SITE AND FOOTING PREPARATION

TANK SITE REQUIREMENTS:


• For commercial size tanks, • For sloping sites, adequate • Tanks must be commissioned
Pioneer Water Tanks requires a retaining and drainage must be upon completion of construction
concrete ring beam foundation. installed prior to completion as per Pioneer Water Tanks
Some exclusions apply. Please of the tank construction. commissioning procedures.
consult Pioneer Water Tanks for Professional engineering If your tank has not been
more details. advice should be sought on commissioned, Pioneer Water
the retaining and drainage Tanks must be consulted prior to
• It is necessary to construct a requirements. the filling of the tank.
level area three to four metres
larger than the diameter of the • Pioneer Water Tanks guidelines
ring beam. The sand inside the have to be met to prevent re-
ring beam should be a depth of charges for cost of additional
100 millimetres and compacted. remedial works that may be
At least one metre clear area is required. In the event our crew
required all around the tank for needs to stand down due
construction. to delays or incomplete site
preparations, additional costs will
• Site preparation must be be incurred by the client.
completed prior to the arrival of
installers.