INTERMEDIATE CRACK SURVEY REPORT

H 072
Location: DK 25+400-DK 26+750

MATARA - KATARAGAMA RAILWAY PROJECT

Investigated and Prepared By:

D.M.A.K.Disanayake
B.Sc.Eng.(Hons.)
Mining Engineer

R.S.Wickramathilaka
Technical Officer

(GSMB) Technical Services (Pvt) Ltd.


No.569, EpitamullaRoad,Pitakotte

Project Proponent
CMC Site
BandaranayakeSchool,Weraduwa,Matara

February 2018
Intermediate crack Survey Report

Report on Intermediate Crack Survey @ DK 25+400 ~ DK 26+750

Date of Inspection - 14.02.2018


Reference No. - GTS /CR5/01/GV/ICS/2018-01
Reason for the Inspection - As Requested by MOT & CMC – PM 4 (Complain Bases)

Contacted Inspection Houses

House
No Name Location
No
01 H 72 R.H.S.Nadeeshani DK 25+400 ~ DK 26+750

Attended on - Mr.Janaka
Envirmantal Officer
CMC – PM4

Measurement carried out by - Mr.D.M.A.K.Disanayaka


Mining Engineer
GSMB Technical Service

Mr.R.S.Wickramathilaka
Technical Officer
GSMB Technical Service

Reported By GSMB Technical Services (pvt) Ltd.


Intermediate crack Survey Report Page 1 of 24
---------------------------------------------------------------------------------------------------------------------
Location: DK 25+400 ~ DK 26+750
House No: H 72
Name : R.H.S.Nadeeshani
Address : Mangala Road,Beliatta
Coordinate:
E – 495798
N – 393579

Inspected Date: 14.02.2018

(1) Identification number of house: H 72

H 25+400 ~ 26+750 72 -1 H 25+400 ~ 26+750 72 –


(2) Photo notation:
P P P P

27, A, A(i)

(3) Approximate age of the house: 13 years

(4) Details of the land in which house was built on: Existing Ground

(5) Existing structural detail

5.1 Detail of the roof: Concrete Slab

5.2.1 Material type: Standard Bricks


5.2 Detail of the walls:
5.2.2 Thickness : -

5.3 Detail of the plaster: Both side of walls

5.4 Detail of the windows: Wooden

5.5 Details of floor Cemented

5.6 Details of foundation Reinforcement Concrete

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 2 of 24
............................................................................................................................................................

Plan view of H-72


U

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 3 of 24
............................................................................................................................................................

(6) Details of cracks at the Pre-Survey & Post Survey

Pre-Survey Post-Survey
26.09.2013 14.02.2018
Thickn New New Remarks
Crack Length Crack
ess Length Thickness
No (cm) No
(mm) (cm) (mm)
Horizontal crack from top Left
- - - C 01 30 01
Door Frame

- - - C 02 130 01 Horizontal Spread at medial wall

- - - C 03 65 02 Downward the slab

Angel Downward from Bottom


- - - C 04 50 02
right Window Frame
Upward from top Right Window
- - - C 05 45 03
frame (Both Side)
Downward from Bottom Left
- - - C 06 40 03 Window Frame Upward from
top right window frame
Horizontal from Bottom left
- - - C 07 90 03
Window Frame
Horizontal from Medial door
- - - C 08 120 03
frame
Angel Downward from Bottom
- - - C 09 70 01
right Window Frame
Angel upward from top right
I 15 01
window frame
- - - C 10
Angel both ways right side to
II 60 01
C10 I
Downward crack from bottom
- - - C 11 60 1
left window frame both side
Downward crack from bottom
- - - C 12 95 1
left window frame
Upward from top right window
- - - C 13 30 01
frame both side
Downward from left Bottom of
- - - C 14 100 02
the Window Frame

MJC – Major Crack C- Crack MC – Minor crack

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 4 of 24
............................................................................................................................................................

