Sunteți pe pagina 1din 5

Muhammad Adam Imam

Date of birth: 16th October 1986

PERSONAL PROFILE
Address:1206/B Mumtazabad Colony Multan Pakistan.
Nationality: Pakistani

Mobile No. : +923033779737


Email: engr.adam@gmail.com Education Level: BSc Computer System Engineer (2002-2007)

OBJECTIVE / PROFESSIONAL PROFILE


A proficient learner with the vision of hard working and firm belief in Continuous Improvement, capable of working under the
supervision as a team and also able to work on own initiative.

RF professional with more almost 9 years experience of GSM,GPRS, EDGE ,WCDMA networks based on Nokia (BSS S12/S13/S14,S16 Flexi MR10
BTS, RG10,RG20,RG30,RG40 RU40 GPRS, EDGE and AMR Enabled Dual Band Network 900/1800, NETACT 4.2/ 5.2,6.0) and ZTE (OMCZXG10, V3
,V4 BSCs and latest NetNuemen EMS clients ). Extensive Experience in Vendor SWAPs Motorola, Ericsson, ZTE, to Nokia. RF Modernization from
Nokia Multi Radio, Siemens and Flexi EDGE to Nokia MultiRadio, SRAT to SRAN sites. Excellent working knowledge of Microsoft Excel and
NOKIA MML Commands.

PROFESSIONAL EXPERIENCE: (9 Years +)


Organization Designation Responsibilities Year of Service
NOKIA 2G RF RF Optimization for below given project scopes and got MARCH 2017- OCT 2017
(MADAGASCAR) Optimization acceptance from customer for agreed KPIs.
Consultant 1)Modernization of Multi Radio BTS to MultiRadio 10
2)Swap from Siemens and Flexi Edge BTS to MR10.
3)9 BSCs Upgrades from Flexi BSC SW upgrade to
GSM16
4)BTS Upgrade to EX16 after BSC Upgrades to GSM16.
5)TDMA Sites Migration to Packet Abis.
6)SRAT sites to SRAN sites Migration.
7)BSC Modernization to IP based transmission.
8)Band Refarming and for U900 Launch
9)XML creation for parameters modification.
10)OSC , TRHO , SD on 1800 layer activation to improve
the SDCCH and TCH Blocking after cut for U900.

ZTE 2G &3G RF 3G RF Planning and Optimization Engineer for Telenor JAN 2015- FEB 2017
(PAKISTAN) Optimization first 3G Rollout project in Pakistan. CSSR ,DCR,IRAT KPIs
Team Leader optimization and acceptance from customer on cluster
level and site level. Now moved at Vimplecom
Mobilink Pakistan as 2G/3G RF Optimization Consultant
for Ericsson to ZTE swap and MS project .
NOKIA 2G/3G RF RF Optimization on RG40 RU40 for 2G swap and 3G JUNE 2014 –DEC2014
(MOBILY SAUDI Planning & U900 Rollout for Daily KPI’s monitoring (CSSR,DCR
ARABIA) Optimization ,HOSR RRC Success Rate, RAB Success Rate , HSDPA
Consultant establishment Success Rate,IRAT,SHO,Throughput per
user) and troubleshooting of the worst cells.

NOKIA TO ZTE 2G &3G RF CSSR ,DCR,HOSR, PS KPIs optimization and acceptance APRIL 2013- JUNE 2014
SWAP Optimization from customer on cluster level and site level. Features
(PAKISTAN) Engineer. implementation to improve KPIs.
NOKIA 2G RF RF Optimization Consultant in Nokia for 3 swap projects NOV 2011-MARCH2013
(SOUTHAFRICA, Optimization in South Africa(Vodacom),Saudi Arabia(Mobily),
Consultant
SAUDIAARABIA, Iraq.These swap projects were successfully completed
IRAQ) and acceptance was obtained from customer. Cell level
KPIs acceptance criteria in Mobily and cluster level in
Others was successfully achieved.Strong use of MML
commands for extracting alarms and dump verification.

