Sunteți pe pagina 1din 3

Table of Contents

Acknowledgment

Abbreviation and Acronoyms

List of Tables

List of Figures

CHAPTER ONE: INTRODUCTION

1.1 Background of the Project

1.2 Statement of the Problem

1.3 Objectives of the Project

1.3.1 General Objective

1.3.2 Specific Object ives

1.4 Scope and Limitation of the Project

1.5 Significance of the Project

1.6 Beneficiaries of the Project

1.7 Methodology

1.7.1 Data gathering Methodology

1.7.2 Development Methodology

1.7.3 Development Tools

1.8 Feasibility Study

1.8.1 Economic feasibility

1.8.2 Technical Feasibility

1.8.3 Operational feasibility

1.9 Project Plan

1.9.1 Project Time Schedule


1.9.2 Budget Plan

CHAPTER TWO: REQUIREMENT ELICITATION

2.1 Overview of Existing System

2.2 Advantages of the existing system

2.3 Drawback of existing system

2.4 Proposed Solutions

2.5 Preferred solutions

2.6 Domain modeling with CRC card

2.7 Essential use case documentation

2.8 Essential user interface prototype

CHAPTER THREE: SYSTEM ANALYSIS

3.1 Overview of the new system

3.2 System Requirements

3.2.1 Functional Requirements


3.2.2 Non-functional Requirements
3.3 System modeling

3.3.1 System use case diagram

3.3.2 System use case Diagram Documentation

3.3.3 Sequence Diagram

3.3.4 Activity Diagram

3.4.5 Class Diagram

CHAPTER FOUR: SYSTEM DESIGN

4.1 Design Goals

4.2 System Architecture

4.3 Sub-system Decomposition


4.4 Hardware/Software Mapping
4.5 State chart Diagram

4.6 Collaboration Diagram

4.7 Deployment Diagram


4.8 Persistent Data Storage and Management

4.9 Graphical User Interface Design

CHAPTER FIVE: CONCLUSION AND RECOMMENDATIONS

5.1 CONCLUSION

5.2 RECOMENDATIONS

References

S-ar putea să vă placă și