SECTION BB

HYDRAULIC PARTICULARS
B
B SI. FROM Km. 47.068
DESCRIPTION TO Km. 62.492
No.

CANAL 1 DISCHARGE REQUIRED(Cum/Sec) 11.449

2 DISCHARGE DESIGNED(Cum/Sec) 12.543

3 BED WIDTH(m) 4.600

4 F.S.D (M) 2.250

5 FREE BOARD (M) 0.90

6 BED FALL 1 in 10000

7 VALUE OF 'n' 0.018

8 VELOCITY (M/Sec) 0.699

9 SIDE SLOPES(I/O) 1.5:1


10 T.W OF BANKING (L/R) 7.0M/4.0M
11 GROUND LEVEL +241.418

PLAN 12 C.B.L. +237.173

13 F.S.L. +239.423

14 T.B.L. +240.323

15 NO. OF PUMPS 4 (RUNNING)+ 4 (STAND-BY)

16 DISCHARGE (Cum/Sec) 0.82565

17 EACH PUMP DISCHARGE (Cum/Sec) 0.2064