(6) Details of cracks at the Pre-Survey & Post Survey

Pre-Survey Post-Survey
26.09.2013 14.02.2018
New New Remarks
Crack Length Thickne Crack
Length Thickness
No (cm) ss (mm) No
(cm) (mm)
Upward from top left door
- - - C 15 45 02
frame both side
Upward from bottom right
- - - C 16 40 01
window frame
Upward from bottom left
- - - C 17 70 04
window frame

- - - C 18 150 01 Vertical Both way crack

Horizontal cross the C 18 along


- - - C 19 225 01
and then Horizontal
Upward from top Right window
- - - C 20 80 03
frame Both Side

- - - C 21 135 01 Angle Both ways crack

Upward from top right door


- - - C 22 75 01
frame
Upward from top right door
- - - C 23 45 02
frame - Both Side

- - - C 24 135 01 Horizontal both way

- - - C 25 100 01 Angle both ways under C 24

- - - C 26 60 01 Vertical both ways under C 25

- - - C 27 125 02 Vertical both ways – both side

MJC – Major Crack C- Crack MC – Minor crack

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 5 of 24
............................................................................................................................................................

(6) Details of cracks at the Pre-Survey & Post Survey

Pre-Survey Post-Survey
26.09.2013 14.02.2018
New New Remarks
Crack Length Thickne Crack
Length Thickness
No (cm) ss (mm) No
(cm) (mm)
Downward Crack from the left
- - - MC 01 40 Minor
bottom window frame
Downward Crack from Middle
- - - MC 02 35 Minor
window frame

- - - MC 03 25 Minor Vertical both ways

Horizontal both ways under MC


- - - MC 04 110 Minor
3

- - - MC 05 90 Minor Angle both ways under MC 4

Horizontal top left window


- - - MC 06 25 Minor
frame
Downward Crack from bottom
- - - MC 07 35 Minor
right window frame

- - - MC 08 110 Minor Vertical both ways Crack

Horizontal both ways under the


- - - MC 09 55 Minor
MC 08

- - - MC 10 60 Minor Angle both ways under the C 08

Upward from top right door


- - - MC 11 45 Minor
frame

- - - MC 12 120 Minor Horizontal both ways at MC 11

Downward Crack from bottom


- - - MC 13 35 Minor
right window frame
Horizontal from top lift window
- - - MC 14 40 Minor
Frame - Both side

MJC – Major Crack C- Crack MC – Minor crack

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 6 of 24
............................................................................................................................................................

(6) Details of cracks at the Pre-Survey & Post Survey

Pre-Survey Post-Survey
26.09.2013 14.02.2018
New New Remarks
Crack Length Thickne Crack
Length Thickness
No (cm) ss (mm) No
(cm) (mm)
Upward from Middle window
- - - MC 15 50 Minor
frame
Upward from top of the window
- - - MC 16 40 Minor
Frame

- - - MC 17 30 Minor Column bottom at Miner Crack

- - - MC 18 15 Minor Upward from wall

- - - MC 19 45 Minor Angle Both ways crack

- - - MC 20 50 Minor Vertical Both ways

- - - MC 21 70 Minor Vertical Both ways

- - - MC 22 100 Minor Vertical Both ways

- - - MC 23 15 Minor Horizontal from window frame

- - - MC 24 50 Minor Vertical downward crack

Upward from top left window


- - - MC 25 35 Minor
frame
Downward from top of the wall
- - - MC 26 100 Minor
– both Side
Downward from top of the wall
- - - MC 27 125 Minor
– both Side
Angle crack top right window
- - - MC 28 75 Minor
frame

MJC – Major Crack C- Crack MC – Minor crack

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 7 of 24
............................................................................................................................................................

