Sunteți pe pagina 1din 60

IS YAPI AS

COMPANY PRESENTATION
ABOUT US
We, as IS YAPI, design and supply high quality, precision engineered steel structures and all facade
solutions to commercial, industrial and residential projects. We understand how the whole building
works and the importance of the interdependence between the various structural elements. With over
twenty years of experience, we provide complete engineering support to contractors and companies, for
all types of facade cladding, structural steel applications and frame systems.

SELGUK established in 1998 and IS YAPI in 2003, is proud to have been involved with some of the
regions’ most challenging projects. Our brand SELFIX have proved to be a brand highly demanded
both in the Middle East and international markets with our façade cladding systems and structural steel
applications.
PROJECTS
We had the privilege to work in such prestigious projects like Conference Palace
(Emirates Palace) Hotel in Abu Dhabi and Emirates Towers in Dubai.

Our customers include Abu Dhabi Public Works, ADNOC, Al Futtaim, Al Ghurair, Al
Jaber, American Hospital, Arabian Aluminum, Arabtec, Commercial Bank of Dubai,
Dar Al Rokham, Dubai Aviation and Dubai Municipality, Juma Al Majid, Nurol and
Samji Stone in UAE. In Qatar, Kuwait and Saudi Arabia we have such distinguished
clients as Brookfields Multiplex, Qatar Petroleum, RTCC, Saudi Oger and Hyundai.

We have also supplied and installed fixing systems for US Embassy buildings in Turkey,
Georgia, Pakistan, Ghana and Mali. In Turkey we have provided structural steel and
fixing systems solutions to Eczacibasi Holding in their Kanyon Shopping Mall project
and installed steel structures and roof solutions to Gordion Mall, TED Sport Complex
and Turkish Army in Ankara.

Moreover, we have worked with Nurol LLC in their Abu Dhabi Marina City Project in
UAE; with ANGMP in their Commercial Bank of Doha Headquarters Project in Qatar and

PROJE
Musheireb Downtown Project in Doha with esteemed companies including Arabtec
Construction, Brookfields Multiplex, Deemah Stone, Dar al Rokham, Fino International
and Samji Stone. Please visit our references page for a full list of completed projects.

This success is based on our product diversity and quality approach accompanied by
our competitive, prompt, flexible and customer-oriented service approach.

With Head Office in Ankara, factory in Izmir, an office and a warehouse in Dubai and
three representations in Doha, Riyadh and Istanbul, IS YAPI, with it’s subsidiary
SELGUK is well positioned in Europe, the Middle East and the Arabian Peninsula.
OPERATIONS
Our advanced design and robust production techniques, coupled with commitment to
a rigorous quality control system, assure that all products meet customer specifications.
The design and fabrication of steel structures and complete fixing systems are strictly
controlled within the tolerances using the latest technologies. Our aim is to provide
the most reliable and cost efficient, custom tailored engineering solutions adhering to
specific project requirements, environments and international standards. Our talented
engineers and design staff, with extensive design experience and structural expertise will
provide you with the most efficient solution available, implementing BS, ASTM, DIN and
Euro Norm standards throughout the process. Evidence of this approach can be found

ECTS
within the entire organization that has proved its effectiveness in timely completion of
projects in the region.

Timely delivery and secure completion of high quality projects is ascertained by our
qualified and experienced staff complemented by reliable material and transport
solutions providers. We have the ability to take on any major project in our 4,000 m2
factory capable of manufacturing 20,000 fixing system sets daily. It is equipped with
modern machinery in 15 different stations and is controlled by state-of-the-art fully
automated process control systems. It is conveniently located in Izmir, harnessing
excellent infrastructure of an industrial zone and transportation facilities of two nearby
international ports and an airport.

Whether the project demands a cost effective, functional or an architecturally driven


solution, our approach is to design, manufacture and deliver the most efficient solution
to meet those needs. We actively seek design opportunities where our early involvement
can bring great benefits to both cost and schedule of the project. Our utmost goal is to
deliver a solution that encourages repeat and recommended business.

With our highly qualified employees, we are confident that we can deliver cost
effective fixing and steel structure solutions and add value to your projects with our
extensive products and expertise.

