Job No_ MDGPC009

PILE Design As per IS 2911 (Part 4)


Column Dimensions
Column Shape: Rectangular
Column Length - X (Pl) : 300.000 mm
Column Width - Z (Pw) : 450.000 mm
Pile Cap Geometrical Data
Pile Cap Length PCL = 900.000 mm
Pile Cap Width PCW = 2250.000 mm
Initial Pile Cap Thickness t I = 300.000 mm
Pile Geometrical Data
Pile spacing Ps = 1350.000 mm
Pile Edge distance e = 450.000 mm
Pile Diameter dp = 450.000 mm
Pile Capacities
Axial Capacity PP = 294.000 kN
Lateral Capacity PL = 152.980 kN
Uplift Capacity PU = 189.000 kN
Material Properties
Concrete fc = 0.025 kN/mm^2
Reinforcement fy = 0.415 kN/mm^2
Concrete Cover
Bottom Clear Cover CCB = 75.000 mm
Side Clear Cover CCS = 100.000 mm
Pile in Pile Cap PCP = 100.000 mm
Loading Applied At Top of Cap
Fx Fy Fz Mx My Mz
Case
(kN) (kN) (kN) (kNm) (kNm) (kNm)
101 -2.334 -313.264 -15.802 4.206 0 -0.616
103 -3.179 -373.459 -19.783 5.309 0 -0.849
113 -18.79 -306.936 -16.531 5.103 0 -12.307
115 -2.455 -325.483 -24.896 19.539 0 -0.69
117 14.122 -319.592 -15.073 3.309 0 11.074
119 -2.213 -301.044 -6.709 -11.127 0 -0.543

MDGPC009 14.102019
Job No_ MDGPC009

121 -2.543 -298.767 -15.826 4.247 0 -0.679


125 2.543 298.767 15.826 -4.247 0 0.679
129 -15.708 -293.705 -16.409 4.965 0 -10.032
131 -2.64 -308.543 -23.101 16.513 0 -0.738
133 15.708 293.705 16.409 -4.965 0 10.032
135 2.64 308.543 23.101 -16.513 0 0.738
201 -3.501 -469.896 -23.703 6.309 0 -0.925
202 -4.768 -560.188 -29.674 7.963 0 -1.273
203 -3.052 -358.52 -18.991 5.096 0 -0.815
207 -18.849 -352.446 -19.691 5.957 0 -12.038
208 -3.168 -370.251 -27.721 19.816 0 -0.886
209 12.746 -364.595 -18.292 4.235 0 10.408
210 -2.936 -346.79 -10.261 -9.623 0 -0.744
211 -2.801 -375.916 -18.963 5.047 0 -0.74
215 -22.548 -368.323 -19.837 6.124 0 -14.768
216 -2.946 -390.58 -29.875 23.447 0 -0.828
217 16.946 -383.51 -18.088 3.971 0 13.289
218 -2.656 -361.253 -8.05 -13.352 0 -0.651
219 -2.101 -281.937 -14.222 3.786 0 -0.555
223 -21.848 -274.344 -15.097 4.862 0 -14.583
224 -2.246 -296.601 -25.134 22.185 0 -0.643
225 17.646 -289.531 -13.347 2.709 0 13.474
226 -1.956 -267.274 -3.31 -14.614 0 -0.467

TWO PILE CAP DESIGN CALCULATION


Pile Reactions
Arrangement Reaction
Pile X Y Axial Lateral Uplift
No. (mm) (mm) (kN) (kN) (kN)
1 0 -675 -288.383 15.027 0
2 0 675 -286.992 15.027 0

MDGPC009 14.102019
Job No_ MDGPC009

Pile Cap Thickness Check

Calculated Thickness (t) = 592.000 mm

Check For Moment

Critical Load Case:

Moment along Moment along


Pile No.
x1-x1(kNm) x2-x2(kNm)
1 -0.962 -0.962
2 -0.958 -0.958

Check For One way Shear:

Shear Force Shear Force


Pile No.
x1-x1(kN) x2-x2(kN)
1 -398727.25 0
2 0 -338388.769
TOTAL -398727.25 -338388.769