TELENOR(NOKIA) 2G RF Worked as RF Executive as internal Employee of


Planning and MARCH 2010 – AUG 2011
(PAKISTAN) Telenor Pakistan. Main responsibilities were to plan
Optimization new sites on Asset,TRX addition working for high
Engineer
blocking area,BSC dimensioning to improve KPIs.
Member of Customer Liasion Team to resolve the
customer complaints.BSC level KPIs analysis and
Optimization .
2G RF Paktel was acquired by china mobile and started its first JUNE 08 TILL MARCH 2010
ZONG(HUAWEI/ZTE) Planning and GSM rollout. Worked as RF Engineer as a internal
(PAKISTAN) Optimization Employee of China Mobile Pakistan for BSC level KPIs
Engineer monitoring and optimization, Sales Joint Visit complaint
resolutions, New sites planning and optimization.
SHANGHAI TELECOM RF Engineer Technical Site Surveys, DT of new sites, Cluster DTs, JUNE 07 TILL JUNE 2008
(PAKISTAN) Area Profiling, TSSRs, Project Coordination

Activities as 2G RF Optimization Engineer

 Daily KPIs(CSSR,DCR,Blocking,HOSR,TBF Success Rate) analysis and optimization of assigned BSC,Clusters.


 Sector swap detection by analysis of pre and post swap traffic .
 Escalation of zero PS data cells to operations and care team to rectify by GENA toggle.
 Neighbour Audit for swapped sites and proposed addition and deletion of neighbours where required.
 IASR improvement by RACH uplink access level and SLO,MAXRetrans Parameters
 TCH Blocking improvement by FRL/FRU,BTSLoadSeg Accesslevel min, CRO, PT, PBGTHO and VAMOS parameters.
 DCR Improvement by Accessmin, TRP shifting, HO Optimization and Frequency cleaning.
 SDR improvement by SDCCH Shifting, BSTXPWRMAX, RxAccessmin, T200F&S and Frequency Tuning.
 Improving TBF Success Rate by parameters BFG and TRP and CDED and CDEF parametres..
 POC trials adjustment to improve the KPIs like DCR,HOSR by reducing interference.
 HOC parameters modifications MinInterval, Emergency HO levels to improve HOSR.
 Routine neighbor audit of BSCs, analysis of per neighbor stats in cells having poor handover performance and to change
handover margins.
 Adjustments of idle mode boundaries by tweaking ACCMIN, C1, C2,CRH.
 FRL/FRU/NBLO Parameters setting for reduced TCH Blocking improving CSSR
 Recommendations for newly on-aired sites based on DT performed at the time of commissioning and analysis of Statistical
data.
 Inter MSC HO analysis and correction of wrong LACs contributing to HO failures.
 Making XML from plan edit for implementation in BSC.
 Frequency change where required to improve the KPIs.
 Making of BSC report for final acceptance after complete swap.

Activities as 3G RF Optimization Engineer

 To meet the agreed KPIs on the cluster level .To support the customer in daily tasks of optimization.
 Daily KPI’s monitoring (RRC Success Rate, RAB Success Rate , HSDPA establishment Success Rate,IRAT,SHO,Throughput per
user) and troubleshooting of the worst cells.
 3g Rollout sites pre-launch optimization.
 Reduce the Code congestion, CE blocking by shifting the traffic by Min RSCP and Ec/No level.
 IRAT HO improvement by modification of 2D/2F/3A profiles.
 HSDPA throughput improvement by codes and CQI reporting interval.
 Cell coverage reduction by QRxlevelmin and QQualmin value.
 Worst cell optimization on the basis of high access failure rate (including RRC&RAB failures) , high drop rate ,intra frequency
and IRAT failures etc
 Analyzing log file(RxLev, RxQual,CPICH RSCP, CPICH EcNo, Pilot Pollution) with Subcon coordinator to locate the bad patches
and low throughput areas.
 Addition or deletion of neighbor cells in order to improve the clusters. (3G-3G/3G-2G)
 Recommending the Physical changes (mainly up/down tilts, azimuth) to optimize the network.
 Swapped feeders Checking and pushing the integration teams to resolve this.