Please see our references pages comprising of highly professional companies and
prestigious projects.
CORE COMPETENCIES
• HEAVY & LIGHT WEIGHT STEEL STRUCTURES

• STONE & PRECAST FIXING SYSTEMS

• PLASTER & BLOCK WORK ACCESSORIES

• CEILING SUSPENSION SYSTEMS &

PARTITIONS

• CONCRETE METAL ACCESSORIES

• STEEL STRUCTURES FOR SOLAR PANEL

SYSTEMS AND ELEVATOR SYSTEMS

• SPACE FRAME SYSTEMS

• GENERAL TRADING
ESTIMATION
DESIGN
ENGINEERING
FABRICATION
QUALITY CONTROL
DELIVERY
INSTALLATION
U FIX

Z FIX

C FIX

L FIX
C-FIX SYSTEM
The C-FIX fixing system is designed by SEL-FIX and commonly used in the Middle East projects. It is a
secure and economic method of installing slabs. These anchors are preferred due to their loading capacity
for large cavities and optimal structural performance. Three dimensioanl adjustability allows quick and
easy installation of natural slabs. The C-FIX system provides the sector with strong, reliable and easy to fix
solution. The C-FIX system may be installed on concrete as well as other surfaces as steel structure and
block work. The connection to the structure will be defined as structure itself.

Installation of horizontal joints with C-FIX system:


Suitable for concrete and block walls for cavities between 60-250 mm
Slabs are pinned from the bottom and upper sides
Anchors are fixed on to concrete and block walls with expansion bolts
Anchors act as load bearing carrying half the weight of the slb above
Anchors also act as restrain holding the slabs below against wind suction and pressure
Anchors are adjustable in three axis allowing quick and easy installation
Z-FIX SYSTEM
The Z-FIX system may be installed on concrete as well as other surfaces as steel structure and block
work. It is the most common method used and is preferred for its three dimensional adjustability,
which enables easy and quick installation.

Suitable for all types of structures


Suitable for cavities of 40-200 mm
The anchorage system acts as load bearing and restrain
Anchors are adjustable in three dimensions to improve quality and performance
S-FIX SYSTEM
The S-FIX system is a strong, reliable and easy to fix solution suitable for larger cavities.

L-FIX SYSTEM
The L-FIX system is a strong, reliable and easy to fix solution. The L-FIX system may be installed on
concrete as well as other surfaces as steel structure and block work. The connection to the structure will
be defined as structure itself.
U-FIX SYSTEM

The U-FIX system is commonly used on steel structures. It is designed to provide facades with simple,
strong and low-cost solution. The U-FIX system can be used on horizontal joints and vertical (with weld
plate) joints

UP-DOWN SYSTEM
KERF SYSTEM

The KERF system is used generally to support weak stones amd facades with non regular stone paneling. It is
strong, easy to install and safe.