Calculation of Maximum Bar Size


MDGPC009 14.102019
Job No_ MDGPC009

Selected maximum bar size = 32

Bar diameter corresponding to max bar size (db) = 1.260 in

As Per IS 456 2000 Clause No 26.2.1

Required Development Length = 1289.462 mm

Actual Development Length = 200.000 mm

for straight bar,Requiredld >Availableld Redesign or rearrange bars

Selection of Reinforcement

Critical Load Case : 202

Governing moment (Mtl) = -1.920 kNm

MDGPC009 14.102019
Job No_ MDGPC009

Column Dimensions

Column Shape : Rectangular

Column Length - X (Pl) : 300.000 mm

Column Width - Z (Pw) : 450.000 mm

Pile Cap Geometrical Data

Pile Cap Length PCL = 2250.000 mm

Pile Cap Width PCW = 2069.100 mm

Initial Pile Cap Thickness tI = 300.000 mm

Pile Geometrical Data

Pile spacing Ps = 1350.000 mm

Pile Edge distance e = 450.000 mm

Pile Diameter dp = 450.000 mm

Pile Capacities

Axial Capacity PP = 294.000 kN

Lateral Capacity PL = 152.980 kN

Uplift Capacity PU = 189.000 kN

Concrete Cover

Bottom Clear Cover CCB = 75.000 mm

Side Clear Cover CCS = 100.000 mm

Pile in Pile Cap PCP = 100.000 mm

Load Fx Fy Fz Mx My Mz
Case (kN) (kN) (kN) (kNm) (kNm) (kNm)

MDGPC009 14.102019
Job No_ MDGPC009

101 -18.837 -378.449 -5.292 1.472 0 -5.178


103 -26.171 -454.687 -6.941 1.94 0 -7.205
113 -25.419 -409.158 -3.242 -0.954 0 -14.074
115 -18.854 -375.381 -18.034 18.358 0 -5.224
117 -12.255 -347.741 -7.342 3.899 0 3.718
119 -18.82 -381.517 7.451 -15.413 0 -5.133
121 -20.937 -363.75 -5.553 1.552 0 -5.764
125 20.937 363.75 5.553 -1.552 0 5.764
129 -26.202 -388.317 -3.913 -0.389 0 -12.881
131 -20.95 -361.295 -15.747 15.06 0 -5.801
133 26.202 388.317 3.913 0.389 0 12.881
135 20.95 361.295 15.747 -15.06 0 5.801
201 -28.256 -567.674 -7.937 2.209 0 -7.767
202 -39.256 -682.031 -10.411 2.91 0 -10.808
203 -25.124 -436.5 -6.663 1.863 0 -6.917
207 -31.442 -465.98 -4.695 -0.467 0 -15.457
208 -25.14 -433.554 -18.896 18.072 0 -6.961
209 -18.806 -407.019 -8.631 4.193 0 1.623
210 -25.108 -439.445 5.57 -14.347 0 -6.873
211 -22.605 -454.139 -6.35 1.767 0 -6.214
215 -30.503 -490.989 -3.89 -1.145 0 -16.889
216 -22.625 -450.457 -21.641 22.029 0 -6.269
217 -14.706 -417.289 -8.81 4.679 0 4.461
218 -22.584 -457.821 8.941 -18.495 0 -6.159
219 -16.953 -340.604 -4.762 1.325 0 -4.66
223 -24.851 -377.455 -2.302 -1.587 0 -15.335
224 -16.973 -336.923 -20.054 21.587 0 -4.715
225 -9.055 -303.754 -7.222 4.238 0 6.014
226 -16.933 -344.286 10.529 -18.937 0 -4.606

THREE PILE CAP DESIGN CALCULATION


MDGPC009 14.102019
Job No_ MDGPC009

Pile Reactions

Total pile number N = 3

Arrangement Reaction
X Y Axial Lateral Uplift
Pile No.
(mm) (mm) (kN) (kN) (kN)
1 -389.745 -675 -236.32 13.538 0
2 779.423 0 -234.898 13.538 0
3 -389.745 675 -236.004 13.538 0
Pile Cap Thickness Check

Calculated Thickness (t) = 988.000 mm

Check for Moment (Along Base Beam)

Check for Moment (Along Alternate Beam)

Check for One Way Shear (Along Base Beam)

MDGPC009 14.102019
Job No_ MDGPC009

Check for One Way Shear (Along Alternate Beam)

MDGPC009 14.102019
Job No_ MDGPC009

Calculation of Maximum Bar Size

Selection of Reinforcement

Along Base Beam

Critical Load Case : 202

Along Alternate Beam


MDGPC009 14.102019
Job No_ MDGPC009

MDGPC009 14.102019