(6) Details of cracks at the Pre-Survey & Post Survey

Pre-Survey Post-Survey
26.09.2013 14.02.2018
New New Remarks
Crack Length Thickne Crack
Length Thickness
No (cm) ss (mm) No
(cm) (mm)

- - - MC 29 55 Minor Horizontal crack

Upward from top right window


- - - MC 30 30 Minor
frame

- - - MC 31 130 Minor Vertical both ways

- - - A 40 - Floor cracked

- - - A1 40 - Floor cracked

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 8 of 24
............................................................................................................................................................

C 01

C 02

C 03

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 9 of 24
............................................................................................................................................................

C 04

C 05

C 06

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 10 of 24
............................................................................................................................................................

C 07

C 08

C 09

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 11 of 24
............................................................................................................................................................

C 10

C 11

C 12

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 12 of 24
............................................................................................................................................................

C 13

C 14

C 15

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 13 of 24
............................................................................................................................................................

C 16

C 17

C 18

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 14 of 24
............................................................................................................................................................

C 19

C 20

C 21

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 15 of 24
............................................................................................................................................................

C 22

C 23

C 24

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 16 of 24
............................................................................................................................................................

C 25

C 26

C 27

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 17 of 24
............................................................................................................................................................

Ai

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 18 of 24
............................................................................................................................................................

Crack Length Increment Percentage


U

Lengt New Length Length New


Crack
h Length Increment Increment Thickness Thickness
No
cm cm cm % mm mm
C 01 - 30 30 100.00 - 1
C 02 - 130 130 100.00 - 1
C 03 - 65 65 100.00 - 2
C 04 - 50 50 100.00 - 2
C 05 - 45 45 100.00 - 3
C 06 - 40 40 100.00 - 3
C 07 - 90 90 100.00 - 3
C 08 - 120 120 100.00 - 3
C 09 - 70 70 100.00 - 1
- 15 15 100.00 - 1
C 10
- 60 60 100.00 - 1
C 11 - 60 60 100.00 - 1
C 12 - 95 95 100.00 - 1
C 13 - 30 30 100.00 - 1
C 14 - 100 100 100.00 - 2
C 15 - 45 45 100.00 - 2
C 16 - 40 40 100.00 - 1
C 17 - 70 70 100.00 - 4
C 18 - 150 150 100.00 - 1
C 19 - 225 225 100.00 - 1
C 20 - 80 80 100.00 - 3
C 21 - 135 135 100.00 - 1
C 22 - 75 75 100.00 - 1
C 23 - 45 45 100.00 - 2
C 24 - 135 135 100.00 - 1
C 25 - 100 100 100.00 - 1
C 26 - 60 60 100.00 - 1
C 27 - 125 125 100.00 - 2
MC 1 - 40 40 100.00 - Minor
MC 2 - 35 35 100.00 `- Minor

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 19 of 24
............................................................................................................................................................
Lengt New Length Length New
Crack
h Length Increment Increment Thickness Thickness
No
cm cm cm % mm mm
MC 3 - 25 25 100.00 - Minor
MC 4 - 110 110 100.00 - Minor
MC 5 - 90 90 100.00 - Minor
MC 6 - 25 25 100.00 - Minor
MC 7 - 35 35 100.00 - Minor
MC 8 - 110 110 100.00 - Minor
MC 9 - 55 55 100.00 - Minor
MC 10 - 60 60 100.00 - Minor
MC 11 - 45 45 100.00 - Minor
MC 12 - 120 120 100.00 - Minor
MC 13 - 35 35 100.00 - Minor
MC 14 - 40 40 100.00 - Minor
MC 15 - 50 50 100.00 - Minor
MC 16 - 40 40 100.00 - Minor
MC 17 - 30 30 100.00 - Minor
MC 18 - 15 15 100.00 - Minor
MC 19 - 45 45 100.00 - Minor
MC 20 - 50 50 100.00 - Minor
MC 21 - 70 70 100.00 - Minor
MC 22 - 100 100 100.00 - Minor
MC 23 - 15 15 100.00 - Minor
MC 24 - 50 50 100.00 - Minor
MC 25 - 35 35 100.00 - Minor
MC 26 - 100 100 100.00 - Minor
MC 27 - 125 125 100.00 - Minor
MC 28 - 75 75 100.00 - Minor
MC 29 - 55 55 100.00 - Minor
MC 28 - 75 75 100.00 - Minor
MC 29 - 55 55 100.00 - Minor
MC 30 - 30 30 100.00 - Minor

