Fixing face Note: We do not recommend a level Installation frame has to be securely fixed to the building
*Power supply for operator
threshold through the door opening in
order to reduce possible water ingress 1) Alternative 1 (CDM9) Installation frame
prosecuted according to existing law.

(not for docking doors) - Phase, 230V 10 amp (cee wall socket) Material Width b (minimum)
to be located within 0,5 m from the operator (by others) Steel 70 mm
Outside Wood 90 mm

3°-5°
Concrete can also be used to

10
2) Alternative 2 (CDM9)
- Phase, 230 V 10amp (max) isolator (by others) form the opening
adjacent to the control unit
Optional angle (by others) Free space for the door above the opening, required for the
0 min whole marked area above the opening
10 max Note center support
170 Free side space
Center support is always
THRESHOLD DETAIL C ( 1 : 10 ) required; **Only needed by electrical operator right mounted
when day light width
DAYLIGHT WIDTH
>3000 or **Only needed by electrical operator left mounted
the operator is located in
the center A **Only needed by electrical operator centre mounted

***Extra frame when outer support bearing is needed

If control panel is mounted right


DISTANCE BETWEEN ANGLES = 100 + DLW + 100
B-B ( 1 : 30 ) A-A ( 1 : 30 ) If control panel is mounted left
Required hedadroom Required space within the building from the installation frame
See note center support Normaly 1000
**320 **200 **320
A

200

**320
***150 ***150

HL + 350 max
HL + 320 min

90

**300

**300
*1 (Power supply)
*2

HL
A A

DEPTH = DAYLIGHT HEIGHT - HL + 800

b
(b) see note center support
DAYLIGHT HEIGHT A
b b
215
BUILDING PREPARATION
(INSIDE VIEW)

380
B B
Finished Floor line

1500
C

250 max
A
Contact
140= side space right 140= side space left
Pos Quantity Day light width Day light height Headroom Depth Side space left Side space right Track angle Operator
°(deg) Yes No
A 9513 VARIOUS CHANGES 2014-12-19 PD BV
Quote / Order Number Project: Notes: Left Right Centre Drawn Appr. Dimensions without specified tolerances refer to: Scale File Size
E
PD BV Valid at date of latest rev. A2
Date Replaces
SHB ARCHITECT/BUILDING
Drawn by Power supply alternative *
Status AN No. Date
1. 2. ASSA ABLOY Entrance Systems PREPARATION 9513 2014-11-24
Drawing No. Rev.
Rev. No. AN No. Revision Date Drawn Appr. K066879 A

S-ar putea să vă placă și