Sunteți pe pagina 1din 2
REMOVAL RATIC 01 02 Ghost 2 & 6 01520 ww 100 vawes of BH o127 a FIG. 4 SEDIMENT REMOVAL FUNCTION PROPOSED BY CAMP FALL VELOCITY OF SEDIMENT. PARTICLE FORWARD VELOCITY OF FLOW IN DESILTING BASIN REQUIRED FALL VELOCITY OF SEDIMENT PARTICLE FLOW DEPTH IN DESILTING BASIN MIXING CO-EFFICIENT = 0.075 H JE SHEAR STRESS IN TANK = ¥ RS HYDRAULIC MEAN OEPTH ENERGY SLOPE DENSITY CF WATER REFERENCE ¢~ SEDIMENTATION AND DESIGN GF SETTLING TANKS PROC. ASCE VOL.71 NO. 4%, PART 1 APRIL 1965 oe * 90s 53 % 8 0-0] é, FALL VELOCITY IN m/ SEC 110 w10 10 16 OL OF 16! DIAMETER OF SEOIMENT PARTICLE IN mm F1G.12 FALL VELOCITIES OF PARTICLES : NOTE: CURVE NO.2 AND 3 PREPARED USING FIG.2 GIVEN IN THE PAPER BY THOMAS & CAMP SEDIMENTATION AND THE DESIGN OF SETTLING TANK PP 445 TO 486 PROCEEDING A.S.C. €. VOLUME NO: 7? NO. 4 PART 1, APRIL 1945. 51

S-ar putea să vă placă și