last 6 month
Avg. Unit Consumption/ year 0
Customer Power Avg. Unit Consumption/ day (270 Days or 9 month 0.000
Consumption Consider)

Per Day power Genration 0.000


PV Solar Project Project requirement 0.00 Kw
Requirement
Project Cost/Kw
Project Cost 0
GST 5 % 0
Total Project Cost 0
Note :- Fill data in yellow Block
HP to Wat
HP Kw Wat
1 0.746 746
0 0
Energy Consumption In Wat
Consumption time Hrs
WH
Lead Acid Battery
Calculation Wh
inefficiency factor

Daily Energy Use requirement


Back up no. of days

Back up Power requirement without charging from Batery

Batery Capacity Batery Volt


requirement Baterry AH requirement

Li-Ion Battery
Calculation Wh
inefficiency factor
Daily Energy Use requirement
Back up no. of days

Back up Power requirement without charging from Batery

Batery Capacity Batery Volt


requirement Baterry AH requirement
400
3
1200
Battery
1200
1.5 Wh*1.5 1200*1.5 1800 Wh

requirement 1.8 Kwh


3
10.8 Kwh 10800 Wat

48
225 AH

ttery
1200
1.05 1200*1.05 1260 Wh
requirement 1.26 Kwh
3
7.56 Kwh 7560 Wat

48
157.5 AH