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 20 of 24
............................................................................................................................................................
Lengt New Length Length New
Crack
h Length Increment Increment Thickness Thickness
No
cm cm cm % mm mm
MC 31 - 130 130 100.00 - Minor
4125
Total Length Increment Percentage = 100 %

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 21 of 24
............................................................................................................................................................
Overall Cracks Analysis
U

Pre Survey Type Descriptions


Minor Cracks Cracks Major Cracks A 00-20cm
Type Total % Type Total % Type Total % B 21-40cm
A 0 - A 0 0.0 A 0 0.0 C 41-60cm
B 0 - B 0 0.0 B 0 0.0 D 61-80cm
C 0 - C 0 0.0 C 0 0.0 E 81-100cm
D 0 - D 0 0.0 D 0 0.0 F 101-120cm
E 0 - E 0 0.0 E 0 0.0 G 121-140cm
F 0 - F 0 0.0 F 0 0.0 H 141-160cm
G 0 - G 0 0.0 G 0 0.0 I 161-180cm
H 0 - H 0 0.0 H 0 0.0 J 180cm <
I 0 - I 0 0.0 I 0 0.0
J 0 - J 0 0.0 J 0 0.0

MC 0 - C 0 - Major 0 -

Total Cracks 0

Post Survey
Minor Cracks Cracks Major Cracks
Type Total % Type Total % Type Total %
A 2 6.5 A 1 3.6 A 0 0.0
B 11 35.5 B 4 14.3 B 0 0.0
C 8 25.8 C 7 25.0 C 0 0.0
D 2 6.5 D 5 17.9 D 0 0.0
E 3 9.7 E 4 14.3 E 0 0.0
F 3 9.7 F 1 3.6 F 0 0.0
G 2 6.5 G 4 14.3 G 0 0.0
H 0 0.0 H 1 3.6 H 0 0.0
I 0 0.0 I 0 0.0 I 0 0.0
J 0 0.0 J 1 3.6 J 0 0.0

MC 31 52.5 C 28 47.5 Major 0 0.0

Total Cracks 59

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 22 of 24
............................................................................................................................................................
Pre Survey-Post Survey Comparison
Minor Cracks Cracks Major Cracks
Pre Post Pre Post Pre Post
Type % Type % Type
C/S C/S C/S C/S C/S C/S %
A 0 2 - A 0 1 0.0 A 0 0 0.0
B 0 11 - B 0 4 0.0 B 0 0 0.0
C 0 8 - C 0 7 0.0 C 0 0 0.0
D 0 2 - D 0 5 0.0 D 0 0 0.0
E 0 3 - E 0 4 0.0 E 0 0 0.0
F 0 3 - F 0 1 0.0 F 0 0 0.0
G 0 2 - G 0 4 0.0 G 0 0 0.0
H 0 0 - H 0 1 0.0 H 0 0 0.0
I 0 0 - I 0 0 0.0 I 0 0 0.0
J 0 0 - J 0 1 0.0 J 0 0 0.0

Minor 0 31 - Inter 0 28 0.0 Major 0 0 0.0

Total Cracks on Pre Blast C/S 0


Total Cracks on Post Blast C/S 59

Crack Increment Percentage 100 %

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 23 of 24
............................................................................................................................................................

Reported By GSMB Technical Services (pvt) Ltd. H 72


Intermediate crack Survey Report Page 24 of 24
............................................................................................................................................................

Reported By GSMB Technical Services (pvt) Ltd. H 72