HONEYCOMB SYSTEM
PRECAST

TERRACOTTA
UNDERCUT

ACCESS DOOR
STEEL STRUCTURES
STEEL STRUCTURES
ACCESSORIES
ACCESSORIES
2006-KANYON SHOPPING MALL (ISTANBUL, TURKEY)
ECZACIBASI HOLDING-ARUP
2003-SHANGRI-LA HOTEL (DUBAI, UAE)
AL JABER - NORR
2007-GRAND MOSQUE SH. ZAYED THE SECOND (ABU DHABI, UAE)
PUBLIC WORKS DEPARTMENT-HALCROW
2007-USAID ANNEX FOR U.S. EMBASSY TBLISI (TBLISI, GEORGIA)
U.S DEPARTMENT OF STATE-KARN CHARUHAS CHAPMAN & TWOHEY
2006-KANYON SHOPPING MALL (ISTANBUL, TURKEY)
ECZACIBASI HOLDING-ARUP
2013-MILITARY WAREHOUSE (ANKARA, TURKEY)
MSB-
2008-TURK EGITIM DERNEGI SPORT COMPLEX (ANKARA, TURKEY)
TED VAKFI-UYGURER INSAAT
2010-PRINCESS NOORAH UNIVERSITY RIYADH (RIYADH, SAUDI ARABIA)
SAUDI OGER-DAR AL HANDASAH
2001-ABU DHABI MALL & OFFICE, RESIDENCE BLDGS PHASE 2-3 (ABU DHABI, UAE)
HH SHEIKH SUROOR BIN MOHD AL NAHYAN-CANSULT
2008-GORDION SHOPPING MALL (ANKARA, TURKEY)
REDEVCO-RENK YOL, KOROGLU, GURTAS
2013-ABU DHABI ISLAMIC BANK HQ (ABU DHABI, UAE)
AL HABTOOR-BOVIS, WOODS BAGOT, BG&E, HILSON MORAN, AL HABTOOR LEIGHTON
2015-AL HABTOOR PALACE (DUBAI, UAE)
LEVER BMT-KHATIB & ALAMI, HABTOOR LEIGHTON
2010-BAB AL QASR (ABU DHABI, UAE)
NUROL LLC-DAR AL HANDASAH
2015-AMERICAN EMBASSY CAMPUS ACCESS PAVILLION (ANKARA, TURKEY)
U.S DEPARTMENT OF STATE-D&K, TRISON CONSTRUCTION
2015-ABU DHABI MARINA CITY PLOT C2 (ABU DHABI, UAE)
NUROL LLC-WS ATKINS AND PARTNERS OVERSEAS
2012-DOWNTOWN DUBAI BOULEVARD 29 (DUBAI, UAE)
DAR AL ROKHAM-HOLFORD ASSOCIATES, AL FUTTAIM CARILLION
2002-COMMERCIAL BANK OF DUBAI (DUBAI, UAE)
COMMERCIAL BANK OF DUBAI-NORR
2005-CONFERENCE PALACE HOTEL PACKAGE 13A, 14B, 17, 18 (ABU DHABI, UAE)
PUBLIC WORKS DEPARTMENT-KEO, TURNER
2009-CONRAD HOTEL (DUBAI, UAE)
ARABIAN ALUMINIUM-ATKINS
2007-USAID ANNEX FOR U.S. EMBASSY BAMAKO (BAMAKO, MALI)
U.S DEPARTMENT OF STATE-KARN CHARUHAS CHAPMAN & TWOHEY
2007-DUBAI FESTIVAL CITY INTERCONTINENTAL HOTEL (DUBAI, UAE)
AL FUTTAIM-MAZARAKI
2007-DUBAI FESTIVAL CITY PACKAGE 8A, 8B (DUBAI, UAE)
AL FUTTAIM-MAZARAKI, HOK & JERDE
2014-HYATT HOTEL HEALTHCARE CITY (DUBAI, UAE)
LEVER BMT-
2007-DUBAI FESTIVAL CITY CROWN PLAZA HOTEL (DUBAI, UAE)
AL FUTTAIM-MAZARAKI
2008-DUBAI METRO (DUBAI, UAE)
AL HABTOOR ENGINEERING-SYSTRA
2007-EMIRATES NEW HEAD QUARTERS (DUBAI, UAE)
DUBAI CIVIL AVIATION-
1998-EMIRATES TOWER (DUBAI, UAE)
AL HABTOOR MARBLE-NORR
2007-GRAND MOSQUE FOR SH. ZAYED THE SECOND PACKAGE 10-25 (ABU DHABI, UAE)
PUBLIC WORKS DEPARTMENT-HALCROW
2003-NATIONAL BANK OF ABU DHABI HQ (ABU DHABI, UAE)
NATIONAL BANK OF ABU DHABI-CRSS
2013-MUSHEIREB HEART OF DOHA PHASE 1A (DOHA, QATAR)
DAR AL ROKHAM-TIME QATAR, BURNS AND MCDONNELL, HYUNDAI
2015-MUSHEIREB DOWNTOWN DOHA PHASE 1B (DOHA, QATAR)
DAR AL ROKHAM-TIME QATAR, BURNS AND MCDONNELL, AEB, GULF, CARILLION QATAR
2014-MUSHEIREB DOWNTOWN DOHA JK1 (DOHA, QATAR)
SAMJI STONE-TIME QATAR, BURNS AND MCDONNELL, J.MCASLAN&PARTNERS, HBK
2015-MUSHEIREB DOWNTOWN DOHA PHASE 3 (DOHA, QATAR)
FINO INTERNATIONAL WLL-TIME QATAR, GENSLER, CEG, OBAYASHI, HBK
2014-EDUCATION CITY NATIONAL LIBRARY (DOHA, QATAR)
DAR AL ROKHAM-ASTAD, OFMEA, LOUIS BERGER, BROOKFIELDS MULTIPLEX
Headquarters

Koza Sok. No:37/7


Gaziosmanpasa, 06700 Ankara, Turkey
Tel: +90 312 427 00 01
Fax: +90 312 427 00 02
Email : info@is-yapi.com
Website: www.is-yapi.com and www.sel-fix.com

Factory

Ataturk Organize Sanayi Bolgesi


10001. Sok. No: 26
Cigli, Izmir, Turkey
Tel: +90 232 328 20 02
Fax: +90 232 328 20 01

Dubai Office

IS YAPI AS
SELGUK BMT
Al Kawakeb Property No: 49, 13.Street 8A
Al Quoz Industrial Area 2, PO Box: 35791, Dubai, UAE
Tel: +971 4 339 35 68
Fax: +971 4 339 27 95
AZERBAIJAN
GEORGIA

ISTANBUL

ANKARA
IZMIR [HEAD OFFICE]
[FACTORY]

KUWAIT
BAHRAIN
QATAR PAKISTAN
SAUDI
ARABIA QATAR
UNITED
RIYADH [OFFICE] DUBAI
[OFFICE] [OFFICE] ARAB
EMIRATES
MALI

GHANA
Koza Sok. No:37/7 Gaziosmanpasa, Ankara, Turkey
Tel: +90 312 427 00 01 | Fax: +90 312 427 00 02
info@is-yapi.com | www.is-yapi.com | www.sel-fix.com

S-ar putea să vă placă și