1) For commercial size tanks, Pioneer Water Tanks requires a concrete ring beam foundation and some site preparation must be completed prior to installation.
2) For sloping sites, adequate retaining walls and drainage must be installed before tank construction is finished. Professional engineering advice should be sought for these requirements.
3) Tanks must be commissioned once construction is fully complete, following Pioneer Water Tanks' procedures. The tank should not be filled until it has been commissioned.
1) For commercial size tanks, Pioneer Water Tanks requires a concrete ring beam foundation and some site preparation must be completed prior to installation.
2) For sloping sites, adequate retaining walls and drainage must be installed before tank construction is finished. Professional engineering advice should be sought for these requirements.
3) Tanks must be commissioned once construction is fully complete, following Pioneer Water Tanks' procedures. The tank should not be filled until it has been commissioned.
1) For commercial size tanks, Pioneer Water Tanks requires a concrete ring beam foundation and some site preparation must be completed prior to installation.
2) For sloping sites, adequate retaining walls and drainage must be installed before tank construction is finished. Professional engineering advice should be sought for these requirements.
3) Tanks must be commissioned once construction is fully complete, following Pioneer Water Tanks' procedures. The tank should not be filled until it has been commissioned.
• For commercial size tanks, • For sloping sites, adequate • Tanks must be commissioned Pioneer Water Tanks requires a retaining and drainage must be upon completion of construction concrete ring beam foundation. installed prior to completion as per Pioneer Water Tanks Some exclusions apply. Please of the tank construction. commissioning procedures. consult Pioneer Water Tanks for Professional engineering If your tank has not been more details. advice should be sought on commissioned, Pioneer Water the retaining and drainage Tanks must be consulted prior to • It is necessary to construct a requirements. the filling of the tank. level area three to four metres larger than the diameter of the • Pioneer Water Tanks guidelines ring beam. The sand inside the have to be met to prevent re- ring beam should be a depth of charges for cost of additional 100 millimetres and compacted. remedial works that may be At least one metre clear area is required. In the event our crew required all around the tank for needs to stand down due construction. to delays or incomplete site preparations, additional costs will • Site preparation must be be incurred by the client. completed prior to the arrival of installers.