LNG to Power
MAN Energy Solutions as “one shop” solution provider
LNG unloading
LNG transfer
Logistics
LNG Carrier
Offloading bay
Container
Discharge jetty
Feeder ship Local storage
Semi-trailer
Re-gasification
LNG receiving Rail car
terminal
Pipeline
Power plant
Loading bay
https://blogs.platts.com/2018/11/08/thermal-coal-lng-northeast-asia-relative-cost-insights/
https://www.meti.go.jp/english/statistics/sho/slng/index.html
Low High
USD / MMBbtu USD / MMBbtu
5.00
FOB Price Asia 7.00
(October 2019)
Large vessel transportation 1.00 1.1
Breakbulking terminal 0.80 1.0
Small vessel transportation 1.00 1.3
Receiving regas and storage 1.50 1.5
TOTAL (Plant Gate) 9.30 11.5
ICP August 2019 57.97 USD/barrel
14.5% ICP (Permen ESDM No 45/2017) 8.35
Ø Prices close to regulation requirement might be possible with logistic optimization with today scenario
Ø MEMR shall review regulation of gas price for power plants!!
€/kW OPEX. assumes 20% local tax rate and 10% cost of
capital (WACC) for a 20-year project lifetime
https://www.youtube.com/watch?v=zKfIfuqPFXI
Success criteria's
1. Global LNG infrastructure, volume and a price building mechanism offers huge
opportunities for developers and policy makers to switch to natural gas as main fuel. As
well international acting banks and development banks supporting natural gas
projects on the transition path into a renewable energy industry.
2. Available small scale LNG infrastructure is now available and price wise
competitive as support for an more sustainable electricity generation. Total cost for
LNG /natural gas at site is now competitive to oil based fuels. With a global trade
mechanism for CO2 this trend will be more leveraged and promoted.
3. Highest efficient prime mover technology with a low CO2 footprint like engine
based technology and combined cycle offers the highest conversion rate from fuel
into electricity – the source which powers local competitive economical development.
• Attract additional off-takers for LNG use / develop robust and bankable business
case
• Logistic concept for LNG /NG distribution “Hub and Spoke Strategy”
• Storage concept; stationary vs. floating, “right” sizing etc.
b a n k s g iv e them the
o a l p la n t s fl o under as Institute for Energ
Asia's c (IEEFA) 2019: Coal
y Economics and
Financial Analysis
cold shoulder n s h a v e q u it coal since ballooning, renew
pipeline shrinking
, stranded asset ri
ancial instituti o ables ever cheap sk
th a n 1 0 0 fi n Coal fleets represe er
More nt huge financial
February. o a l-fi re d p o w er plants are and investors writ
e Tim Buckley IEE
risk to sharehold
ers
’s c o al d e v e lo pers and c e e p a fl o a t a s global Finance Studies, K FA’S Director of Ene
ate Finlayson the or rgy
Asia
b u il d n e w m arkets and k to avoid
Communications S
trategist.
ganisation’s Senio
r
tr ug g li ng to k s o n th e m
s
tu ti o n s tu rn their bac
financial in s ti
n g e, R e u te rs reports.
climate ch a nging,” said
criticism over financing is v e r y c h a ll e
p o w e r p la n t x e c u t iv e Officer
“ C oa l ro , Deputy Ch ie f E
Dharma D jo jo n e g o
e r , th e p o w e r generation
o n e s ia ’s P T Adaro Pow al m in er PT Adaro
of Ind s econd-larg e s t c o
e c o u n tr y’s
unit of th
Energy.
ne ar s E PC deal
First Gen LN G project
ne d
for plan
Development steps
1. Calculating the cost of electricity powered by LNG
2. Give the indication if a fuel switch pays off for the country or not!
Public Carsten Dommermuth– Future Energy Show Philippines in Manila – ©2019 08/09/2019 21
Practical case LNG to Power
Indonesia Islands – a great opportunity for small scale LNG
Reference Power Plant sizes Is the current tariff sufficient for new investments
4x 14V51/60DF 40 USD/MWh
50 MW
* Natural Gas price of 40 USD/MWh (11.5 USD/MMBTU) including all delivery costs for free at site logistics (HHV) – 14 days
storage required at site. All plants running under base load > 7.500 annual operating hours
Contract award
in May 2017
Construction time
15 month
O&M contract
for 5 years
“50MW” – DF 50,9MWnet
Project KPIs Value
Owners cost
EPC plus interest during 47.2 MUSD
construction and infrastructure
Natural gas LHV free at site Gas price based on 11.5 USD/MMbtu
(plus 5°C / 6 bar) (Escalation rate 5%/a)
Weighted Average Cost of
10%
Capital (WACC)
“50MW” – DF 50,9MWnet
Production costs Incl. LNG
Annual operating hours of the power plant
new power plant only infrastructure
5.000h USD/MWh 91.4 94.1
Mid-merit
5.500h USD/MWh 88.8 91.5
6.000h USD/MWh 86.7 89.3
6.500h USD/MWh 84.9 87.4
7.000h USD/MWh 83.4 85.9
7.500h USD/MWh 82.1 84.6 Base-load
8.000h USD/MWh 80.9 83.3
Focus on the base-load operating mode above 7.500 annual full-load hours
350.0
€/ MWh Tariff: 130 -140 USD/MWh
300.0 i.e. NTT, Maluku. Papua
85% BPP average
250.0
200.0
100.0
50.0
Running hours / a
0.0
500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500
Gas engine plant 50MW 20V35/44G TS 277.3 166.9 130.1 111.7 100.6 93.3 88.0 84.1 81.0 78.6 76.6 74.9 73.5 72.3 71.2 70.3 69.5
Dual Fuel plant 50 MW 14V51/60DF 305.5 181.1 139.6 118.9 106.5 98.2 92.2 87.8 84.3 81.6 79.3 77.4 75.8 74.5 73.3 72.2 71.3
Gas engine plant 100MW 18V51/60G TS 270.2 163.4 127.7 109.9 99.3 92.1 87.0 83.2 80.3 77.9 76.0 74.3 73.0 71.8 70.8 69.9 69.1
Dual Fuel 100 MW 18V51/60DF 295.5 176.1 136.2 116.3 104.4 96.4 90.7 86.5 83.1 80.5 78.3 76.5 75.0 73.7 72.5 71.5 70.7
Huge lever with high efficient state-of the art equipment to reduce the current subsidies tariff
Production costs with new equipment 80-82 USD/MWh
Development steps
1. Calculating the cost of electricity powered by LNG
2. Give the indication if a fuel switch pays off for the country or not!
Public Carsten Dommermuth– Future Energy Show Philippines in Manila – ©2019 08/09/2019 27
Practical case LNG to Power
Indonesia Islands – a great opportunity for small scale LNG
LNG powered
1. Clear leadership management to support the change towards high efficient new, state of the
art generating technology based on natural gas! Also as support for non-dispatchable
renewables
“Stop subsidizing a old high money consuming energy system”
2. Local governments: Take the lead in an “hub and spoke strategy” to bring LNG to the remote
locations (small scale infrastructure)
Support FDI´s and local investors in investing in a modern energy system what can
support the national GDP development.