Nokia SWAP MDT Activities


 Parameters mapping verification from Nokia and ZTE dump during after MDT so that sites are on aired with pre swap
parameters.
 Lead the swap of Nokia and Ericsson to ZTE as swap lead.
 Swap detection by CI plot during swap from DT MAPINFO CI export.
 To check the Alarms during the swap of on aired sites .
 TCH Assignment Success rate verification during swap MDT to ensure on air site KPIs are fine.
 BCCH and sub-cell level difference check to ensure during swap MDT that site is on aired properly.
 Cell re-selection , HO attempts and success verification after swap MDT to ensure that old neighbors are deleted and new
neighbors are added properly so that HOSR KPI is fine and traffic distribution is fine .
 Parameters modifications after swap to reduce SDCCCH and TCH blocking due to fluctuations on neighbouring sites.
 Data and TCH Traffic verification of after swap by summing up the traffic on pre criteria.

Planning Part:

 Planning of new Sites coverage, quality and capacity .


 Generation of Coverage models in asset tool.
 Mapping of Parameters from Motorla and Ericsson dump for creation of swapped sites.
 Pre and Post audit of Dump to verify the mapped parameters.
 Problem resolution during MDT of swapped sites.
 Frequency Plan and Neighbour planning of new sites.
 MAIO Plan of new and swapped sites.
 MAL List creation of swapped sites and new sites.
 PSC planning of new sites.

DATA KPIs Optimization:


 Improving throughput by modifying CDED and CDEF values, Dynamic Timeslots, reducing interference by shifting traffic
on other band, PS allocation method, Using more Static PDTCH, HR Allocation algorithm.
 Improving TBF drop rate by modifying coding schemes ,Frequency cleaning, BEP value reduction.
 Improving TBF Success rate by BFG and CDED CDED and setting initial coding schemes of GPRS and EDGE,shifting traffic
to low TCH traffic band.
 Improving UL and DL blocking KPIs by increasing dedicated data timeslots and enabling more trx with data
capability and assigning them to EDAP pool.
 Analysis of Data KPIs and finding the reason of degradation on counter level and improvement of KPIs by improving that
counter degradation such as TBF allocation improvement by reducing TBF blocking and reducing interference on specific
band to improve allocation.

Special Projects:

 OSC Activation and Implementation to improve the TCH Blocking after U900.
 TRHO based HO enabled in Madagascar after launching U900.
 Worked on reduction of SD blocking for the whole region.
 Worked on reduction of HO per call.
 Worked on reduction of Location Updates through sites re-parenting and LAC modifications.
 IRAT HOSR improvement on network level .
 RTWP working on network level and proposed filters for external interference and Master Slave antenna issue resolution.
 Retuned parameters to push traffic from outer GSM to inner DCS zone in order to Optimize DCS utilization.

Technical Reports & Audits:


 Preparing Bi Weekly Global Drive Test reports for Major cities after log file analysis using TEMS and giving
recommendations to improve QOS.
 Weekly Technical report containing Red. Green and Yellow Flags for assigned clusters and sending this report to regional
Team Leader.
 Submitting Bench marking reports to customer after successful trials showing improvements in KPI’s.
 Making reports for TCH blocking, SDCCH blocking and Neighbor audits at network level.
 New Sites Health Report & initial QoS Monitoring for new sites.
 Periodic network level audit of cell parameters to remove discrepancies accumulating over a period of time.

TECHNICAL TRAININGS:
Nokia Siemens Networks BSC Dimensioning

TOOLS EXPERTISE:

1.TEMS Investigation 2.Asset 6.1

3.Optima 4.Net Act (Nokia)

5.MAP INFO 8.0 6.GOOGLE EARTH

7.Auto Cad 8. MCOM (Freq,BSIC,Neighbour plan.)

9. Plan Editor(Nokia) 10. SONAR(Vodacom Multi Vendor Statistics Handler)

11. Actix(Drive Test Analysis) 12. Tang(Nokia)

13. Minos(ZTE) 14. IBSC(Nokia)


15.M2000(Huawei) 16. Radar (Nokia Tool for Dump Comparison)

17.MUSA(Nokia Tool for Planning)

S-ar putea să vă placă și